| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Found L1 Bidder |
| 2 | L2₹1.1 Cr+₹72,186 (0.66%)Rejected-Finance SRINAGAR AIRPORT SRINAGAR AIRPORT SRINAGAR AIRPORT BUDGAM JAMMU KASHMIR 190007 | BUDGAM | JAMMU AND KASHMIR | 190007 | ₹1.1 Cr+₹72,186 (0.66%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.2 Cr+₹9.6 L (8.78%)Rejected-Finance D S 185 186 SECTOR D LDA COLONY KANPUR ROAD LUCKNOW LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | ₹1.2 Cr+₹9.6 L (8.78%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.4 Cr+₹28.2 L (25.8%)Rejected-Finance 2 44 A 4 KALU SARAI HAUZ KHAS DELHI SOUTH WEST DELHI DELHI 110016 | SOUTH DELHI | DELHI | 110016 | ₹1.4 Cr+₹28.2 L (25.8%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical 1ST FLOOR RAGHUNATH MARKET NEAR TELEPHONE EXCHANGE PATHANKOT 145001 | PATHANKOT | PUNJAB | 145001 | - | - | Rejected-Technical Not found eligible as per eNIT criteria. |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
3 Aug 2022, 6:00 pmClosed
AGM (Engg-E)
Srinagar Airport
Operation and maintenance of HVAC system, VRF System, Fire Alarm and Fire Fighting system, Split/Window ACs, Water Coolers etc. at Srinagar Intl Airport, Srinagar (For the year 2022-23 and 2023-24).
2022_AAI_122049_1
AAI/Engg-E/HVAC-Fire Fighting/2022
Open Tender
Electrical Works
Works
730 days
Srinagar Airport
Please refer Tender documents.
15 documents required · 15 mandatory
₹1,180
Yes
₹3.0 L
Yes
29 Sept 2022
13 Jul 2022
5 Aug 2022
14 Jul 2022
3 Aug 2022
14 Jul 2022
14 Jul 2022 - 20 Jul 2022
Amount
SH-A: Operation & Maintenance. Operation and maintenance of HVAC system of terminal building comprising of HSD oil fired Hot brine generators of capacity (4 nos X 10 Lac K cal / Hr), central chiller plant of capacity 3x200 TR , 26 nos of AHU's of different capacities, brine make up pump, primary and secondary brine circulating pump, handling of HSD oil in under ground storage tank and Automatic Addressable Fire Alarm & Detection system, Fire Hydrant & Fire Fighting system and automatic sprinkler system installed in Terminal Building and new cargo building including monitoring of fire alarm panel, smoke/heat detectors, RI, manual call point, hooters, Isolator, etc. on all working days i/c Saturdays, Sundays, Gazetted holidays & National holidays as per special conditions of contract etc. complete as required. The contractor has to deploy the following minimum man power in the work to the entire satisfaction of the Engineer-in-Charge. (i) Supervisor (Highly Skilled) :- 01 nos. (ii) HVAC/ Fire system- Operator (Skilled) :- 13 nos. (i/c reliever) (iii) HVAC/ Fire system- Helper (un-skilled):- 09 nos (i/c reliever)
Complete overhauling/servicing and preventive maintenance of central heating plant once in a year comprising of 04 nos. HSD oil fired 10 lakh K. Cal./ hour capacity hot brine generator, 1No. Heat Exchanger installed in heating plant room including arrangement of necessary scaffolding and cleaning material by carring out following minimum works at site : (i). Complete cleaning including removal of any soot/deposits/scaling/metal corrosion from wire/nylon brushes on water side as well as fire side surfaces of boiler drum. (ii). Cleaning and servicing of fire nozzle, circulating pump, oil preheaters, oil storage tanks etc. (iii). Cleaning and checking of all electrical terminals. Checking of electronic controls. (iv). Replacement of all gaskets to provide tight seal. (v).Inspection and repairing of all boiler insulation and casings. (vi). Servicing of safety valves, expansion joints, isolating valves. (vii). Servicing and re-calibration of all pressure, temperature controllers/switches/meters/gauges etc. (viii).Inspection and servicing of heat exchanger fins including combing out any bents and removing of dirt etc.
Repairing & Rewinding of following Hot/ Chilled Water circulating Centrifugal Pump set including, dismantling, repairing of shaft, replacing of defective mechanical seals, bearing, nuts, bolts, gaskets, gland etc. complete as required. a) 3 Phase Induction motor, Make Crompton greaves/ ABB 20/15HP Motor, 1460RPM, 415V, +/- 10%, Frame ND160M,Centrifugal pump, Make Beacon Weir Ltd, Type BWC 80-100, Total Head 28 Meter, Capacity 25 lps, speed 1450rpm, Input 8.79BKW,EFF 79%.
Repairing of following sizes of 3 Phase Induction motor, set including, rewinding of motor, dismantling, repairing of shaft, replacing of defective mechanical seals, bearing, nuts, bolts, gaskets, gland etc. complete as required. (Rates also includes transportation charges of motor upto workshop & taking back & fixing of motor in AHU Room).
25HP Motor
20HP Motor
15HP Motor
10HP Motor
7.5HP Motor
Carrying out of "B-check" maintenance of Kirloskar make Diesel engine pump set half yearly of 53 KW/ 72 HP capacity including supply and fixing of element fuel/oil filter, kit air cleaner, by pass filter including supply & replacement of lub oil etc. for the DG set as required. (B-check will be carried out by Authorized dealer of Kirloskar company or by OEM).
Carrying out quarterly inspection / service visit for Kirloskar make Diesel engine pump DG set of 53 KW/72 HP capacity by authorized dealer of Kirloskar company or by OEM including carrying out performance check as per OEM practices and submission of report etc complete as required.
SH-B: ACMC of A/C's / Water coolers/Water fountains Annual all inclusive comprehensive maintenance of 1.0/1.5 /2.0 ton split type Air conditioner unit by carrying out weekly/monthly/annual preventive service maintenance and unlimited breakdown maintenance including repairing/replacement(if required) of all defective components like PCB, control circuit, fan motor, compressor, fuses, relays, contactors , control wiring, condensor coil , supply and topping up of refrigerant gas etc. complete as required.
FIRST YEAR OF CONTRACT PERIOD
SECOND YEAR OF CONTRACT PERIOD
Annual all inclusive comprehensive maintenance of 3.0/4.0 /4.5/4.6 ton tower type Air conditioner unit by carrying out weekly/monthly/annual preventive service maintenance and unlimited breakdown maintenance including repairing/replacement(if required) of all defective components like PCB, control circuit, fan motor, compressor, fuses, relays, contactors, control wiring, condenser coil , supply and topping up of refrigerant gas etc. complete as required.
FIRST YEAR OF CONTRACT PERIOD
SECOND YEAR OF CONTRACT PERIOD
Annual all inclusive comprehensive maintenance of 3.0 ton cassette type Air conditioner unit by carrying out weekly/monthly/annual preventive service maintenance and unlimited breakdown maintenance including repairing/replacement(if required) of all defective components like PCB, control circuit, fan motor, compressor, fuses, relays, contactors, control wiring, condensor coil , supply and topping up of refrigerant gas etc. complete as required.
FIRST YEAR OF CONTRACT PERIOD
SECOND YEAR OF CONTRACT PERIOD
Annual all inclusive comprehensive maintenance of water coolers of different capacity by carrying out weekly/monthly/annual preventive service maintenance and unlimited breakdown maintenance including repairing/replacement(if required) of all defective components like PCB, control circuit, fan motor, compressor, fuses, relays, contactors, control wiring, condensor coil , supply and topping up of refrigerant gas etc. complete as required.
FIRST YEAR OF CONTRACT PERIOD
SECOND YEAR OF CONTRACT PERIOD
Dismantling of 1.0/1.5/2.0 TR split air conditioning unit by dismantling it from existing location and submission of same to AAI store etc. complete as required.
Installation, testing and commissioning of 1.0/1.5/2.0 TR split air conditioning unit including fixing of copper piping, drain piping, insulation, charging of refrigerant gas, pressure testing etc. complete as required.
Supply of refrigerant gas suitable for air conditioners and water cooler units of different capacities installed at airport premises as and when required.
Supply and fixing of suction and discharge copper piping with suitable insulation and of suitable size for 1.0/1.5/2.0 Ton split air conditioner etc. complete as required.
Supply and fixing of suction and discharge copper piping with suitable insulation and of suitable size for 3.0/3.5/4.0/4.5/4.6 Ton tower/cassette type air conditioner etc. complete as required.
Supply and fixing of 25mm hard PVC drain pipe complete as required .
Painting of exposed water pipe lines/metal surfaces in HVAC plant/AHU room with synthetic enamelled paint by spray/ brush painting by applying one or more coats including scraping, cleaning of surfaces etc. complete as required as per direction of Engineer-in-charge.
Annual all inclusive comprehensive maintenance of voltage stabilizers of different capacity and makes suitable for 1.0/1.5/2.0 TR air conditioners by carrying out preventive service maintenance and unlimited breakdown maintenance including repairing/replacement(if required) of all defective components like PCB, control circuit, regulator, fuses, relays, contactors, control wiring etc. complete as required.
FIRST YEAR OF CONTRACT PERIOD
SECOND YEAR OF CONTRACT PERIOD
Annual all inclusive comprehensive maintenance of wall hanging, non refrigerated, barrier free, drinking water fountain unit ( Make: WAE, Model No.-WAE-HTHB-OVLEBP-I) with booster/ pressurizing unit, front side mechanical push button to activate the flow of water ,and bottle filling station by carrying out preventive maintenance and unlimited breakdown maintenance including repairing/replacement(if required) of all defective components like PCB, control circuit, SMPS, photo/electric sensor, push button , control/electric wiring etc. complete as required.
FIRST YEAR OF CONTRACT PERIOD
SECOND YEAR OF CONTRACT PERIOD
SH-C: AICMC OF VRF System Annual all inclusive comprehensive maintenance of VRF modular type air-conditioning system of make-Toshiba having outdoor units (03 nos of 8 HP capacity each) and indoor units (06 nos. cooling mounted cassette unit of 3.2 TR cooling capacity each) including remote controller complete refrigerant piping between indoor & outdoor units, wiring by carrying out preventive maintenance and unlimited breakdown maintenance etc. complete as required.
FIRST YEAR OF CONTRACT PERIOD
SECOND YEAR OF CONTRACT PERIOD
M/s AL-HUDA ELECTRICAL AND MAINTENANCE
Anoop Refrigeration
SWASTIK ELECTROTECH PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .