| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98,708Accepted-AOC 134 1 SAKTHI THEATER STREET NEHRU NAGAR KARUMALAIKOODAL METTUR DAM 02 | METTUR DAM | TAMIL NADU | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Natesan Engineering Contractor L1 |
|---|---|---|---|---|
| 1.00 | Charges for Removal of LT modules from the racks, cleaning, tightness checking of all components and terminals, lubrication and racking, in the concerned racks.a) Charges for cleaning 1/3 & 1/8 size LT Modules. | 97 | Nos | 100 ₹9,700 Lowest |
| 2.00 | b) Charges for cleaning ½, ¾ size & Full size LT Modules. | 177 | Nos | 201 ₹35,577 Lowest |
| 3.00 | c) Charges for cleaning of 150 KW Modules. | 8 | Nos | 805 ₹6,440 Lowest |
| 4.00 | Charges for Removal of LT breakers from its chamber, cleaning the breakers, tightness checking of all bolts and nuts, applying lubrication, checking the trip & close operations of the breakers and put back the breakers in the breaker chamber | 8 | Ltrs | 1,615 ₹12,920 Lowest |
| 5.00 | Charges for Checking of the tightness of all bus bar joints, cleaning of the bus bars, cleaning of FRB Insulation sheets. | 82 | Nos | 155 ₹12,710 Lowest |
| 6.00 | Charges for Removing the top covers and cleaning the main bus, Cleaning of Bus ducts and Main bus from Service Transformer to Incomer panel. | 3 | Nos | 6,095 ₹18,285 Lowest |
| 7.00 | Material cost for CRC (500ml) | 6 | Nos | 420 ₹2,520 Lowest |
| 8.00 | Cost of Consumables for cleaning LT switchgear at AHPH | 1 | Nos | 1,685 ₹1,685 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
22 May 2025, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-II SD-III Cleaning of the main busbars, vertical bus dropppers, LT breaker panels, LT breakers and LT modules of LT switchgear at AHPH Units - I, II, IV during respective Unit AOH COH for the year 2025-26
2025_EB_555314_1
CE-MTPSI-SE-ES-EMII-OT24-25-26
Open Tender
Electrical Works
Works
15 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹1,000
Yes
14 Mar 2026
8 May 2025
23 May 2025
8 May 2025
22 May 2025
8 May 2025
8 May 2025 - 22 May 2025
Amount
Charges for Removal of LT modules from the racks, cleaning, tightness checking of all components and terminals, lubrication and racking, in the concerned racks.a) Charges for cleaning 1/3 & 1/8 size LT Modules.
b) Charges for cleaning ½, ¾ size & Full size LT Modules.
c) Charges for cleaning of 150 KW Modules.
Charges for Removal of LT breakers from its chamber, cleaning the breakers, tightness checking of all bolts and nuts, applying lubrication, checking the trip & close operations of the breakers and put back the breakers in the breaker chamber
Charges for Checking of the tightness of all bus bar joints, cleaning of the bus bars, cleaning of FRB Insulation sheets.
Charges for Removing the top covers and cleaning the main bus, Cleaning of Bus ducts and Main bus from Service Transformer to Incomer panel.
Material cost for CRC (500ml)
Cost of Consumables for cleaning LT switchgear at AHPH
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .