Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Finance UDHAMPUR | ₹7.7 L | L1 | Admitted-Finance |
| 2 | L2₹7.9 LAdmitted-Finance | ₹7.9 L | L2 | Admitted-Finance |
| 3 | L3₹7.9 LAdmitted-Finance | ₹7.9 L | L3 | Admitted-Finance |
| 4 | L4₹8.0 LAdmitted-Finance | ₹8.0 L | L4 | Admitted-Finance |
| 5 | L5₹8.2 LAdmitted-Finance | ₹8.2 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | THAPPA ELECTRICAL CONSTRUCTION AND SUPPLIERS L4 | JAI CHANDI MAA ENTERPRISES L3 | VEENA CONSTRUCTION CO. L2 | M/S VAISHNO TRADERS L1 | SWASTIK ELECTRICAL AND CONSTRUCTION WORKS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Creation of 25KVA Sub Station at W.No.09 village Jansal | ||||||||
| 1.01 | 11/0.433 KV, 3-phase distribution Transformer 25 KVA Aluminium wound Distribution Transformer at latest Energy Efficiency level-2(New) IS1180 part-1 2014 as per latest upto date amnedment with externally fitted MCCB with cable box and 4x4 mtrs cable of 95 sqmm. | 1 | No. | 16,000 ₹98,000 | 10,000 ₹1.1 L | 5,000 ₹1.1 L | 30,000 ₹1.2 L | 1,000 ₹1.6 L |
| 1.02 | Gapless surge Arrestor, 9 kv, 10 KA , LA with polymer housing stn. Type | 1 | set | 500 ₹3,500 | 500 ₹4,500 | 500 ₹5,000 | 1,000 ₹9,000 | 100 ₹9,600 |
| 1.03 | 11 KV GO AB Switch 3 phase, 3 pole, 200 Amp, vertical | 1 | set | 1,000 ₹9,500 | 500 ₹9,500 | 500 ₹8,000 | 1,000 ₹9,000 | 100 ₹9,600 |
| 1.04 | 11 KV Horn gap fuse set 3 phase 200 A | 1 | set | 500 ₹3,700 | 500 ₹4,000 | 500 ₹5,000 | 1,000 ₹7,000 | 100 ₹9,600 |
| 1.05 | 95 mm² 1.1 KV Grade, PVC insulated stranded conductor FRLS Type | 44 | Mtr | 220 ₹9,900 | 440 ₹11,880 | 880 ₹7,480 | 2,200 ₹11,000 | 440 ₹12,980 |
| 1.06 | 9 mtr. Long ST pole (ST-410 SP-33) | 2 | No. | 2,000 ₹34,000 | 2,000 ₹34,000 | 1,000 ₹33,000 | 4,000 ₹34,000 | 1,000 ₹35,000 |
| 1.07 | 11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75 Positive and 80 KV Negative, creepage distance 320mm with fitting | 3 | No. | 60 ₹960 | 60 ₹900 | 150 ₹1,050 | 15 ₹165 | 30 ₹870 |
| 1.08 | GI Channel /Angle/flat of sizes including clamps | 250 | Kg | 1,250 ₹30,750 | 2,500 ₹27,500 | 2,500 ₹35,000 | 2,500 ₹30,000 | 1,000 ₹24,000 |
| 1.09 | Galvanized Nuts and Bolts. | 15 | Kg | 75 ₹1,845 | 150 ₹1,800 | 150 ₹1,800 | 150 ₹1,650 | 60 ₹1,410 |
Tender Value
Refer Docs
EMD Value
₹24,700
Closing Date
29 Dec 2025, 3:00 pmClosed
Executive Engineer
Executive Engineer Electric Division JPDCL Udhampur
Installation of 25KVA transformer alongwith HT Lt
2025_PDD_298889_1
ED/UDH/41 OF 2025-26 dt. 22-12-2025
Open Tender
Electrical Works
30 days
in district Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer Electric Division JPDCL
₹24,700
3 Jan 2026
22 Dec 2025
30 Dec 2025
22 Dec 2025
29 Dec 2025
22 Dec 2025
22 Dec 2025 - 27 Dec 2025
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Creation of 25KVA Sub Station at W.No.09 village Jansal
11/0.433 KV, 3-phase distribution Transformer 25 KVA Aluminium wound Distribution Transformer at latest Energy Efficiency level-2(New) IS1180 part-1 2014 as per latest upto date amnedment with externally fitted MCCB with cable box and 4x4 mtrs cable of 95 sqmm.
Gapless surge Arrestor, 9 kv, 10 KA , LA with polymer housing stn. Type
11 KV GO AB Switch 3 phase, 3 pole, 200 Amp, vertical
11 KV Horn gap fuse set 3 phase 200 A
95 mm² 1.1 KV Grade, PVC insulated stranded conductor FRLS Type
9 mtr. Long ST pole (ST-410 SP-33)
11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75 Positive and 80 KV Negative, creepage distance 320mm with fitting
GI Channel /Angle/flat of sizes including clamps
Galvanized Nuts and Bolts.
Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole
Earthing of sub stn. Excavation of earth pit of dia 650mm & depth 3000mm installation of earthing pipe of 40mm Nominal bore & 4mm wall thickness & length 2.5 mtr. Long as per IS 1239. G.I Strip for neutral earthing of size 25mmx3mm for connection of transforemr body, GO Set & lightening arrestor as per IS 2629/85, GI Nuts & bolts refilled with earth enhancement materials and earth chamber with RCC Slab cover
Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
LT fuse switch made of angle iron 50*50*6mm with Al busbar strip 50*6mm fixed on busbar insulator including clamps for fixing of Switch.
Painting of 9 mtr ST poles with one coat of Red Oxide and two coats of Aluminium paint.
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Erection of 11 KV line on 9 mtr.Long ST poles with 30mmsq ACSR Weasel Conductor for Creation of 25KVA Sub Station at W.No.09 village Jansal
9 mtr. Long ST Pole (ST-410-SP-33)
GI V Cross -arm with top Bracket including clamps
GI Channel X-arm including clamps and Angle for braces
30mm² ACSR Weasel Conductor
11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm.
11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75KV Positive and 80 KV Negative, creepage distance 320mm with fitting
Galvanized Nuts and Bolts
Painting of 9 mtr ST poles with two coats of Aluminium paint.
Danger Plates with clamps
Anti Climbing Device with Clamps
Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole
Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm
Survey, supply, Transportation, Carriage, Erection, Testing and Commissioning for Erection of 1 Phase 2 Wire LT line on 8 mtr. PCC poles for Creation of 25KVA Sub Station at W.No.09 village Jansal
8 mtr. Long PCC poles (PCC WL 200 Kg)
GI U Clamps for shackle insulator
30mm² ACSR Weasel Conductor
Shackle insulator
Galvanized Nuts and Bolts.
Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm
VEENA CONSTRUCTION CO. (BID ID -2681901)
JAI CHANDI MAA ENTERPRISES (BID ID -2682178)
THAPPA ELECTRICAL CONSTRUCTION AND SUPPLIERS (BID ID -2682311)
SWASTIK ELECTRICAL AND CONSTRUCTION WORKS (BID ID -2682509)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tendernotice_2.pdf
PDF • 1.20 MB
Tendernotice_3.pdf
PDF • 1.34 MB
BOQ_969321.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid