| 1 | L1₹16.5 LAccepted-AOC NO 1 CHURCH STREET KARAIKAL | KARAIKAL | PUDUCHERRY | 609601 | ₹16.5 L | L1 | Accepted-AOC Quoted lower rate |
| 2 | L2₹16.6 L+₹5,900 (0.36%)Rejected-AOC NO 46 PERUMAL KOIL STREET MISSION STREET CUTTING PUDUCHERRY 605 001 | PONDICHERRY | PUDUCHERRY | 605001 | ₹16.6 L+₹5,900 (0.36%) | L2 | Rejected-AOC Not quoted lower rate |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance PLOT NO 13 SHAKTI KHAND II INDRAPURAM GHAZIABAD 201014 | GHAZIABAD | UTTAR PRADESH | 201014 | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-The bidder had not furnished Technical documents as per Bid Qualification Requirement |
Tender Value
₹17.1 L
EMD Value
₹43,000
Closing Date
3 Jan 2024, 11:00 amClosed
The Superintending Engineer-MP and ORs,
Electricity Department, No.137, Subash Chandra Bose Salai, Puducherry 605 001
Extension of Power supply to one No of HT Service connection for a load of 150 KVA in favour of the Executive Engineer PWD at Melakasakudy Village in Nedungadu O and M Karaikal
2023_EDCC_14596_1
e.No.01/ED/EE-KKL/2023-24
Open Tender
Electrical Works
Works
60 days
Karaikal
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
Yes
The Executive Engineer-Karaikal, PED
₹43,000
Yes
3 Jul 2024
22 Dec 2023
3 Jan 2024
22 Dec 2023
3 Jan 2024
22 Dec 2023
22 Dec 2023 - 3 Jan 2024
Extension of Power supply to one No of HT Service connection
Supply of V cross arm with pole clamp
Supply of 11 KV insulator with GI Pin
Supply of F Clamp with stay clamp
Labour charges for erection of DP Structure without bed channel with the following works a) Supply and erection of 30 feet RCC poles including excavation of pit, refilling and concreting for a size of 0.6x0. 6x 1.5 mts and coping 0.6x0. 6x 0.5 in 1:3:6 ratio using cement, 20 mm HBG blue metal and sand with all materials b) Erection of DP structure without Bed channel in cluding V cross arm, F clamp and pin insulator (DP Structure material and clamp set will be supplied by the Department) c) Erection of 200/400 A single contact AB Switch and wiring with ACSR conductor (200/400 A single contact AB Switch will be supplied by the Department) d) supply and earthing (2 Nos) of DP Structure and AB Switch with 50 mm dia of B Class GI pipe of 3 mts length and connected with all metal parts with No 8 GI wire. e) Supply and erection of One No. of HT Stay set f) Painting for RCC pole with cement paint and metal parts with Aluminum paint . All works to be carried out as per the direction of the Engineer-in-charge) ( DP structure materials , DP Structure clamp set ,200/400 A single contact AB Switch will be supplied by the department
Supply and laying of 11KV 3 core XLPE insulated 95 Sq-mm HT UG cable direct in ground including excavation of trench for size of 0.5 m width and 1.2 mts depth with sand cushioning of 0.08m (8 cm) below the cable and 0.17 mts (17cm) above the cable and covering with RCC trough and refilling etc
Labour charges for erection of DP Structure with bed channel for erection of Metering cubicle with the following works a) Supply and erection of 30 feet RCC poles including excavation of pit, refilling and concreting for a size of 0.6x0. 6x 1.5 mts and coping 0.6x0. 6x 0.5 in 1:3:6 ratio using cement, 20 mm HBG blue metal and sand with all materials b) Erection of DP structure with Bed channel in cluding V cross arm, F clamp and pin insulator and formation of BUS with ACSR 7/2.59 conductor (DP Structure material and clamp set will be supplied by the Department) C) Erection of 200/400 A single contact AB Switch ( 200/400 A single contact AB Switch will be supplied by the Department) d) Supply and erection of 9KA lightining arreator and 11KV HG fuse (e) Wiring the structure , HG fuse ,Lightning arrestor with No 2 Copper wire, required alkathene pipe , and required pin insulator f) earthing (2 Nos) of DP Structure and AB Switch with 50 mm dia of B Class GI pipe of 3 mts length and connected with all metal parts with No 8 GI wire and one seperate earth for lightning arrestor with No 8 copper wire. g) Supply and erection of One No. of HT Stay set, h) Painting for RCC pole with cement paint and metal parts with Aluminum paint. All works to be carried out as per the direction of the Engineer-in-charge)
Labour charges for erection of DP Structure without bed channel for erection of Distribution Transformer with the following works a) Supply and erection of 30 feet RCC poles including excavation of pit, refilling and concreting for a size of 0.6x0. 6x 1.5 mts and coping 0.6x0. 6x 0.5 in 1:3:6 ratio using cement, 20 mm HBG blue metal and sand with all materials b) Erection oF DP structure without Bed channel including V cross arm, F clamp and pin insulator and formation of BUS with ACSR 7/2.59 conductor (DP Structure material and clamp set will be supplied by the Department) C) Erection of 200/400 A single contact AB Switch ( 200/400 A single contact AB Switch will be supplied by the Department) d) Supply and erection of 9KA lightining arreator and 11KV HG fuse (e) Wiring the structure , HG fuse ,Lightning arrestor and transformer with No 2 Copper wire, required alkathene pipe , and required pin insulator f) earthing (2 Nos) of DP Structure and AB Switch with 50 mm dia of B Class GI pipe of 3 mts length and connected with all metal parts with No 8 GI wire , one seperate earth for lightning arrestor with No 8 copper wire with 50 mm dia of B Class GI pipe of 3 mts length and one seperate earth for lightning arrestor with No 8 copper wire with 50 mm dia of B Class GI pipe of 3 mts length g) Supply and erection of One No. of HT Stay set, h) Painting for RCC pole with cement paint and metal parts with Aluminum paint . Erection of Distribution Transformer All works to be carried out as per the direction of the Engineer-in-charge)
Construction of Plinth for a size of 1.m x 1.5m for a height of 1.5 mts with country brick or cement block or AAC block and painting with cement paint as directed by the Engineer-in -charge
Supply and laying of 11KV 3 core XLPE insulated 95 Sq-mm cable in open space through 100mm sizeof GI pipe of class B for pole pole raising
Supply and providing Heat shringable straight through joint suitable for 11KV 3 core XLPE insulated 95 Sq-mm cable
Supply and providing Heat shringable out door end termination kit suitable for 11KV 3 core XLPE insulated 95 Sq-mm cable
Supply and laying of XLPE insulated 3 ½ core 300 Sq-mm LT UG Cable direct in ground including excavation for a size of o.5 m breath and 0.75 mts depth with sand cushioning protective covering etc as directed by the engineer -in-charge and termination the both end one in distribution Transformer and the another in the MV Panel with suitable lug
KARTHIK ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_14911.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .