Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹23 L+₹30,000 (1.32%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹23.2 L+₹50,000 (2.20%)Rejected-Finance 29688 GADI NO 0 NEAR DUGAL RESORT POPAL NAGAR BATHINDA | BATHINDA | BATHINDA | PUNJAB | L3 | Rejected-Finance Not Lowest |
Tender Value
Refer Docs
EMD Value
₹47,800
Closing Date
1 Jul 2022, 11:00 amClosed
EE Punjab W/S and Sew Board Divn No.2 Bathinda
EE Punjab W/S and Sew Board Divn No.2 Bathinda
OPERATION OF WATER SUPPLY SCHEME AND SEWERAGE SYSTEM AT NIRWANA ESTATE, PHASE 4 and 5, MILK PLANT, PUJJAN WALA MOHALLA, RAJIV GANDHI NAGAR and INDUSTRIAL FOCAL POINT BATHINDA FOR THE PERIOD OF 10 MONTHS (01.06.2022 TO 31.3.2023)
2022_DLG_87047_1
07/PWSSB D-2/BTI Dt 16-06-2022
Open Tender
Civil Works
Lump-sum
300 days
Bathinda
Please Refer Tender Documents.
2 documents required · 2 mandatory
₹1,000
₹47,800
Yes
12 Aug 2022
20 Jun 2022
1 Jul 2022
20 Jun 2022
1 Jul 2022
20 Jun 2022
Amount
OPERATION OF WATER SUPPLY SCHEME AND SEWERAGE SYSTEM AT NIRWANA ESTATE, PHASE 4& 5, MILK PLANT, PUJJAN WALA MOHALLA, RAJIV GANDHI NAGAR & INDUSTRIAL FOCAL POINT BATHINDA FOR THE PERIOD OF 10 MONTHS (01.06.2022 TO 31.3.2023)
THE AGARWAL CO OP L AND C SOCIETY LTD
THE BHAGU ROAD CO-OP L AND C SOCIETY LTD
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .