| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.3 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹89.8 L+₹18.9 L (26.7%)Rejected-AOC | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | R.S.S.ENTERPRISES L2 | J SABARI L1 |
|---|---|---|---|---|---|
| 1.00Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. ( 3 times in a day). | |||||
| 1.01 | Toilet floors(includes cleaning of wall tiles & doors / ventilators, removal of cobweb) | 81,560 | m2 | 7 ₹5,70,920 Lowest | 7.51 ₹6,12,515.6 |
| 1.02 | Water closets (IWC / EWC) | 15,850 | Nos | 19 ₹3,01,150 Lowest | 19.92 ₹3,15,732 |
| 1.03 | Urinals cleaning & providing scented urinal screen, coloured naphthalene balls | 9,940 | Nos | 13 ₹1,29,220 | 12.58 ₹1,25,045.2 Lowest |
| 1.04 | Wash basin | 19,720 | Nos | 12 ₹2,36,640 | 11.55 ₹2,27,766 Lowest |
| 1.05 | Cleaning of Open drain by using rack and coconut broom to ensure the free flow of storm / sullage water and disposing of the waste etc including cost of Labour, T&P ,consumables, clearing away the Debris etc., complete- Open drain | 1,75,820 | Rm | 2.5 ₹4,39,550 Lowest | 2.51 ₹4,41,308.2 |
| 1.06 | Cleaning of covered drain by using rack and coconut broom to ensure the free flow of storm / sullage water and disposing of the waste etc including cost of Labour, T&P, consumables, clearing away the Debris etc., complete-Slab covered drain | 14,664 | Rm | 9.5 ₹1,39,308 | 9.44 ₹1,38,428.16 Lowest |
| 1.07 | Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. | 4,72,500 | m2 | 1.6 ₹7,56,000 Lowest | 1.73 ₹8,17,425 |
| 1.08 | Sweeping and mopping of the office lobby such as cash collection centre (Flooring with ceramic/marble/granite tiles) steps, staircase, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards, Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete | 5,16,200 | m2 | 2 ₹10,32,400 | 1.21 ₹6,24,602 Lowest |
| 1.09 | Sweeping and mopping of the office floors (Flooring with cement mortar) steps, staircase, handrails with scented cleaning agents including clearing and disposal of waste papers daily.Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards etc., removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete.. | 18,87,920 | m2 | 2 ₹37,75,840 | 1.31 ₹24,73,175.2 Lowest |
Tender Value
Refer Docs
EMD Value
₹57,000
Closing Date
2 Mar 2026, 2:00 pmClosed
EE/Mtce/BBGTPS
Basin Bridge Gas Turbine power Station,Chennai-12
Housekeeping such as sweeping and cleaning etc in Basin Bridge Gas Turbine Power Station in Chennai district for a period of 2 years
2026_EB_655916_1
Spec No.04/2025-26
Open Tender
Civil Works
Works
730 days
Basin Bridge Gas Turbine Power Station
Please refer Tender documents
2 documents required · 2 mandatory
₹0
₹57,000
Yes
29 Aug 2026
12 Feb 2026
3 Mar 2026
12 Feb 2026
2 Mar 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell. ( 3 times in a day). | |||||
| 1.01 | Toilet floors(includes cleaning of wall tiles & doors / ventilators, removal of cobweb) | 81,560 | m2 | 34,594 | ₹2,82,14,86,640 |
| 1.02 | Water closets (IWC / EWC) | 15,850 | Nos | 34,594 | ₹54,83,14,900 |
| 1.03 | Urinals cleaning & providing scented urinal screen, coloured naphthalene balls | 9,940 | Nos | 34,594 | ₹34,38,64,360 |
| 1.04 | Wash basin | 19,720 | Nos | 34,594 | ₹68,21,93,680 |
| 1.05 | Cleaning of Open drain by using rack and coconut broom to ensure the free flow of storm / sullage water and disposing of the waste etc including cost of Labour, T&P ,consumables, clearing away the Debris etc., complete- Open drain | 1,75,820 | Rm | 34,594 | ₹6,08,23,17,080 |
| 1.06 | Cleaning of covered drain by using rack and coconut broom to ensure the free flow of storm / sullage water and disposing of the waste etc including cost of Labour, T&P, consumables, clearing away the Debris etc., complete-Slab covered drain | 14,664 | Rm | 34,594 | ₹50,72,86,416 |
| 1.07 | Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. | 4,72,500 | m2 | 34,594 | ₹16,34,56,65,000 |
| 1.08 | Sweeping and mopping of the office lobby such as cash collection centre (Flooring with ceramic/marble/granite tiles) steps, staircase, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards, Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete | 5,16,200 | m2 | 34,594 | ₹17,85,74,22,800 |
| 1.09 | Sweeping and mopping of the office floors (Flooring with cement mortar) steps, staircase, handrails with scented cleaning agents including clearing and disposal of waste papers daily.Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards etc., removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete.. | 18,87,920 | m2 | 34,594 | ₹65,31,07,04,480 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_786587.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .