| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 LAccepted-AOC K PITCHAMPATTI | CHENNAI | TAMIL NADU | 600019 | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.3 L+₹1.1 L (6.33%)Rejected-AOC NALLAMPALLI | KALLAKURICHI | TAMIL NADU | 605702 | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Withdrawn |
Tender Value
₹18.4 L
EMD Value
₹18,500
Closing Date
1 Aug 2024, 3:00 pmClosed
Block Development Officer VP
Block Development Office Dharmapuri
Construction of New OHT 30000 Lit. Adhagapadi H/O Adagapadi Pt.
2024_RDTN_466382_1
Roc.No.2850/2024/E3 /NABARD24-25/P01
Open Tender
Civil Works
Item Rate
180 days
Block Development Office Dharmapuri
Can be seen Douments
3 documents required · 3 mandatory
₹0
₹18,500
Yes
18 Sept 2024
26 Jul 2024
1 Aug 2024
26 Jul 2024
1 Aug 2024
26 Jul 2024
Amount
Construction of 30000 Ltr OHT at Adagapadi in Adagapadi
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart
First depth of 2m For foundation For GL Brace
Second depth of 1m, For foundation
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers.
For foundation
For GL Landing Platform for ladder
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
For foundation
For GL Brace
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 20mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
For GL Landing Platform for ladder
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by TWAD Boa
For items 1.5m to 4.5m below GL FOOTING Rectangular Portion Trapezoidal portion
For items 0 to 1.50m below GL For column upto G.L. For GL brace For GL brace extended portion for landing slab
For items 0m to 4.5m above GL Columns Brace No 1 at 2.715m For brace extended portion for landing slab For Landing Platform for ladder
For items 4.51m to 7.32m above GL Columns Brace no 2 @5.58m For brace extended portion for landing slab For Landing Platform for ladder
For items 7.32m to 10.98m above GL Columns For beam at 11.45m above GL For brace extended portion for landing slab For Landing Platform for ladder
For items 10.98m to 14.64m above GL Columns For beam at 11.45m above GL For beam extended portion for landing slab For Landing Platform for ladder For floor slab at 11.61m above GL For haunches Sidewall
For items above 14.64m & up to 18.30m from GL Sidewall For Roof Slab @14.75 to 14.93 m from GL Deduction for manhole cover For PVC cowl
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding
PLANE SURFACES Below G.L. For Footing Side For GL Brace bottom For GL Brace sides GL brace extn portion-bottom GL brace extn portion-outside GL brace extn portion-inside LANDING PLATFORM GL Landing Platform-side GL Landing Platform-outside GL Landing Platform-Bottom
ABOVE G.L. to 3.30m For Ist Brace bottom @2.715m For Ist Brace Brace sides Brace extn portion-bottom Brace extn portion-outside Brace extn portion-inside Brace extn portion-face Landing Platform-side Landing Platform-outside FROM FLOOR TO 3.30 M Roof slab bottom For sidewall junction with Roof bottom ADD Sides of manhole
5.30m . to 6.30m For IInd Brace bottom @5.58m For IInd Brace Brace sides Brace extn portion-bottom Brace extn portion-outside Brace extn portion-inside Brace extn portion-face Landing Platform-side Landing Platform-outside Landing Platform-Bottom
8.30m . to 9.30m For IIIrd Brace bottom @8.445m For IIInd Brace Brace sides Brace extn portion-bottom Brace extn portion-outside Brace extn portion-inside Brace extn portion-face Landing Platform-side Landing Platform-outside Landing Platform-Bottom
11.31m to 12.30m Floor beam bottom @11.45 m Floor beam inside outside Beam Extn Portion bottom outside inside face Landing platform side outside bottom Deuduct Beam bottom Coloumn Juction
Curved Surface 0 to 3.30m from floor level Sides of floor slab Side wall outer Side wall inner Haunch (slanting) Sides of roof slab
Square column Below G.L. Column below G.L. Deduct brace junction
Ground level to 3.30 m Ground level to 3.30 m Deduct brace @2.715
Square column
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by TWAD Board officers
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers.
Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50mm x 6mm MS angle for both sides and for steps at 30cm C/C welded jointed etc ., for I staging from GL to 1st level brace (weight 4.5kg/m) IInd and IIIrd staging upto floor slab and IVth staging from floor slab to roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand rails from I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 nos. at Ground Level- 1No. and above Ground Level - 4Nos. Supply and fixing of 32mm GI pipe medium for hand rails for the Landing slab. Supplying and fixing of MS Base plate of 100mm X 100mm X 6mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing slab and MS Ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved Type Design and as directed by TWAD board officers.
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cu
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by TWAD Board officers
Providing cut stone slab in CM 1:3 and as directed by TWAD Board officers
Providing manhole cover of size 1x1 0.60 X 0.60M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by TWAD Board officers.
Pipe connection to SR 65mm Ø GI pipes for over flow & 1xl
65mm Ø GI pipes for over flow & 1xl
50mm Ø GI pipes for scour pipe 1xl
65mm Ø GI pipe for delivery 1x1 pipe
90mm Ø PVC Threaded coupler
65 mm Ø PVC threaded coupler
65mm Ø GI Tee
65mm Ø GI 900 Bend
65mm Ø GI coupler
65mm Ø GI union
65mm Ø GI Elbow
65mm Ø GM Gate valve
50mm Ø GM gate valve
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers. As per item l(a) + l(b) Less item 2,3 & 4A & 4B Total
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply of 63mm PVC Pipes including cost and conveyance of all materials to site and all labour charges etc., completed.
Labour charges for laying and joining 40mm HDPE Pipes including all labour charges for laying pipes in proper alingment and gradient including cost of solvent cement etc., complete.
Refilling with excavated earth after laying of pipes including all labour charges Solvent cement etc., complete.
Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
C.Krishnan Contractor (BID ID -1094864)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .