Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.6 L+₹486.86 (0.14%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.6 L+₹515.95 (0.14%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S SHYAMSUNDAR PAL L2 | M/S ANUPAM SAHOO L3 | DAS ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00 | Fine Sand | 27 | cum | 380.5 ₹10,273.5 | 380.55 ₹10,274.85 | 380 ₹10,260 Lowest |
| 2.00 | Polythene sheet (150 gm per sqm) | 54 | kg | 109.5 ₹5,913 | 109.58 ₹5,917.32 | 109 ₹5,886 Lowest |
| 3.00 | Stone Aggregate(single size): 10 mm nominal size | 17.64 | cum | 1,632.5 ₹28,797.3 | 1,632.58 ₹28,798.71 | 1,632 ₹28,788.48 Lowest |
| 4.00 | Stone Aggregate(single size):20 mm nominal size | 35.91 | cum | 1,799.5 ₹64,620.05 | 1,799.58 ₹64,622.92 | 1,799 ₹64,602.09 Lowest |
| 5.00 | Portland Cement | 25.7 | tonne | 5,716.5 ₹1,46,936.92 | 5,716.58 ₹1,46,938.97 | 5,716 ₹1,46,924.06 Lowest |
| 6.00 | Carriage of Stone aggregate below 40 mm nominal size | 53.55 | cum | 544.5 ₹29,157.98 | 544.58 ₹29,162.26 | 544 ₹29,131.2 Lowest |
| 7.00 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 53.55 | cum | 76.5 ₹4,096.58 | 76.58 ₹4,100.86 | 76 ₹4,069.8 Lowest |
| 8.00 | Coarse Sand | 26.77 | cum | 712.5 ₹19,077.19 | 712.58 ₹19,079.33 | 712 ₹19,063.8 Lowest |
| 9.00 | Thermocol 12.5 mm thick. | 23.1 | sqm | 72.5 ₹1,674.75 | 72.58 ₹1,676.6 | 72 ₹1,663.2 Lowest |
| 10.00 | Hire charges of Shuttering plank (25mm-30mm thick) without Prop including all fittings | 52.5 | sqm | 178.5 ₹9,371.25 | 178.58 ₹9,375.45 | 178 ₹9,345 Lowest |
Tender Value
₹3.6 L
EMD Value
₹7,232
Closing Date
8 Sept 2026, 4:00 pmClosed
MOHANPUR GP
MOHANPUR GP
CEMENT CONCRETE ROAD for community FROM KAMALAKANTA NANDI HOUSE TO KARTIK NANDI PAN BARAJ AT KUSUMDA
2026_ZPHD_5020928_1
NIT E 4
Open Tender
CIVIL WORKS
Percentage
15 days
KUSUMDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹7,232
Yes
22 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fine Sand | - | cum | - | - |
| 2 | Polythene sheet (150 gm per sqm) | - | kg | - | - |
| 3 | Stone Aggregate(single size): 10 mm nominal size | - | cum | - | - |
| 4 | Stone Aggregate(single size):20 mm nominal size | 1 | cum | - | - |
| 5 | Portland Cement | - | tonne | - | - |
| 6 | Carriage of Stone aggregate below 40 mm nominal size | 1 | cum | - | - |
| 7 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 1 | cum | - | - |
| 8 | Coarse Sand | 1 | cum | - | - |
| 9 | Thermocol 12.5 mm thick. | - | sqm | - | - |
| 10 | Hire charges of Shuttering plank (25mm-30mm thick) without Prop including all fittings | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_5098051.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .