Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.0 Cr+₹3.2 L (3.25%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
2 May 2022, 2:00 pmClosed
CGM D, LAR
Bijulee Bhawan. Paltan Bazar. Ghy-1
CONSTRUCTION OF 33 KV LINE TO FEED POWER SUPPLY AT LnT CAMPUS AT ADABARI PT II FOR CONSTRUCTION OF DHUBRI_PHULBARI BRIDGE UNDER DEPOSIT WORK ON FULL TURNKEY MODE.
2022_APDCL_25144_1
CGM D/APDCL/LAR/DHUBRI PHULBARIBRIDGE/2022_23/T_60
Open Tender
Electrical Works
Turn-key
60 days
Dhubri
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,200
₹15 L
Bijulee Bhawan. Paltan Bazar. Ghy-1
31 Dec 2022
14 Apr 2022
3 May 2022
14 Apr 2022
2 May 2022
24 Apr 2022
18 Apr 2022
CONSTRUCTION OF 33 KV LINE TO FEED POWER SUPPLY AT L&T CAMPUS AT ADABARI PT-II FOR CONSTRUCTION OF DHUBRI-PHULBARI BRIDGE UNDER DEPOSIT WORK ON FULL TURNKEY MODE. (refer Annexure-1) Itemwise price should be filled in strictly as per the detailed Bill of Quantities at respective referred Annexur.
DI POWER AND INFRACON PVT. LTD.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .