Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | ₹6.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.4 LRejected-Finance | ₹7.4 L | L2 | Rejected-Finance Highest quoted rate |
| 3 | L3₹9.0 LRejected-Finance | ₹9.0 L | L3 | Rejected-Finance Highest quoted rate |
| 4 | Rejected-Technical | - | - | Rejected-Technical EMD, Trade License and P.Tax documents not submitted |
| Sl No | Description | Qty | Unit | ROAD INFRASTRUCTURE CONSULTANT L1 | ALFRESCO CONSTRUCTION SERVICES L2 | Rooj Consultancy Services L3 |
|---|---|---|---|---|---|---|
| 1.00 | Structural evaluation of Pavement by cutting pit with photograph (and filling of the excavated pit), Conducting traffic census for a continuous period of 7 days (7 x 24 hrs), Drone shoot videography throughout the road, Axle Load Survey and design of flexible/ Rigid/ paver block pavement and submission of DPR (6 copies) as per IRC guideline and as per instructions of Engineer-in-charge in connection with “Bolpur- Nanoor road from 0.00 kmp to 19.00 kmp, strengthening work under Birbhum Division, PWD in the district of Birbhum during the year 2026-27. | 1 | Job | 3,75,000 ₹3,75,000 Lowest | 4,20,000 ₹4,20,000 | 5,32,000 ₹5,32,000 |
| 2.00 | Carrying out Falling Weight Deflectometer (FWD) Test and other necessary field works & calculations as per IRC guideline and as per instructions of Engineer-in-charge.
(a) For Bolpur- Nanoor road from 0.00 kmp to 19.00 kmp under Bolpur Sub Division, PWD. Total length 19.00 km.
(b) For Md. Bazar Sainthia road from Ch. 6.00 km to 11.50 km under Rampurhat Sub Division, PWD. Total length 5.50 km.
(Payment will be made on the basis of the actual work done.) | 24.5 | Km | 12,500 ₹3,06,250 Lowest | 13,000 ₹3,18,500 | 15,000 ₹3,67,500 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
30 May 2026, 2:00 pmClosed
EXECUTIVE ENGINEER BIRBHUM DIVISION PWD
SURI
AS Per NieQ
2026_WBPWD_5014368_1
WBPWD/EE/BIR/NIeQ-10/2026-27
Open Tender
CIVIL WORKS
Item Wise
30 days
SURI
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
Yes
20 Jul 2026
21 May 2026
1 Jun 2026
21 May 2026
30 May 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Structural evaluation of Pavement by cutting pit with photograph (and filling of the excavated pit), Conducting traffic census for a continuous period of 7 days (7 x 24 hrs), Drone shoot videography throughout the road, Axle Load Survey and design of flexible/ Rigid/ paver block pavement and submission of DPR (6 copies) as per IRC guideline and as per instructions of Engineer-in-charge in connection with “Bolpur- Nanoor road from 0.00 kmp to 19.00 kmp, strengthening work under Birbhum Division, PWD in the district of Birbhum during the year 2026-27. | 1 | Job | - | - |
| 2 | Carrying out Falling Weight Deflectometer (FWD) Test and other necessary field works & calculations as per IRC guideline and as per instructions of Engineer-in-charge.
(a) For Bolpur- Nanoor road from 0.00 kmp to 19.00 kmp under Bolpur Sub Division, PWD. Total length 19.00 km.
(b) For Md. Bazar Sainthia road from Ch. 6.00 km to 11.50 km under Rampurhat Sub Division, PWD. Total length 5.50 km.
(Payment will be made on the basis of the actual work done.) | 24.5 | Km | 1 | ₹24.5 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_5082405.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].