| Sl No | Description | Qty | Unit | M.Rajagopal L2 | M/S. SRI RUKMANI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.001.CONSTRUCTION OF CREMATION SHED CC ROAD & COMPOUND WALL AT NEW SLR CAMP IN PETHIKUPPAM PANCHAYAT | |||||
| 2.00CONSTRUCTION OF CREMATION SHED | |||||
| 3.00 | Provision for light Jungle clearance incl all labour charges etc | 960 | SQM | 6.4 ₹6,144 | 6 ₹5,760 Lowest |
| 4.00 | Earth work excavation for foundation in all soils and sub - soils etc., complete as per SS 20B | 10.25 | CUM | 263 ₹2,695.75 | 245 ₹2,511.25 Lowest |
| 5.00 | Supplying and filling in foundation and basement with Filling Sand in layers not more than15 cm thick etc. complete. | 6.7 | CUM | 1,700 ₹11,390 Lowest | 1,850 ₹12,395 |
| 6.00 | Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. complete. | 10.91 | CUM | 5,450 ₹59,459.5 Lowest | 5,874 ₹64,085.34 |
| 7.00Reinforced Cement concrete 1:1.5:3 mix using 20mm HBG metal for foundation and basement etc. complete. | |||||
| 8.00 | Upto base | 3.47 | CUM | 9,357 ₹32,468.79 | 7,452 ₹25,858.44 Lowest |
| 9.00 | above base | 4.14 | CUM | 9,450 ₹39,123 | 7,524 ₹31,149.36 Lowest |
| 10.00Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete. | |||||
Tender Value
₹22.6 L
EMD Value
₹23,000
Closing Date
13 Oct 2025, 3:00 pmClosed
Project Director/Joint Director
DRDA Tiruvallur
1.Construction of cremation shed and CC road and compound wall at new SLR camp in pethikuppam Panchayat 2. Construction of 1.5m SPAN Culvert at New SLR Camp Main street Pethikuppam Panchayat Gummidipoondi Block Pac.09
2025_RDTN_609748_1
RC No.3316/2025/A6
Open Tender
Civil Works
Item Rate
120 days
Gummidipoondi Block
Refer tender document
5 documents required · 5 mandatory
₹0
₹23,000
Yes
DRDA Tiruvallur
14 Nov 2025
29 Sept 2025
13 Oct 2025
29 Sept 2025
13 Oct 2025
3 Oct 2025
3 Oct 2025
Amount
1.CONSTRUCTION OF CREMATION SHED CC ROAD & COMPOUND WALL AT NEW SLR CAMP IN PETHIKUPPAM PANCHAYAT
CONSTRUCTION OF CREMATION SHED
Provision for light Jungle clearance incl all labour charges etc
Earth work excavation for foundation in all soils and sub - soils etc., complete as per SS 20B
Supplying and filling in foundation and basement with Filling Sand in layers not more than15 cm thick etc. complete.
Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm HBG metal for foundation and basement etc. complete.
Upto base
above base
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete.
Upto base
above base
Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position.etc.complete
Brick work in cement Mortar 1:5 for super structure using country bricks etc., complete.
Plastering with Cement Mortar 1:5 (one cement and five sand) 12mm thick in all floor including curing etc. complete.
Finishing the exposed surface of RCC items in CM 1:3,10mm thick for slabs, beams etc., complete.
Color washing Two coat with Best quality cement paint including cost of all materials brushes and scaffolding charges etc. complete.as per std specifications
Cement concrete 1:2:4 mix using 20mm HBG metal for ground floor etc. complete.
CONSTRUCTION OF COMPOUND WALL
Earth work Excavation in all classes of soils except hard rock in Hard Ordinary soil with initial lead and lift including all other charges and labour charges etc,.
C.C 1:4:8 Mix Using 40mm ISS HBG Metal including cost and conveyance and all materials and all labour charges etc,.Completed.
Supply and Fabrication of steel including cost and conveyance of all
Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed(COLUMN AROUND GL)
Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed(ABOVE COLUMN)
RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed..
Brick work in CM 1:5 mix using country Bricks including cost and conveyance of all materials to site mixing, placing,curing and all labour charges etc,..
Plastering in CM 1:5 Mix using 12mm thick including cost and conveyance and all lab our charges and materials charges completed..
Painting two coats with Exterior/interior first quality Emulsion of approved colour over one coat of primer including cost and conveyance and all lab our charges and materials charges completed..
PROVIDING OF CC ROAD
Earth work excavation and depositing on bank with in initial lead including cost of conveyance etc,..completed
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Towards centering chargers for all labour charges etc
Cement Concrete 1:3:6 using 20 mm guage machine broken hard broken granite stone jelly fincluding cost conveyance and all labour charges etc. complete.
Towards centering chargers for all labour charges etc
Cement Concrete 1:2:4 (One cement, Two sand, Four Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly fincluding cost conveyance and all labour charges etc. complete.
Supplying and fixing of Bitumen pad for expansion joints
CONSTRUCTION OF 1.5 M SPAN CULVERT AT NEW SLR CAMP MAIN STREET IN PETHIKUPPAM PANCHAYAT
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete.
i ) Below Sill
ii) Above Sill
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works.
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M.Rajagopal (BID ID -1485260)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .