| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.4 LAdmitted-Finance | ₹98.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.0 Cr+₹2.3 L (2.37%)Admitted-Finance | ₹1.0 Cr+₹2.3 L (2.37%) | L2 | Admitted-Finance |
| 3 | L3₹1.1 Cr+₹6.9 L (7.00%)Admitted-Finance | ₹1.1 Cr+₹6.9 L (7.00%) | L3 | Admitted-Finance |
| 4 | L4₹1.1 Cr+₹14.3 L (14.5%)Admitted-Finance | ₹1.1 Cr+₹14.3 L (14.5%) | L4 | Admitted-Finance |
| 5 | L5₹1.1 Cr+₹15.0 L (15.2%)Admitted-Finance HIG 11 GOURAV VIHAR HOUSING BORD COLONY MADHUBAN PARADIP JAGATSINGHAPUR ODISHA 754142 UDYAM OD 12 0001260 | JAGATSINGHAPUR | ODISHA | 754142 | ₹1.1 Cr+₹15.0 L (15.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AM CONSTRUCTION AND ENGINEERING L5 | M/S.RAMESH CHANDRA MOHANTY L2 | Manas Ranjan Pal L7 | Skater Infratech India Pvt. Ltd. L8 | M/s.Bula Bilash Construction L6 | M/S BHAIRAB CHARAN SWAIN L4 | Nilamani Swain L3 | LAXMIDHAR ROUT L9 | Anuja Mohapatra L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Filling of low laying area with dredge spoil to the required level including transportation within a lead of 5 Km. by private trucks with polythene covering at the top to prevent spillage/ blowing of same including loading at one end and unloading at other end, spreading in layers, leveling, watering, compacting by VRR in suitable layers with supply of all labour, materials, T&P, all taxes, royalties, Port entry fees, engagement, hire & running charges of all equipments, operation expenses, all POL, cost of water, testing charges, excluding GST etc. all complete as per direction of Engineer-in-charge.
N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity. | 240 | Each Cum | 200 ₹48,000 | 260 ₹62,400 | 300 ₹72,000 | 210.89 ₹50,613.6 | 240 ₹57,600 | 270 ₹64,800 | 180 ₹43,200 Lowest | 306 ₹73,440 | 180 ₹43,200 Lowest |
| 2.00 | Earth work in excavation in all kinds of soil which may include ordinary soil, sand, silt, slusy soil with all leads, lifts and de-lifts, loading, unloading, handling, re-handling with cost of all labour, transportation and subsequent removal at appropriate time including site illumination, mobilization, demobilization, engagement, hire & running charges of all machineries, fuel & lubricants with all taxes, T&P, Port entry fees, all safety arrangements etc. all complete excluding GST and as per direction of Engineer in charge. | 284 | Each Cum | 150 ₹42,600 | 150 ₹42,600 | 150 ₹42,600 | 98 ₹27,832 | 100 ₹28,400 | 100 ₹28,400 | 100 ₹28,400 | 207 ₹58,788 | 70 ₹19,880 Lowest |
| 3.00 | Supplying, mixing, transporting, laying in proper level & grade Cement Concrete 1:4:8 (1 Cement : 4 Coarse Sand : 8 hard granite metal of 40mm & below size Crusher Broken) for Plain Cement Concrete (PCC) including form works made of ply/ steel shutters, hoisting, laying over compacted surface, compacting by any approved means, finished smooth to the exposed surface to proper level & gradient, barricading the work site, curing etc. with supply of all materials, labour, T&P, all taxes, royalties, hire & running charges of all machineries, transportation charges, Port entry fees, cost of water, testing charges of materials, excluding GST etc. all complete as per direction of Engineer-in-charge. | 53 | Each Cum | 3,800 ₹2,01,400 | 3,200 ₹1,69,600 | 3,800 ₹2,01,400 | 3,000 ₹1,59,000 | 4,000 ₹2,12,000 | 3,800 ₹2,01,400 | 3,400 ₹1,80,200 | 6,300 ₹3,33,900 | 2,600 ₹1,37,800 Lowest |
| 4.00 | Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, etc. all complete but excluding GST as directed by Engineer-in-charge. | 212 | Each Cum | 5,200 ₹11,02,400 | 5,000 ₹10,60,000 Lowest | 5,200 ₹11,02,400 | 5,589 ₹11,84,868 | 5,900 ₹12,50,800 | 5,000 ₹10,60,000 Lowest | 5,000 ₹10,60,000 Lowest | 7,200 ₹15,26,400 | 5,000 ₹10,60,000 Lowest |
| 5.00 | Supply Tor/TMT steel of any approved Steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes, tollage, Port entry fees etc. all complete but excluding GST as per the direction of Engineer-in-charge.
(NB: No payment shall be made for extra weight than theoretical co-efficient laid down in IS-1786. No Wastages shall be paid). | 254.5 | Each Qntl | 7,500 ₹19,08,750 | 5,900 ₹15,01,550 | 6,800 ₹17,30,600 | 5,189 ₹13,20,600.5 | 6,600 ₹16,79,700 | 6,200 ₹15,77,900 | 6,300 ₹16,03,350 | 6,300 ₹16,03,350 | 5,100 ₹12,97,950 Lowest |
| 6.00Providing Rigid and smooth leak proof centering & shuttering with form works made of ply/steel, painting with coltar/lubricant over the ply/steel after each use for RCC works in slab, wall, raft etc. including dismantling them after due period with cost of all material, labour, T&P, taxes, tollage, gate entry fees, transportion, staging etc. all complete excluding GST and as per direction of Engineer in charge. | ||||||||||||
| 6.01 | Foundation and Plinth | 244 | Each Sqm | 100 ₹24,400 | 75 ₹18,300 Lowest | 200 ₹48,800 | 150 ₹36,600 | 120 ₹29,280 | 120 ₹29,280 | 100 ₹24,400 | 333 ₹81,252 | 120 ₹29,280 |
| 6.02 | Wall | 581 | Each Sqm | 350 ₹2,03,350 | 350 ₹2,03,350 | 400 ₹2,32,400 | 220 ₹1,27,820 | 200 ₹1,16,200 | 250 ₹1,45,250 | 300 ₹1,74,300 | 333 ₹1,93,473 | 180 ₹1,04,580 Lowest |
| 6.03 | Column & Beam | 204 | Each Sqm | 500 ₹1,02,000 | 400 ₹81,600 | 500 ₹1,02,000 | 150 ₹30,600 | 300 ₹61,200 | 300 ₹61,200 | 480 ₹97,920 | 333 ₹67,932 | 110 ₹22,440 Lowest |
| 6.04 | Lintel & Chajja | 4.5 | Each Sqm | 250 ₹1,125 | 120 ₹540 | 200 ₹900 | 2 ₹9 Lowest | 200 ₹900 | 300 ₹1,350 | 280 ₹1,260 | 333 ₹1,498.5 | 10 ₹45 |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
16 Apr 2026, 5:15 pmClosed
PRADOSH MOHANTY, EE, HWD-I, PPA
PRADOSH MOHANTY, EE, HWD-I, PPA
Construction of Compound Wall along with development of surroundings of 3 Nos. Pump Houses (Ghanagalia, Dry Dock and North Oil Jetty) inside Harbour area
2026_MoS_903664_1
CE/HWDI/ACCTS-02/25/94
Open Tender
Civil Works
Works
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹3,000
Yes
AS PER E-TCN AND TD
₹2.8 L
Yes
29 May 2026
25 Mar 2026
17 Apr 2026
25 Mar 2026
16 Apr 2026
25 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Filling of low laying area with dredge spoil to the required level including transportation within a lead of 5 Km. by private trucks with polythene covering at the top to prevent spillage/ blowing of same including loading at one end and unloading at other end, spreading in layers, leveling, watering, compacting by VRR in suitable layers with supply of all labour, materials, T&P, all taxes, royalties, Port entry fees, engagement, hire & running charges of all equipments, operation expenses, all POL, cost of water, testing charges, excluding GST etc. all complete as per direction of Engineer-in-charge. N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity. | |||||
| 2Earth work in excavation in all kinds of soil which may include ordinary soil, sand, silt, slusy soil with all leads, lifts and de-lifts, loading, unloading, handling, re-handling with cost of all labour, transportation and subsequent removal at appropriate time including site illumination, mobilization, demobilization, engagement, hire & running charges of all machineries, fuel & lubricants with all taxes, T&P, Port entry fees, all safety arrangements etc. all complete excluding GST and as per direction of Engineer in charge. | |||||
| 3Supplying, mixing, transporting, laying in proper level & grade Cement Concrete 1:4:8 (1 Cement : 4 Coarse Sand : 8 hard granite metal of 40mm & below size Crusher Broken) for Plain Cement Concrete (PCC) including form works made of ply/ steel shutters, hoisting, laying over compacted surface, compacting by any approved means, finished smooth to the exposed surface to proper level & gradient, barricading the work site, curing etc. with supply of all materials, labour, T&P, all taxes, royalties, hire & running charges of all machineries, transportation charges, Port entry fees, cost of water, testing charges of materials, excluding GST etc. all complete as per direction of Engineer-in-charge. | |||||
| 4Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, etc. all complete but excluding GST as directed by Engineer-in-charge. | |||||
| 5Supply Tor/TMT steel of any approved Steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes, tollage, Port entry fees etc. all complete but excluding GST as per the direction of Engineer-in-charge. (NB: No payment shall be made for extra weight than theoretical co-efficient laid down in IS-1786. No Wastages shall be paid). | |||||
| 6Providing Rigid and smooth leak proof centering & shuttering with form works made of ply/steel, painting with coltar/lubricant over the ply/steel after each use for RCC works in slab, wall, raft etc. including dismantling them after due period with cost of all material, labour, T&P, taxes, tollage, gate entry fees, transportion, staging etc. all complete excluding GST and as per direction of Engineer in charge. | |||||
| 6.01 | Foundation and Plinth | - | Each Sqm | - | - |
| 6.02 | Wall | - | Each Sqm | - | - |
| 6.03 | Column & Beam | - | Each Sqm | - | - |
| 6.04 | Lintel & Chajja | - | Each Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_949838.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .