| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 CrRejected-Finance | ₹1.2 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.3 CrRejected-Finance | ₹1.3 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.4 CrRejected-Finance | ₹1.4 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹1.5 CrRejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.5 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S KAILASH NATH CHATURVEDI L3 | m/s satish chandra jaiswal L4 | GOMATINETRA CONSTRUCTIONS L5 | SRI ENTERPRISES L2 | M/S DEVENDRA KUMAR OJHA L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 2,213.97 | M3 | 58 ₹1.3 L | 55 ₹1.2 L | 56.75 ₹1.3 L | 47.05 ₹1.0 L | 41 ₹90,772.77 |
| 2.00 | Excavating sand stone by pickaxes including lift up to 1.50m and lead up to 30m with all labour, T&P etc. | 1,062.27 | M3 | 260 ₹2.8 L | 220 ₹2.3 L | 232.93 ₹2.5 L | 193.13 ₹2.1 L | 165 ₹1.8 L |
| 3.00 | E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 11,666.23 | M3 | 150 ₹17.5 L | 150 ₹17.5 L | 200.74 ₹23.4 L | 166 ₹19.4 L | 134 ₹15.6 L |
| 4.00 | Dismantling of old stone masonry with cement mortar and its disposal within 60m including all labour ,T&P etc. as per direction of Engineer-in-charge. | 9.82 | M3 | 450 ₹4,419 | 360 ₹3,535.20 | 381.15 ₹3,742.89 | 316 ₹3,103.12 | 30 ₹294.60 |
| 5.00 | Dismantling of cement base concrete including stacking of dismantled materials within 60m as per direction of Engineer –in-charge. | 10.62 | M3 | 500 ₹5,310 | 390 ₹4,141.80 | 423.5 ₹4,497.57 | 351 ₹3,727.62 | 40 ₹424.80 |
| 6.00 | Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge. | 2,419.21 | M3 | 90 ₹2.2 L | 90 ₹2.2 L | 94.86 ₹2.3 L | 78.65 ₹1.9 L | 45 ₹1.1 L |
| 7.00 | Providing and Laying LDPE Film 200 Micron below in C.C. invluding cost of all material, labour and T&P etc. for proper completion of work. | 3,060 | M2 | 39.5 ₹1.2 L | 30 ₹91,800 | 33.46 ₹1.0 L | 27.74 ₹84,884.40 | 18 ₹55,080 |
| 8.00 | Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 814.88 | M3 | 3,350 ₹27.3 L | 3,700 ₹30.2 L | 4,181.22 ₹34.1 L | 3,504 ₹28.6 L | 3,125 ₹25.5 L |
| 9.00 | C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge. | 1,268.6 | M3 | 4,100 ₹52.0 L | 4,700 ₹59.6 L | 4,505.19 ₹57.2 L | 3,735 ₹47.4 L | 3,755 ₹47.6 L |
| 10.00 | Supplying and laying Dala Stone Grit 10-20mm. for inverted filter including all type of materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 2.36 | M3 | 3,819.05 ₹9,012.96 | 3,100 ₹7,316 | 3,234.69 ₹7,633.87 | 2,682 ₹6,329.52 | 1,800 ₹4,248 |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
18 Mar 2026, 3:00 pmClosed
SE
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
Restoration and Pucca work of Itwa dy. from km 9.500 to km 15.200
2026_UPIDC_1124343_8
07/SE/2025-26
Open Tender
Civil Works
365 days
Itwa Dy
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.5 L
Yes
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
25 May 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
12 Mar 2026
E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
Excavating sand stone by pickaxes including lift up to 1.50m and lead up to 30m with all labour, T&P etc.
E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
Dismantling of old stone masonry with cement mortar and its disposal within 60m including all labour ,T&P etc. as per direction of Engineer-in-charge.
Dismantling of cement base concrete including stacking of dismantled materials within 60m as per direction of Engineer –in-charge.
Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge.
Providing and Laying LDPE Film 200 Micron below in C.C. invluding cost of all material, labour and T&P etc. for proper completion of work.
Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge.
Supplying and laying Dala Stone Grit 10-20mm. for inverted filter including all type of materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Supplying and laying Shankargarh Stone Balast 20-40mm.for inverted filter including all type of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Supplying and laying coarse sand FM>2 for inverted filter including all type of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Centering and shuttering of precast C.C. work with all labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Supplying & fixing 20mm thick joint filler board including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
S/L 3mm thick multi-plast poly Plus Tar paper including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying R.C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement pointing 1:2 C.M. including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Providing and laying C.C.(1:2:4)with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer in charge.
Dry stone boulder Pitching 200mm thick filling joint with sand including cost of labour, material, T&P etc. for proper completion of work as per direction of in- charge.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
Providing and Fixing of Steel Gate including cost of all materials labourT&P etc.
Providing and Fixing of boundary pillar along the canal every 200m interval including cost of all materia, labour and T&P etc. as per direction of Engineer in charge.
Laying precast C.C. block (450x450x225mm.) in D/S Canal Section including cost of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
S/F 75mm.dia PVC Pipe in weep hole in retaining wall and crest including cost of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
belanDOC.pdf
Tender Documents • 2.60 MB
BOQ_2095320.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid