Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-Finance | ₹4.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.3 L+₹1,551.26 (0.37%)Rejected-Finance 17 C LADHOWALI ROAD OPP G G S C SCHOOL JALANDHAR | ₹4.3 L+₹1,551.26 (0.37%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.3 L+₹7,844.94 (1.85%)Rejected-Finance ARRORIAN STREET DISTT PATIALA | ₹4.3 L+₹7,844.94 (1.85%) | L3 | Rejected-Finance L3 |
Tender Value
₹4.4 L
EMD Value
₹8,864
Closing Date
29 May 2026, 5:00 pmClosed
Registrar
Registrar IIT Ropar
Providing and Fixing PVC Coated Chain Link Fencing with MS Gate for nursery area, IIT Ropar
2026_IITRP_909875_1
IITRPR/ENM/T/26/102
Open Tender
Civil Works
Percentage
IIT Ropar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,864
22 Jul 2026
22 May 2026
1 Jun 2026
22 May 2026
29 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - |
| 1.02 | All kinds of soil. | 1 | cum | 260.3 | ₹260.04 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | - | - |
| 1.04 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | 6,518.6 | ₹6,512.08 |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | - | - | - | - |
| 1.06 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 1 | m3 | 9,045.75 | ₹9,036.7 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form | - | - | - | - |
| 1.08 | Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | m2 | 961.3 | ₹960.34 |
| 1.09 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: | - | - | - | - |
| 1.1 | Cement mortar 1:6 (1 cement : 6 coarse sand) | - | m3 | 7,132.25 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
chainlink.pdf
Tender Documents • 0.67 MB
BOQ_956316.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .