Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
22 May 2026, 10:00 amClosed
EO Shivrajpur
Office Nagar Panchayat Shivrajpur
Ward No-02 In Talab
2026_DOLBU_1140112_2
61/NPS/Tender/2026-27
Open Tender
Civil Works
Percentage
365 days
Sivrajpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
EO
₹4.7 L
22 May 2026
22 Apr 2026
22 May 2026
22 Apr 2026
22 May 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in surface excavation not exceeding 30 Cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5m, as directed by Engineer in Charge | 1 | Sqm | - | - |
| 2 | Plain cement concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size | 1 | Cum | - | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement. All work up to plinth level Fotting 1:1:5:3 | 1 | Cum | - | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement. All work up to plinth Beam 1:1:5:3 | - | Cum | - | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement. All work up to plinth level Column1:1:5:3 | 1 | Cum | - | - |
| 6 | Steel reinfocement for R.C.C. work including straightening, cutting, bending, placing, in position and binding all complete upto plinth level. | - | Qtl | - | - |
| 7 | Centering and shuttering including strutting propping etc and removal form work footing | - | Sqm | - | - |
| 8 | Centering and shuttering including strutting propping etc and removal form work Beam | - | Sqm | - | - |
| 9 | Centering and shuttering including strutting propping etc and removal form work Column | 1 | Sqm | - | - |
| 10 | Brick Work with common burnt clay brick of class 150 in plinth foundation in all shapes and size cement mortar 1:4 | - | Cum | - | - |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_2128960.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .