Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BHAGWATI NAGAR JAMMU | Admitted-Finance |
| 2 | Admitted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1,360
Closing Date
12 Apr 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
XEN Jal Shakti PHE Mechanical Division Udhampu
MH MORH
Repair to 50000 GPH x 112 meter head HC pumping unit no. 6 installed at pumping station Salmay stage-1st (Old).
2022_PHE_165907_1
ENIT NO. 04 OF 2022-23
Open Tender
Repair and Maintenance Works
Item Rate
12 days
XEN Jal Shakti PHE Mechanical division Udhampu
Repair to 50000 GPH x 112 meter head HC pumping unit no. 6 installed at pumping station Salmay stage-1st (Old).
7 documents required · 7 mandatory
₹200
xen Jal Shakti PHE Mechanical Division Udhampur
₹1,360
27 Apr 2022
1 Apr 2022
13 Apr 2022
1 Apr 2022
12 Apr 2022
1 Apr 2022
90 days
Amount
Repair to 50000 GPH x 112 meter head HC pumping unit no. 6 installed at pumping station Salmay stage-1st (old) by way of disconnecting incoming mains, decoupling pump-motor, unfastening unit from base frame suction and delivery, plugging delivery with blind flange and shifting to workshop. Dismantling and extraction of pump shaft and assembly. Repair to pump shaft by way of welding, turning and finishing to exact bearing size, providing, fabricating and fitting of shaft seleeves-2nos, shaft bushes-2nos., providing and fitting of impeller-1no. alongwith providing and fitting of new bearing 6311-2nos., check nuts-2nos. Assembly the pump set and shifting it to station. Simultaneously replacement of wornout bearings of 3 phase 200 HP motor of unit no. 1 at site, by way of opening side covers, extraction of wornout bearings from the motor shaft with the help of gas cutting appliances and puller. Thereafter providing and fitting of new bearings 6319 and 6413-1 no. each, closing end covers. Subsequently shifting the pumping unit on base frame, leveling, alignment and coupling pump motor set and then testing on no load and full load at site. Complete job includes cost of material, hire charge of tools and tackles and labour charges etc. Rebate, if any, should be quoted separately.
BEE AAR ENTERPRISES
G S ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .