Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Fee/PreQual/Technical/Finance | -46.45% | ₹5.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.2 L+₹41,815.89 (7.19%)Admitted-Fee/PreQual/Technical/Finance | -42.60% | ₹6.2 L+₹41,815.89 (7.19%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.5 L+₹70,055.19 (12.0%)Admitted-Fee/PreQual/Technical/Finance | -40.00% | ₹6.5 L+₹70,055.19 (12.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹6.5 L+₹70,055.19 (12.0%)Admitted-Fee/PreQual/Technical/Finance | -40.00% | ₹6.5 L+₹70,055.19 (12.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L3₹6.5 L+₹70,055.19 (12.0%)Admitted-Fee/PreQual/Technical/Finance | -40.00% | ₹6.5 L+₹70,055.19 (12.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.9 L
EMD Value
₹32,580
Closing Date
27 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O PLAYFIELD NEAR WATER TANKY PEERPORA NOWGAM B BLOCK VERINAG
2026_RDPR_321830_1
ENIT98of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹32,580
5 Sept 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
27 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by mechanical means( hydraulic excavator ) over areas exceeding 30 cm in depth 1.5 mtr in width as wakk as 10 sqm on plan incld disposal of excavated earth lead upto 50 mts & lift 1.5 mts as directed by engineer incharge in all kinds of Soil . | 1 | Cum | - | - |
| 0.0 | Earth work in bulk excavation by mechanical means( hydraulic excavator ) over areas exceeding 30 cm in depth 1.5 mtr in width as wakk as 10 sqm on plan incld disposal of excavated earth lead upto 50 mts & lift 1.5 mts as directed by engineer incharge in hard rock | 1 | Cum | - | - |
| 0.0 | Filling available excavted ( excld rock) in trenches ,plinth,sides of foundations etc in layers not exceeding 20 cm in depth incld consolidating each deposited layer by ramming & Watering lead upto 50 mtr & lift 1.5 mtr | - | Cum | - | - |
| 0.0 | Providing and laying of stone soling including ramming with all carriages upto worksite complete job.(Plums) | - | Cum | - | - |
| 0.0 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 0.0 | FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for: | - | - | - | - |
| 0.9 | Foundations, footings, bases of columns etc. for mass concrete | - | Sqm | - | - |
| 0.0 | Steel reinforcement for Concrete Work | - | Kgs | - | - |
| 0.0 | carriage of materials by MT | - | - | - | - |
| 0.9 | sand and aggregate avg lead of 30 kms by mt (sta) | 1 | cum | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1076118.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .