Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Finance | ₹6.8 L | L1 | Admitted-Finance |
| 2 | L2₹7.0 LAdmitted-Finance | ₹7.0 L | L2 | Admitted-Finance |
| 3 | L3₹7.1 LAdmitted-Finance GSTIN: 33GSKPD7895A1ZL | ₹7.1 L | L3 | Admitted-Finance |
| 4 | L4₹7.3 LAdmitted-Finance GSTIN: 33AHIPP3541J1ZA | ₹7.3 L | L4 | Admitted-Finance |
| 5 | L5₹7.4 LAdmitted-Finance GSTIN: 33ANSPS5144A1Z0 | ₹7.4 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PREMKUMAR L4 | R.S.S.ENTERPRISES L5 | GREEN AND BLUE FACILITY MANAGEMENT SERVICES L3 | APS ENTERPRISES L2 | THIRUMURUGAN ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of damaged steel collapsalbe Doors with rooling shutter and accumulation of the debris in the appropriate location and transportation of debris to the designated area. The rate includes the cost of all labour, lead, lift ,transportation, loading and unloading charges, etc., complete. | 12 | m2 | 250 ₹3,000 | 165 ₹1,980 | 152 ₹1,824 | 151 ₹1,812 | 130 ₹1,560 |
| 2.00 | Chipping of ceramic tiles and accumulation of the debris in the appropriate location and transportation of debris to the designated area. The rate includes the cost of all labour, lead, lift ,transportation, loading and unloading charges, etc., complete. | 12 | m2 | 150 ₹1,800 | 70 ₹840 | 67 ₹804 | 61 ₹732 | 55 ₹660 |
| 3.00 | Dismantling of Brick works and accumulation of the debris in the appropriate location and transportation of debris to the designated area. The rate includes the cost of all labour, lead, lift ,transportation, loading and unloading charges, etc., complete. | 2 | m3 | 1,500 ₹3,000 | 330 ₹660 | 308 ₹616 | 280 ₹560 | 300 ₹600 |
| 4.00 | Dismantling of PCC works and accumulation of the debris in the appropriate location and transportation of debris to the designated area. The rate includes the cost of all labour, lead, lift ,transportation, loading and unloading charges, etc., complete. | 3 | m3 | 2,500 ₹7,500 | 570 ₹1,710 | 527 ₹1,581 | 490 ₹1,470 | 450 ₹1,350 |
| 5.00 | Dismantling of washbasin with water connections and including all fixtures and assessories and stacking the debris for disposing away from site. The rate includes cost of all labour, lead, lift etc., complete | 1 | No | 150 ₹150 | 400 ₹400 | 371 ₹371 | 2,200 ₹2,200 | 350 ₹350 |
| 6.00 | Dismantling of RCC works and accumulation of the debris in the appropriate location and transportation of debris to the designated area. The rate includes the cost of all labour, lead, lift ,transportation, loading and unloading charges, etc., complete. | 2 | m3 | 5,500 ₹11,000 | 5,000 ₹10,000 | 4,667 ₹9,334 | 4,300 ₹8,600 | 3,700 ₹7,400 |
| 7.00 | Removing the existing damaged window and ventilator shutters the existing steel windows including the cost of all T&P, lead, lift, labour, transport,etc., complete. | 1 | No | 1,500 ₹1,500 | 640 ₹640 | 166 ₹166 | 2,200 ₹2,200 | 181 ₹181 |
| 8.00 | Filling and compacting layer by layer with brick jelly cement concrete with CM 1:4, to the required depth and gradient / level using 20mm brick jelly. The rate includes the cost of all materials, labour, lead, lift, transporting, compaction etc., complete and as per the direction of the Engineer incharge. | 25 | m3 | 3,500 ₹87,500 | 6,290 ₹1.6 L | 5,703 ₹1.4 L | 5,240 ₹1.3 L | 5,500 ₹1.4 L |
| 9.00 | Providing PCC 1:3:6, using 20mm HBS, the rate includes the cost of all materials, labour, lead, lift, transporting with curing , T&P etc., complete and as per the direction of the Engineer incharge. | 5.5 | m3 | 5,500 ₹30,250 | 6,930 ₹38,115 | 6,225 ₹34,237.50 | 5,566 ₹30,613 | 6,000 ₹33,000 |
| 10.00 | Providing Brickwork in CM 1:5, using Class-II Table moulded . The rate includes the cost of all materials, labour, lead, lift, transportation , etc., complete and as per the direction of the Engineer incharge. | 5 | m3 | 8,500 ₹42,500 | 7,900 ₹39,500 | 7,490 ₹37,450 | 7,180 ₹35,900 | 8,000 ₹40,000 |
Tender Value
Refer Docs
EMD Value
₹7,600
Closing Date
20 Feb 2026, 12:00 pmClosed
The Superintending Engineer / Civil/ Distribution
OFFICE OF THE SUPERINTENDING ENGINEER/ CIVIL/DISTRIBUTION 4TH FLOOR/WESTERN WING, NPKRR MAALIGAI, 144, ANNA SALAI, CHENNAI-600 002, TAMIL NADU
TNPDCL To carrying out renovation works rear side of 5B block ground floor for Environment Management Cell II lab at TNEB HQ Complex premises Chennai 02
2026_EB_657017_1
SPECIFICATION No. SE/C/Dist./25/ 2025-26
Open Tender
Civil Works
90 days
Chennai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,600
Yes
2 Mar 2026
13 Feb 2026
21 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
Dismantling of damaged steel collapsalbe Doors with rooling shutter and accumulation of the debris in the appropriate location and transportation of debris to the designated area. The rate includes the cost of all labour, lead, lift ,transportation, loading and unloading charges, etc., complete.
Chipping of ceramic tiles and accumulation of the debris in the appropriate location and transportation of debris to the designated area. The rate includes the cost of all labour, lead, lift ,transportation, loading and unloading charges, etc., complete.
Dismantling of Brick works and accumulation of the debris in the appropriate location and transportation of debris to the designated area. The rate includes the cost of all labour, lead, lift ,transportation, loading and unloading charges, etc., complete.
Dismantling of PCC works and accumulation of the debris in the appropriate location and transportation of debris to the designated area. The rate includes the cost of all labour, lead, lift ,transportation, loading and unloading charges, etc., complete.
Dismantling of washbasin with water connections and including all fixtures and assessories and stacking the debris for disposing away from site. The rate includes cost of all labour, lead, lift etc., complete
Dismantling of RCC works and accumulation of the debris in the appropriate location and transportation of debris to the designated area. The rate includes the cost of all labour, lead, lift ,transportation, loading and unloading charges, etc., complete.
Removing the existing damaged window and ventilator shutters the existing steel windows including the cost of all T&P, lead, lift, labour, transport,etc., complete.
Filling and compacting layer by layer with brick jelly cement concrete with CM 1:4, to the required depth and gradient / level using 20mm brick jelly. The rate includes the cost of all materials, labour, lead, lift, transporting, compaction etc., complete and as per the direction of the Engineer incharge.
Providing PCC 1:3:6, using 20mm HBS, the rate includes the cost of all materials, labour, lead, lift, transporting with curing , T&P etc., complete and as per the direction of the Engineer incharge.
Providing Brickwork in CM 1:5, using Class-II Table moulded . The rate includes the cost of all materials, labour, lead, lift, transportation , etc., complete and as per the direction of the Engineer incharge.
Plastering the Brickwork in CM 1:4, 12mm tk including the cost of all materials, labour, lead lift, scaffolding etc., complete and as per the direction of the Engineer incharge.
Dadooing the wall using the ceramic wall tiles of approved quality, brand and design by the engineer at site. The rate includes the cost of all materials, labour, lead, lift, transporting, scaffolding etc., complete and as per the direction of the Engineer incharge.
Paving the floor with best quality vitrified Tiles of following size and variety conforming IS 15622 with water absorbtion less than 0.08% of approved colour and shade laid over cement mortar bed of 20mm thick in cement mortar 1:3 (one cement and three crushed stone sand) with required Cement Slurry and Mortar Plasticizer in all floors and the top pointed with Water Resistant Tile Epoxy Grout etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Painting two coats of plastic interior Emulsion over one coat of primer over the existing plastered surface by cleaning and scrapping the old wall. The rate includes the cost of all materials, labour, lead, lift, scaffolding etc., complete. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Providing Modular kitchen base unit arrangements of 0.60m with Shutter using termite / water proof plywood of 19mm thick over which mica sheet of 0.80mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter including cost and fixing of pull out baskets as per the requirement, all furniture fittings, soft close hinges, handles, etc., complete and as directed by the departmental officers. (SOR Item no. M.2962)
Supplying, providing, fabrication, laying and positioning of RTS rods as reinforcement. The rate includes cost of all materials, labour, lead, lift, transportation, cutting, bending, tying with binding wire, etc., complete and as per the direction of the Engineer incharge.
Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of 50mm thickness in RCC 1:2:4 (one cement, two crushed stone sand and four aggregates), using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing fine polished cuddapah slab of 30mm thickness for cupboard arrangements including laying to correct alignment with necessary cement mortar and black powder etc, complete complying with standard specification and as directed by the departmental officers
Supplying, providing and laying of PVC Pipes, plumbing and sanitary asesssories of approved materials with necessary PVC specials and GI spl clamps in leak proof condtion. The rate includes the cost of all materials required , labour, lead, lift, transport, etc., complete.
110mm dia
75mm dia
25mm dia UPVC
Fabricating Supplying and fixing in position of Aluminium anodized natural colour matt finish two panels openable type window with Aluminium grill of 10mm thick of standard pattern (F) or (H) in all floors with aluminium sections of Outer frame: 37.70x33x2mm @ 0.50 kg/m,Centre mullions:59x33x2.50mm @0.936 kg/m,Shutter frame : Z section 24.50x33x3mm @ 0.525kg/m,Aluminium clips:0.109 kg/m and with neccessary accssories such as rubber beadings, special hinges, handle including supplying and fixing 4mm thick plain glass including cost of all materials, labours, power consumption required for fabrication, drilling holes in RCC column slab, masonry walls wherever necessary with power drills to the required extent and make good to the original conditons after fixing and also as directed. All the Aluminium sections are to the anodised with matt finish under electrically controlled conditons in accordance with Is 1868/1962 for an average anodic film thickness of 15 microns etc.Complete B1992:F1996
Supplying and fixing solid core flush shutter of 35mm thickness MDF board and necessary T.W. internal lipping alround conforming to IS 2202-1(1999) both side prelaminated including cost of wind appliances and furniture fittings such as 3 Nos of SS 304 Grade Parliament Hinges of Size (125mm x 150mm) , 2 Nos 300x12mm aluminium tower bolt 1 No. 200x12mm aluminium tower bolts 1no. 250x16mm aluminium aldrops,2 nos. 200mm ‘D’ type aluminium door handle and door stopper with bush etc., complete complying with standard specification and as directed by the departmental officers -
Supplying and fixing in position best quality approved make Stainless steel of grade SS 304/316 sink of size of 600 x 450 x 200mm including cost of 32mm dia CP waste coupling, 32mm dia PVC waste pipe with rubber plug and chain, 15mm dia brass nipple including fixing the sink in position and testing for leakages etc., complete complying with standard specifications excluding CI brackets. [The sink and specials should be got approved by the Executive Engineer before use on works]
Carting away the debris to a lead of 5KM including loading, unloading and carried away from the site as directed by the site Engineer at site.
GST for bidders within TamilNadu Note : Bidders within Tamil Nadu shall enter values separately for SGST and CGST and shall enter the value as "Zero" for IGST.
GST for bidders outside TamilNadu Note: Bidders outside Tamil Nadu shall enter value only for IGST and shall enter the value as "Zero" for SGST and CGST
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
spec25.pdf
Tender Documents • 0.57 MB
BOQ_787906.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid