Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 LAdmitted-Finance | ₹24.2 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NEWBHARATH ELECTRICALS AND ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Removing the black topping of 30cm thickness and forming cable open trench and cable duct at road crossing 60 cm wide and 135 cm deep (clear) including cost of using machinary providing danger lights, indication arrangements wherever necessary labour, lead, lift, tools and plants etc., complete. The removed Tar blacks, RCC/PCC and other debris shall be removed from site before the start of excavaion of trench. | 15 | M | 2,250 ₹2,250 Lowest |
| 2.00 | Earth work excavation in all soils to a depth from 31cm to 135cm including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct including cost of signal boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary all labour, lead, lift, tools and plants etc., complete.The excavated earth should be placed in one side of trench preferably on foot path side , not to obstruct free flow of traffic. | 10 | M3 | 4,900 ₹4,900 Lowest |
| 3.00Dismantling the brickwork, PCC , RCC inside the cable trench and cable duct wherever occur of any thickness and clearing the trench/duct free from debris and without cable laying work including lead, lift, labour, hinderence to the tools & plants etc., complete as per direction of Engineer-in-charge. | ||||
| 3.01 | Dismantling BW in CM - 1cum | 2 | M3 | 1,000 ₹1,000 Lowest |
| 3.02 | Dismantling PCC - 1cum | 2 | M3 | 4,000 ₹4,000 Lowest |
| 3.03 | Dismantling RCC - 1cum | 5 | M3 | 20,000 ₹20,000 Lowest |
| 4.00 | Drilling, Reaming & Laying of 33 KV Cable (3Nos). Using Trenchless Technology Method at a depth of about 1.50meters or more by using directional drilling unit equipped with automated pipe handling system (Horizontal Directional Drilling Machine), Using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other service like telephone, Internet cables, Water pipes, etc., installation including cost of pipe, hire charges for all the accessories and equipment etc. Taking the necessary drive pit for drilling & laying the cable, remove the excavated earth. The rate quoted for including the charge of GPR (Ground Penetrating radar ) Survey for identify the existing utility in the proposed bore path and including cost of making entry pit and exit pit for every 250 meters minimum intervals (Along the Road) | 485 | CKTM | 17,94,500 ₹17,94,500 Lowest |
| 5.00 | Providing barricading works for laying cables using steel barricades with green barricade construction safety nets continously without gap inclusive material cost, labour and removal charges after completing the work etc charges complete and warning tape as directed by the engineer at site. | 15 | M | 2,250 ₹2,250 Lowest |
| 6.00 | Supplying and laying of 140 mm dia HDPE pipes,cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of PVC specials, labour, lead, lift, T&P etc., complete | 39 | M | 34,320 ₹34,320 Lowest |
| 7.00 | Laying plain cement concrete 1:3:6, using 20mm BG metal for bottom portion of trench for fixing PVC pipe in the cable duct in proper alignment and level as per materials, labour, lead, lift etc., complete. | 5 | M3 | 27,500 ₹27,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
5 Aug 2026, 3:00 pmClosed
SE CDC TNPDCL
A10 Thiru Vi Ka Industrial Estate Guindy
workcontractfor33kvxlpeugcablelayingfrom3rdsourcefeedertocmbttss
2026_EB_687426_1
OTNo03/2026-27
Open Tender
Civil Works
Works
90 days
A10 Thiru Vi Ka Industrial Estate Guindy
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹14,000
Yes
21 Aug 2026
22 Jul 2026
6 Aug 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing the black topping of 30cm thickness and forming cable open trench and cable duct at road crossing 60 cm wide and 135 cm deep (clear) including cost of using machinary providing danger lights, indication arrangements wherever necessary labour, lead, lift, tools and plants etc., complete. The removed Tar blacks, RCC/PCC and other debris shall be removed from site before the start of excavaion of trench. | 15 | M | - | - |
| 2 | Earth work excavation in all soils to a depth from 31cm to 135cm including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct including cost of signal boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary all labour, lead, lift, tools and plants etc., complete.The excavated earth should be placed in one side of trench preferably on foot path side , not to obstruct free flow of traffic. | 10 | M3 | - | - |
| 3Dismantling the brickwork, PCC , RCC inside the cable trench and cable duct wherever occur of any thickness and clearing the trench/duct free from debris and without cable laying work including lead, lift, labour, hinderence to the tools & plants etc., complete as per direction of Engineer-in-charge. | |||||
| 3.01 | Dismantling BW in CM - 1cum | 2 | M3 | - | - |
| 3.02 | Dismantling PCC - 1cum | 2 | M3 | - | - |
| 3.03 | Dismantling RCC - 1cum | 5 | M3 | - | - |
| 4 | Drilling, Reaming & Laying of 33 KV Cable (3Nos). Using Trenchless Technology Method at a depth of about 1.50meters or more by using directional drilling unit equipped with automated pipe handling system (Horizontal Directional Drilling Machine), Using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other service like telephone, Internet cables, Water pipes, etc., installation including cost of pipe, hire charges for all the accessories and equipment etc. Taking the necessary drive pit for drilling & laying the cable, remove the excavated earth. The rate quoted for including the charge of GPR (Ground Penetrating radar ) Survey for identify the existing utility in the proposed bore path and including cost of making entry pit and exit pit for every 250 meters minimum intervals (Along the Road) | 485 | CKTM | - | - |
| 5 | Providing barricading works for laying cables using steel barricades with green barricade construction safety nets continously without gap inclusive material cost, labour and removal charges after completing the work etc charges complete and warning tape as directed by the engineer at site. | 15 | M | - | - |
| 6 | Supplying and laying of 140 mm dia HDPE pipes,cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of PVC specials, labour, lead, lift, T&P etc., complete | 39 | M | - | - |
| 7 | Laying plain cement concrete 1:3:6, using 20mm BG metal for bottom portion of trench for fixing PVC pipe in the cable duct in proper alignment and level as per materials, labour, lead, lift etc., complete. | 5 | M3 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
Tendernotice_2.pdf
PDF • 0.73 MB
BOQ_826251.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].