Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical B 46 INDUSTRIAL AREA SECTOR 59 NOIDA UP 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Accepted-Technical ok |
| 2 | Accepted-Technical 16A 1 EARLE STREET FLAT N 1 FIRST FLOOR KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | Accepted-Technical ok |
| 3 | Accepted-Technical | Accepted-Technical ok |
| 4 | Accepted-Technical 807 PEARL BUSINESS PARK NETAJI SUBHASH PLACE PITAMPURA DELHI | DELHI | DELHI | Accepted-Technical ok |
| 5 | Accepted-Technical | Accepted-Technical ok |
Tender Value
Refer Docs
EMD Value
₹1.2 Cr
Closing Date
24 Oct 2025, 3:00 pmClosed
EXECUTIVE ENGINEER( C)DR-XV
EXECUTIVE ENGINEER( C)DR-XV JAL SADAN,ANNEX LAJPAT NAGAR, NEW DELHI-24
NIT No. 03 / EE(C)DR- XV (2025-26)
2025_DJB_276812_1
NIT No. 03 / EE(C)DR- XV (2025-26)
Open Tender
Composite Works
Works
5475 days
EXECUTIVE ENGINEER( C)DR-XV
Please refer Tender documents.
18 documents required · 18 mandatory
₹1,500
DJB EMD A/c No. 50448339804 at Indian Bank,
₹1.2 Cr
Office of Chief Engineer (DR)-PROJECTS-II,
16 Jan 2026
14 Aug 2025
24 Oct 2025
14 Aug 2025
24 Oct 2025
25 Aug 2025
22 Aug 2025
A) Design and Build Contract of various units for following:
A-1) Design engineering and submission of drawing for all the units (Payable as per Price schedule A1)
A-2) Capital cost for Jaffarpur 1. Sewage Pumping Station 2. Sewage treatment Plant 3. Disposal Main up to Disposal point, Including pumping station, if any
A-3) Capital cost for Khera Dabar 1. Sewage Pumping Station 2. Sewage treatment Plant 3. Disposal Main up to Disposal point, Including pumping station, if any
A-4) Capital cost for Hasanpur 1. Sewage Pumping Station 2. Sewage treatment Plant 3. Disposal Main up to Disposal point, Including pumping station, if any
A-5) Capital cost for Kazipur 1. Sewage Pumping Station 2. Sewage treatment Plant 3. Disposal Main up to Disposal point, Including pumping station, if any
B) Operation and maintenance Cost
B-1) All in all Operation and Maintenance cost for 15 years at Jaffarpur DSTP {As per Table 4}
B-2) All in all Operation and Maintenance cost for 15 years at Kheradabar DSTP {As per Table 4}
B-3) All in all Operation and Maintenance cost for 15 years at Hasanpur DSTP {As per Table 4)}
B-4) All in all Operation and Maintenance cost for 15 years at Kazipur DSTP {As per Table 4)}
C) Electricity Cost
C-1) Electricity Consumption for 15 Year (Kwh/Year) for Jaffarpur(Payable as per Table 8 )
C-2) Electricity Consumption for 15 Year (Kwh/Year) for Kheradabar(Payable as per Table 8 )
C-3) Electricity Consumption for 15 Year (Kwh/Year) for Hasanpur(Payable as per Table 8)
C-4) Electricity Consumption for 15 Year (Kwh/Year) for Kazipur(Payable as per Table 8 )
stage.html
html • 0.04 MB
tech_eval.pdf
cancelled_1.pdf
pdf • 0.31 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Volume_I.pdf
Tender Documents • 2.04 MB
Volume_VII.pdf
Tender Documents • 0.95 MB
Drawing.pdf
Tender Documents • 30.55 MB
Volume_V.pdf
Tender Documents • 0.98 MB
Volume_VI.pdf
Tender Documents • 0.84 MB
BOQ_365091.xls
BOQ • 0.35 MB
Volume_II.pdf
Tender Documents • 1.10 MB
Volume_III.pdf
Tender Documents • 1.16 MB
Volume_IV.pdf
Tender Documents • 2.42 MB
Corri6.pdf
PDF • 2.24 MB
Corr5.pdf
PDF • 0.61 MB
Corri4.pdf
PDF • 0.76 MB
Corri3-3.pdf
PDF • 0.46 MB
Corri2.pdf
PDF • 2.17 MB
Corrigendum1.pdf
PDF • 2.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .