| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹30.1 CrAccepted-AOC KOTHI NO 6 CIVIL LINES OPP TB TOWER DISTRICT MORADABAD UTTAR PRADESH | MORADABAD | UTTAR PRADESH | 244001 | L-1 | Accepted-AOC RESPONSIVE | |
| 2 | L-2₹30.3 Cr+₹22.1 L (0.74%)Rejected-Finance D 172 SAKET MEERUT DISTRICT MEERUT | MEERUT | MEERUT | UTTAR PRADESH | L-2 | Rejected-Finance HIGHER RATE | |
| 3 | L-3₹34.8 Cr+₹4.8 Cr (15.8%)Rejected-Finance 2 560 GOMTI NAGAR VIRAM KHAND LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | L-3 | Rejected-Finance HIGHER RATE | |
| 4 | L-4₹42.1 Cr+₹12.0 Cr (39.9%)Rejected-Finance | L-4 | Rejected-Finance HIGHER RATE | |
| 5 | L-5₹43.5 Cr+₹13.5 Cr (44.9%)Rejected-Finance | L-5 | Rejected-Finance HIGHER RATE |
Tender Value
₹45 Cr
EMD Value
₹50 L
Closing Date
2 Apr 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE MBD CIRCLE PWD MORADABAD
SE MBD CIRCLE PWD MORADABAD
Year 2024-25 Year 2024-25 Widening and strengthening of Pathakpur Faridpur Kaila Devi Shakarpur road (ODR)
2025_CEMBD_1016863_1
1397/E-Nivida-MBD Circle/24-25 DT 24-02-2025
Open Tender
Civil Works - Roads
Item Rate
450 days
sambhal
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹50 L
Yes
SE MBD CIRCLE PWD MORADABAD
10 Jun 2025
12 Mar 2025
2 Apr 2025
12 Mar 2025
2 Apr 2025
12 Mar 2025
17 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | Cum | - | - |
| 2 | Construction of Embankment with approved material obtained form road side with all lifts and leads, transporting to site, spreading, grading to required slope and compecting to meet requirement of table 300-2. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 0.29 | Cum | - | - |
| 3 | Construction of Embankment with approved material obtained form road side with all lifts and leads, transporting 3.00 km upto site, spreading, grading to required slope and compecting to meet requirement of table 300-2.and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | Cum | - | - |
| 4 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | Cum | - | - |
| 5 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | Cum | - | - |
| 6 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement M35 over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | Cum | - | - |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | Cum | - | - |
| 8 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 0.29 | sqm | - | - |
| 9 | Providing and laying dense graded bituminous macadam grade-1 with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | - | Cum | - | - |
| 10 | Providing & applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 0.29 | sqm | - | - |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1832855.xls
BOQ • 0.26 MB
165664504.pdf
Tender Documents • 1.67 MB
165664506.html
Tender Documents • 0.05 MB
166160967.pdf
Tender Documents • 0.39 MB
166664070.pdf
Tender Documents • 0.62 MB
166838351.pdf
Tender Documents • 0.17 MB
167129769.pdf
Tender Documents • 0.39 MB
SBD.pdf
Tender Documents • 10.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .