Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-SB |
Tender Value
₹98,000
EMD Value
₹4,900
Closing Date
21 Jan 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
CONSTRUCTION OF P BUND NEAR THE HOUSE OF BASHIR AH. DAR SON OF LATE GH RASOOL AT SHOLIPORA BLOCK BUDGAM.
2026_RDPR_300508_16
NIT_105_REW BUDGAM OF 2025-26
Open Tender
Civil Works
Percentage
30 days
BUDGAM
AS PER ENIT
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹4,900
Yes
22 Jan 2026
13 Jan 2026
22 Jan 2026
13 Jan 2026
21 Jan 2026
13 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Rural Engineering wing Budgam
Name of work:- Construction of P/Bund near house of Bashir Ahmad Dar S/O Late Gh Rassool at Sholipora Block Budgam Scheme: DDC
Contract No and date : As per eNIT (F:Y: 2025-26) Adv cost =Rs 0.98 Lacs
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
0_) Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth,1 m in width as well as 10 m 2 on plan) including disposal of excavated earth lead upto 1 meters and lift upto 1.5 m BI01010001010000000000000515BI0100001118 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing and laying charges for laying of stone solling duly hand packed in trenches including carriage BI01010001010000000000000515BI0100001119 Cum _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Ten Thousand &Three and Paise Forty Two Only
0_) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) BI01010001010000000000000515BI0100001120 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Fifty Six Thousand &Seventy Four and Paise Sixty One Only
0_) Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. BI01010001010000000000000515BI0100001121 Sqm _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Fifteen Thousand Three Hundred & Twenty Two and Paise Fifty Nine Only
0_) Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc: Stone Agg. for an average lead of 20 Km BI01010001010000000000000515BI0100001122 8.8 Cum _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Three Thousand Six Hundred & Seven and Paise Forty Seven Only
0_) Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc:Sand Agg. for an average lead of 10 Km BI01010001010000000000000515BI0100001123 4.4 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR One Thousand Two Hundred & Twenty Seven and Paise Seventy Eight Only
0_) Head load for all materials for 100 m BI01010001010000000000000515BI0100001124 22.26 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Four Thousand Four Hundred & Fifty Two Only
0_) Add cost of sign board photography,clearence of site cutting of road pavement and other unforeseen items BI01010001010000000000000515BI0100001125 job _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Two Thousand Nine Hundred & Sixteen and Paise Ninety Five Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures INR Ninety Eight Thousand Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_974891.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .