Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 CrAccepted-Finance | ₹7.4 Cr | L1 | Accepted-Finance Accept |
| 2 | L2₹8.2 Cr+₹80.3 L (10.9%)Rejected-Finance | ₹8.2 Cr+₹80.3 L (10.9%) | L2 | Rejected-Finance Reject |
| 3 | L3₹8.5 Cr+₹1.1 Cr (15.2%)Rejected-Finance 108 SIDHESHWAR NAGAR COLONY SADAR GHAZIPUR U P 233001 | GHAZIPUR | UTTAR PRADESH | 233001 | ₹8.5 Cr+₹1.1 Cr (15.2%) | L3 | Rejected-Finance Reject |
| 4 | L4₹8.7 Cr+₹1.3 Cr (18.1%)Rejected-Finance HIG 20 NAVJEEVAN VIHAR VINDHYANAGAR SINGRAULI MADHYA PRADESH 486885 | SINGRAULI | MADHYA PRADESH | 486885 | ₹8.7 Cr+₹1.3 Cr (18.1%) | L4 | Rejected-Finance Reject |
| 5 | L5₹8.7 Cr+₹1.3 Cr (18.2%)Rejected-Finance | ₹8.7 Cr+₹1.3 Cr (18.2%) | L5 | Rejected-Finance Reject |
Tender Value
₹10.7 Cr
EMD Value
₹21.4 L
Closing Date
31 Jan 2020, 12:00 pmClosed
SE PMGSY CIRCLE PWD VARANASI
SE PMGSY CIRCLE PWD VARANASI
Construction and Maintenance of Roads for Upgradation under RCPLWEA (F.Y. 2019-20 Batch-1) in District- Sonebhadra under Package No UP 67147
2020_UPRRD_87344_7
1926/12Com(Tndr19-20)PMGSYC/19 Dt.21.12.19
Open Tender
Civil Works - Roads
Percentage
240 days
Sonbhadra
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,500
CEO UPRRDA
₹21.4 L
SE PMGSY CIRCLE PWD VARANASI
6 May 2020
11 Jan 2020
31 Jan 2020
11 Jan 2020
31 Jan 2020
11 Jan 2020
27 Jan 2020
eProcurement System for Pradhan Mantri Gram Sadak Yojana (PMGSY) Created By: Veerendra Kumar Jain Created Date/Time: 30-Apr-2020 03:10 PM Tender Title: Construction and Maintenance of Roads for Upgradation under RCPLWEA (F.Y. 2019-20 Batch-1) in District- Sonebhadra under Package No UP 67147 Tender ID: 2020_UPRRD_87344_7
Tender Inviting Authority: Superintending Engineer, PMGSY Circle, PWD, Varanasi (U.P.)
Name of Work: Construction & Maintenance of Road under RCPLWEA (Batch-I, F.Y. 2019-20) in Block- Myorepur, District- Sonebhadra Package No: UP67147 Road: R.S. Road to Kodara Tola
NIT No: - 1926/12Com (Nivida 2019-20)-PMGSY Circle/19 Date : 21.12.2019
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 ANUKTA CONSTRUCTION 96847450.50 -12.30 84935214.09 Eight Crore Fourty Nine Lakh Thirty Five Thousand Two Hundred and Fourteen
2.00 M/s Bihari Prasad 96847450.50 -15.57 81768302.46 Eight Crore Seventeen Lakh Sixty Eight Thousand Three Hundred and Two
3.00 NATIONAL PRESTIGE CONSTRUCTION CO. 96847450.50 -10.10 87065858.00 Eight Crore Seventy Lakh Sixty Five Thousand Eight Hundred and Fifty Eight
4.00 M/s. HAZARAT ALI 96847450.50 -23.86 73739648.81 Seven Crore Thirty Seven Lakh Thirty Nine Thousand Six Hundred and Fourty Eight
5.00 Rai And Company 96847450.50 -10.00 87162705.45 Eight Crore Seventy One Lakh Sixty Two Thousand Seven Hundred and Five
Lowest Amount Quoted BY: M/s. HAZARAT ALI(73739648.81)
BOQ Summary Details Tender Title: Construction and Maintenance of Roads for Upgradation under RCPLWEA (F.Y. 2019-20 Batch-1) in District- Sonebhadra under Package No UP 67147 Tender ID: 2020_UPRRD_87344_7
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 M/s. HAZARAT ALI 73739648.81 L1
2 M/s Bihari Prasad 81768302.46 L2
3 ANUKTA CONSTRUCTION 84935214.09 L3
4 NATIONAL PRESTIGE CONSTRUCTION CO. 87065858.00 L4
5 Rai And Company 87162705.45 L5
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .