| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 CrAccepted-AOC WARD NO 01 KORBA DARRI ROAD DARRI ROAD VILLAGE TOWN KORBA CITY KORBA KORBA CHHATTISGARH 495677 INDIA | KORBA | CHHATTISGARH | 495677 | ₹2.0 Cr Quoted ₹1.7 Cr | L-1 | Accepted-AOC The work is awarded to the L-1 bidder. |
| 2 | L-2₹1.9 Cr+₹22.8 L (13.6%)Rejected-Finance 120 RAMAYAN KOSABADI DIST KORBA CHHATTISGARH 495677 | KORBA | CHHATTISGARH | 495677 | ₹1.9 Cr+₹22.8 L (13.6%) | L-2 | Rejected-Finance Due to L-2 bidder |
| 3 | L-3₹22.8 L−₹1.5 Cr (86.4%)Rejected-Finance | ₹22.8 L−₹1.5 Cr (86.4%) | L-3 | Rejected-Finance Due to L-3 bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical All confirmatory documents not submitted |
Tender Value
₹2.1 Cr
EMD Value
₹2.6 L
Closing Date
29 Dec 2022, 5:00 pmClosed
GM CIVIL GEVRA AREA
Office of the General Manager , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)Contact No. 9425534061
Dust suppression by truck mounted tankers (9/12/15/18 KL Capacity) on coal transportation roads platform No. 1 and 2, it approaches from S-1 bunker to helipad barrier, main sub-station building to Silos Junction at Gevra Project of Gevra Area.
2022_SECL_264780_1
SECL/GA/GM(C)/ETN/22-23/134 dtd. 10.12.22
Open Tender
Civil Works - Others
Item Rate
365 days
Gevra Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹2.6 L
10 Feb 2023
13 Dec 2022
31 Dec 2022
13 Dec 2022
29 Dec 2022
14 Dec 2022
13 Dec 2022 - 22 Dec 2022
Amount
Item Description/ Heading
Dust suppression of road surface using 9/12/15/18 KL Capacity tanker to keep the road surface properly wet including hiring charges of tankers, all tools and plants, payment of drivers, cost of POL etc, all complete as per instruction of Engineer-in-charge as detailed below (in all 03 (three) shifts :- From July to Sep = 3 times (1st Shift - 1 time , 2nd Shift -1 time, 3rd shift - 1 time) From Oct to Jan = 5 times (1st Shift - 2 time, 2nd Shift - 2 time and 3 Shift - 1 time) From Feb to March = 5 times (1st Shift - 2 times, 2nd Shift 2 times & 3rd shift - 1 time), From April to June = 8 times (1st Shift - 3 times, 2nd Shift - 3 & 3rd shift - 2 time) NOTE:- (1) Minimum 05 nos tankers of 9/12/15/18 KL or equivalent capacity each required to be engaged during July to Sept, 05 Nos tankers from Oct to January of 9/12/15/18 KL Capacity, 10 Nos. tankers from Feb to March of 9/12/15/18 KL Capacity and 10 Nos tankers from April to June of 9/12/15/18 KL Capacity and additional 2 Nos stand by tanker has to be provided by the agency during full claim period. (Tanker 9000.00 ltr capacity orequivalent for calculation purpose as required) (2) Bidder are requested to quote their rate as per scope of work enclosed in NIT. (3) Tankers shall be allowed to be deployed after checking the road worthiness by E&M Department.(4) 45 days period, out of 1 year is to be considered for wet days on which dust suppression may be not required.(5) Approximate no. of trips considered for each season, but actual trip may vary as per site condition. (6) The tankers shall be fitted with GPS and the record of GPS is to be submitted for bill preparation & payment. (A) WBM / Earthen Road Surfaces
Dust suppression of road surface using 9/12/15/18 KL Capacity tanker to keep the road surface properly wet including hiring charges of tankers, all tools and plants, payment of drivers, cost of POL etc, all complete as per instruction of Engineer-in-charge as detailed below (in all 03 (three) shifts :- From July to Sep = 3 times (1st Shift - 1 time , 2nd Shift -1 time, 3rd shift - 1 time) From Oct to Jan = 5 times (1st Shift - 2 time, 2nd Shift - 2 time and 3 Shift - 1 time) From Feb to March = 5 times (1st Shift - 2 times, 2nd Shift 2 times & 3rd shift - 1 time), From April to June = 8 times (1st Shift - 3 times, 2nd Shift - 3 & 3rd shift - 2 time) NOTE:- (1) Minimum 05 nos tankers of 9/12/15/18 KL or equivalent capacity each required to be engaged during July to Sept, 05 Nos tankers from Oct to January of 9/12/15/18 KL Capacity, 10 Nos. tankers from Feb to March of 9/12/15/18 KL Capacity and 10 Nos tankers from April to June of 9/12/15/18 KL Capacity and additional 2 Nos stand by tanker has to be provided by the agency during full claim period. (Tanker 9000.00 ltr capacity orequivalent for calculation purpose as required) (2) Bidder are requested to quote their rate as per scope of work enclosed in NIT. (3) Tankers shall be allowed to be deployed after checking the road worthiness by E&M Department.(4) 45 days period, out of 1 year is to be considered for wet days on which dust suppression may be not required.(5) Approximate no. of trips considered for each season, but actual trip may vary as per site condition. (6) The tankers shall be fitted with GPS and the record of GPS is to be submitted for bill preparation & payment. (B) Concrete road surfaces.
Total impact of GST for the purpose of CTC
VERITY INDIA
AADITYA CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .