Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.4 LAccepted-AOC MAHALAKPUR NIZAMPUR AGHWANPUR ROAD AGHWANPUR MORADABAD UTTAR PRADESH 244001 | MORADABAD | UTTAR PRADESH | 244001 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹35.2 L+₹73,311.56 (2.13%)Rejected-Finance ANANDAPALLY WARD NO VII P O P S MAL DIST JALPAIGURI PIN 735221 WB | MAL | JALPAIGURI | WB | 735221 | L2 | Rejected-Finance Not lowest | |
| 3 | L3₹35.9 L+₹1.4 L (4.00%)Rejected-Finance KAMARVITA AMBARI FALAKATA JALPAIGURI | JALPAIGURI | JALPAIGURI | WEST BENGAL | L3 | Rejected-Finance Not lowest | |
| 4 | L4₹39.0 L+₹4.5 L (13.1%)Rejected-Finance | L4 | Rejected-Finance Not lowest |
| Sl No | Description | Qty | Unit | M S BHARAT CONSTRUCTION CO. L1 | ROY CONSTRUCTION AND CONSULTANCY L3 | BIJOY DEY L2 | PUSHPA CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Stone slabs and tiles of any description or thickness in floors, aprons etc. laid dry or laid dry and
pointed and removing rubbish off the premises etc complete all as specified and directed | 2.44 | TEN SQM | 206 ₹502.64 | 205 ₹500.2 | 200 ₹488 Lowest | 1,050 ₹2,562 |
| 2.00 | Demolition of Stone slabs and tiles of any description or thickness in floors, aprons etc. laid, bedded pointed in any mortar and removing rubbish off the premises etc complete all as specified and directed. (Note for item No. 1.00 & 2.00 :- Serviceable tiles/paver blocks shall be segregated and stacked carefully to reuse) | 2.4 | TEN SQM | 207 ₹496.8 Lowest | 210 ₹504 | 210 ₹504 | 1,150 ₹2,760 |
| 3.00 | Demolition of cement concrete (un reinforced) in ground floors and paving n. exc. 15 cm thickness (below or above ground level) removing rubbish off the premises etc complete all as specified and directed | 44.38 | CUM | 350 ₹15,533 | 300 ₹13,314 | 240 ₹10,651.2 Lowest | 950 ₹42,161 |
| 4.00 | Demolition of cement concrete (un reinforced) of any description and in in any position not otherwise specifically provided for, removing rubbish off the premises etc complete all as specified and directed. | 1.18 | CUM | 301 ₹355.18 Lowest | 800 ₹944 | 550 ₹649 | 750 ₹885 |
| 5.00 | Demolition of concrete (reinforced) of any description and in any position not otherwise specifically provided for, removing rubbish off the premises etc complete all as specified and directed. | 12.5 | CUM | 380 ₹4,750 | 546 ₹6,825 | 90 ₹1,125 Lowest | 1,350 ₹16,875 |
| 6.00 | Taking down galvanised steel barbed wire of any description as in fencing, fixed to any type of standard rails complete all as directed. | 39.85 | 100 RM | 82 ₹3,267.7 | 98 ₹3,905.3 | 5 ₹199.25 Lowest | 210 ₹8,368.5 |
| 7.00 | Dismantling fencing wire mesh any type complete all as directed. | 48 | SQM | 3 ₹144 Lowest | 5 ₹240 | 15 ₹720 | 15 ₹720 |
| 8.00 | Dismantling posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion in natural ground and making good disturbed ground complete all directed. | 103.5 | RM | 10 ₹1,035 Lowest | 12 ₹1,242 | 17 ₹1,759.5 | 20 ₹2,070 |
| 9.00 | Dismantling posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion in concrete and making good disturbed ground complete all directed. | 138 | RM | 11 ₹1,518 Lowest | 14 ₹1,932 | 200 ₹27,600 | 30 ₹4,140 |
| 10.00 | Demolition of brickwork built in cement mortar and removing rubbish off the premises etc complete all as specified and directed | 61.13 | CUM | 618 ₹37,778.34 | 180 ₹11,003.4 Lowest | 250 ₹15,282.5 | 950 ₹58,073.5 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
5 May 2026, 6:00 pmClosed
GE SEVOKE ROAD
GE Sevoke Road Post Salugara Dist Jalpaiguri PIN 734008
REPAIR TO FENCING , COMPOUND WALL, PATH, WATER STAGING, AREA DRAINAGE AND MISC WORKS AT CENTRAL ZONE AREA OF BAGRAKOTE MIL STN UNDER GE SEVOKE ROAD
2026_MES_760270_1
8602/SEV OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
GE SEVOKE ROAD
As per tender documents
8 documents required · 8 mandatory
₹500
GE SEVOKE ROAD
₹96,000
28 Jul 2026
15 Apr 2026
8 May 2026
15 Apr 2026
5 May 2026
29 Apr 2026
16 Apr 2026 - 24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Demolition of Stone slabs and tiles of any description or thickness in floors, aprons etc. laid dry or laid dry and
pointed and removing rubbish off the premises etc complete all as specified and directed | - | TEN SQM | - | - |
| - | Demolition of Stone slabs and tiles of any description or thickness in floors, aprons etc. laid, bedded pointed in any mortar and removing rubbish off the premises etc complete all as specified and directed. (Note for item No. 1.00 & 2.00 :- Serviceable tiles/paver blocks shall be segregated and stacked carefully to reuse) | - | TEN SQM | - | - |
| - | Demolition of cement concrete (un reinforced) in ground floors and paving n. exc. 15 cm thickness (below or above ground level) removing rubbish off the premises etc complete all as specified and directed | - | CUM | - | - |
| - | Demolition of cement concrete (un reinforced) of any description and in in any position not otherwise specifically provided for, removing rubbish off the premises etc complete all as specified and directed. | - | CUM | - | - |
| - | Demolition of concrete (reinforced) of any description and in any position not otherwise specifically provided for, removing rubbish off the premises etc complete all as specified and directed. | - | CUM | - | - |
| - | Taking down galvanised steel barbed wire of any description as in fencing, fixed to any type of standard rails complete all as directed. | - | 100 RM | - | - |
| - | Dismantling fencing wire mesh any type complete all as directed. | - | SQM | - | - |
| - | Dismantling posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion in natural ground and making good disturbed ground complete all directed. | - | RM | - | - |
| - | Dismantling posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion in concrete and making good disturbed ground complete all directed. | - | RM | - | - |
| - | Demolition of brickwork built in cement mortar and removing rubbish off the premises etc complete all as specified and directed | - | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_851583.xls
BOQ • 0.32 MB
TENDERDOCUMENTS8602.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .