| 1 | 1₹99.6 LAccepted-Finance CIVIL LINE THANA KOTWALI DISTRICT BASTI | GONDA | UTTAR PRADESH | 271305 | ₹99.6 L | 1 | Accepted-Finance 1ST LOWEST |
| 2 | 2₹1.0 CrRejected-Finance NIVASI BALASINGHKHEDA POST KARORA DISTRICT LUCKNOW LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹1.0 Cr | 2 | Rejected-Finance 2ND LOWEST |
| 3 | 3₹1.0 CrRejected-Finance VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | ₹1.0 Cr | 3 | Rejected-Finance 3RD LOWEST |
| Sl No | Description | Qty | Unit | M/S J.P. INTERPRISES L2 | M/S ADITYA CONSTRUCTION COMPANY L3 | M/S BHAGWATI TRADERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation of earth for building foundation including all labour , T&P etc. complete in all respect . as per direction of engineer in charge. | 373.06 | Cum | 113.85 ₹42,471.32 | 125.27 ₹46,733.63 | 99.9 ₹37,268.89 Lowest |
| 2.00 | Providing and laying of P.C.C. in 1:3:6 (cement: coarse sand : stone ballast of 20 mm nominal size ) with all the cost of material labour and T&P etc. complete. | 172.88 | Cum | 5,663.49 ₹9,79,133.25 | 5,669.63 ₹9,80,193.72 | 5,500.19 ₹9,50,900.35 Lowest |
| 3.00 | Centering and Shuttering for RCC Work including rent of shuttering and all cost of material, labour and T&P etc. complete | 1,138.66 | Sqm | 878.98 ₹10,00,862.07 | 879.93 ₹10,01,946.07 | 606.99 ₹6,91,155.84 Lowest |
| 4.00 | Providing and laying of C.C. in 1:1.5:3 (cement: coarse sand : stone ballast of 20 mm nominal size )with all the cost of material labour and T&P etc. complete | 254.7 | Cum | 6,957.13 ₹17,72,001.92 Lowest | 6,964.67 ₹17,73,921.12 | 7,229.05 ₹18,41,260.72 |
| 5.00 | Class M 150 brick work in 1:4 (cement: coarse sand) including cost of all material labour and tnp etc | 249.27 | Cum | 5,467.64 ₹13,62,914.18 Lowest | 5,473.57 ₹13,64,390.32 | 5,821.85 ₹14,51,206.73 |
| 6.00 | Plastering of 12 mm thick over brickwork and pillar in 1:4 (cement: coarse sand) including all cost of material ,labour and T&P etc. complete. | 2,906.45 | Sqm | 194.89 ₹5,66,438.71 | 195.1 ₹5,67,052.08 | 194 ₹5,63,851.49 Lowest |
| 7.00 | Providing and laying of reinforcement required for R.C.C. work with cutting, bending, binding including all cost of material ,labour and T&P etc. complete. | 13,500.16 | Kg | 77.39 ₹10,44,790.96 Lowest | 77.47 ₹10,45,922.2 | 78.62 ₹10,61,382.58 |
| 8.00 | Internal Paint finishing of Slab walls with Putty and paint both two Coats Required including of all materials and T&P etc completed.( apex Ultima,Weather Coat all guard) asian,berger | 511.39 | Sqm | 168.07 ₹85,948.28 | 168.25 ₹86,041.35 | 151.01 ₹77,224.85 Lowest |
| 9.00 | Painting of finishing walls with Smooth Exterior Paint of Required even Shade including of all materials and T&P etc completed.( apex Ultima,Weather Coat all guard) asian,berger | 1,857.66 | Sqm | 113.57 ₹2,10,966.38 | 113.69 ₹2,11,194.87 | 111.97 ₹2,08,001.74 Lowest |
| 10.00 | Earthwork in Filling of Low Land Area including all lead ,lift,manual compaction dressing ,labour T&P etc required for proper completion of work. | 2,521.08 | Cum | 219.24 ₹5,52,721.14 | 241.24 ₹6,08,190.66 | 201.16 ₹5,07,140.05 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
15 Jun 2026, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT 10
2026_UPIDC_1157895_10
03/SE-XII/2026-27
Open Tender
Civil Works
Fixed-rate
180 days
RAEBAREI
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,023
₹2.2 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
21 Jul 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of earth for building foundation including all labour , T&P etc. complete in all respect . as per direction of engineer in charge. | 373.06 | Cum | - | - |
| 2 | Providing and laying of P.C.C. in 1:3:6 (cement: coarse sand : stone ballast of 20 mm nominal size ) with all the cost of material labour and T&P etc. complete. | 172.89 | Cum | - | - |
| 3 | Centering and Shuttering for RCC Work including rent of shuttering and all cost of material, labour and T&P etc. complete | 1,138.66 | Sqm | - | - |
| 4 | Providing and laying of C.C. in 1:1.5:3 (cement: coarse sand : stone ballast of 20 mm nominal size )with all the cost of material labour and T&P etc. complete | 254.7 | Cum | - | - |
| 5 | Class M 150 brick work in 1:4 (cement: coarse sand) including cost of all material labour and tnp etc | 249.27 | Cum | - | - |
| 6 | Plastering of 12 mm thick over brickwork and pillar in 1:4 (cement: coarse sand) including all cost of material ,labour and T&P etc. complete. | 2,906.45 | Sqm | - | - |
| 7 | Providing and laying of reinforcement required for R.C.C. work with cutting, bending, binding including all cost of material ,labour and T&P etc. complete. | 13,500.16 | Kg | - | - |
| 8 | Internal Paint finishing of Slab walls with Putty and paint both two Coats Required including of all materials and T&P etc completed.( apex Ultima,Weather Coat all guard) asian,berger | 511.39 | Sqm | - | - |
| 9 | Painting of finishing walls with Smooth Exterior Paint of Required even Shade including of all materials and T&P etc completed.( apex Ultima,Weather Coat all guard) asian,berger | 1,857.66 | Sqm | - | - |
| 10 | Earthwork in Filling of Low Land Area including all lead ,lift,manual compaction dressing ,labour T&P etc required for proper completion of work. | 2,521.08 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
TD10.pdf
Tender Documents • 2.50 MB
BOQ_2170068.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].