| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | L1 | Accepted-AOC Accepted being lowest | |
| 2 | L2₹2.9 L+₹18,420 (6.81%)Rejected-AOC | L2 | Rejected-AOC Reject | |
| 3 | L3₹2.9 L+₹19,920 (7.36%)Rejected-AOC | L3 | Rejected-AOC Reject | |
| 4 | L4₹2.9 L+₹21,420 (7.92%)Rejected-AOC | L4 | Rejected-AOC Reject | |
| 5 | L5₹2.9 L+₹22,220 (8.21%)Rejected-AOC | L5 | Rejected-AOC Reject |
Tender Value
Refer Docs
Closing Date
2 Nov 2020, 10:00 amClosed
Garrison Engineer North Ahmednagar
Military Engineer Services Garrison Engineer (N) Ahmednagar
CALL FOR QUOTATION FOR JOB WORK FOR REPAIR OF POWER TRANSFORMER 315 KVA SI NO 2026/1962 MAKE NATIONAL ELECTRICAL IND LTD AT AC RECORD SUBSTATION UNDER GE (N) AHMEDNAGAR
2020_MES_384291_1
3114/Job/02/E3
Limited
Job Works
Works
30 days
Garrison Engineer North Ahmednagar
Pl ref NIT documents
2 documents required · 2 mandatory
₹0
Exempted
11 Nov 2020
8 Oct 2020
3 Nov 2020
8 Oct 2020
2 Nov 2020
9 Oct 2020
Store Items :
QUOTATION FOR JOB WORK ORDER FOR REPAIRING OF POWER TRANSFORMER 315 KVA SI NO : 2026/1962 MAKE NATIONAL ELECTRICAL INDUSTRIAL LTD AT AC RECORD SUB STATION UNDER GE (N) AHMEDNAGAR :- (a) M & L for disconnecting all incoming and outgoing connection of earthing, lifting of power transformer 315 KVA from plith by using crane carefully and transportation to workshop for maintenance and shifting back to substation from work shop installing carefully on the plinth, reconnecting all cables and earthing, errecting, testing and commissioning all as directed. Each Job 01 No (b) Decanning of transformer oil, opening the cover and lifting of core for the inspection, removal of perrished coil insulations, cleaning the core and tank thoroughly, reinsulating the coills and baking in oven, replacement of bushing studs, replacement of perished bushing gaskets replacement of perished core gaskets of tank. Scrapping old paint and rusted portion of tank cleaning and painting with two coats of anticorrosive paint, lowering the core in the tank making the proper connections/ brazings, cheking of transformer with insulation level and ratio test, sealing the covers, replacement of silica gel from breather. Note :- (i) Insulating materials for spacing of coils, insulation required for serviceable core required shal be measured and paid separately as supply only. (ii) Contractor has to give the guarantee of one year for satisfactory performance of the transformer. (c) Supply only insulating materials for spacing of coils. 120 Kg. (d) Supply only replacement of LV terminal rod. Each 3. (e) Suuply only LV Bushing cap Each 3 . (f) Supply only LV Bushing member Each 12 . (g) Supply only replacement Breather assembly Each 01 (h) Supply only replacement explosion vent diaphragm 01 No (j) Supply only replacement core bolt insulation Each 16. (k) Re-winding of copper LT coil of three limb of transformer Kg 220. (l) Supply and fix oil for transformer. Ltr 602. Note : Ser No (a) to (l) for One Job.
Ms. HARIKIRPA ENTERPRISES
M/S VANDAN ENTERPRISES
JAI BHARAT ENTERPRISES
HIRA ENTERPRISES
Ajanthaenterprises
Global Enterprises
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_428772.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .