| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance 118 NABA MAHJATI ROAD KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | +0.00% | ₹2.1 L | L1 | Admitted-Finance |
| 2 | L2₹2.1 L+₹4,861 (2.34%)Admitted-Finance 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | +2.34% | ₹2.1 L+₹4,861 (2.34%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 L+₹10,386 (5.00%)Admitted-Finance 3 1 120 ANANDA PALIT ROAD ADJACENT AREA IN WARD NO 55 | KOLKATA | WEST BENGAL | 700001 | +5.00% | ₹2.2 L+₹10,386 (5.00%) | L3 | Admitted-Finance |
Tender Value
₹2.1 L
EMD Value
₹4,200
Closing Date
17 Sept 2026, 5:00 pmClosed
E.E.-VI
1, HOGG STREET, KOLKATA-87
PAINTING OF KERB AND RESETTING OF KERB CHANNEL NEAR 139 TO 140, 48A TO 9 NO ANANDA PALIT RD, 149 AJC BOSE RD TO 16 NO CONVENT RD, CANAL ST, DEB LANE ,SAMBHU BABU LN AND DIFFERENT PLACES IN WARD NO.-55
2026_KMC_1041708_1
E.E. (C)/ VI/055/006/2026-2027/R
Open Tender
CIVIL WORKS
Percentage
40 days
WARD 55
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,200
24 Sept 2026
11 Sept 2026
19 Sept 2026
11 Sept 2026
17 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (K) PAINTING, VERNISHING ETC?(B)MISCELLANEOUS ITEMS.(6)(b) Washing & cleaning the wall surface & ceiling by soft detergent powder & soft water & render the surface free of dust, stain etc. | 1,283.4 | SQM | 8 | ₹10,267.2 |
| 2 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 8 Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor:(a) One Coat [This item to be done under specific instruction of the Superintending Engineer]N.B.:-Extra for each additional floor in external walls refer item 1 of subhead C | 1,283.4 | %SQ | 31.4 | ₹40,298.76 |
| 3 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : (ii) Two coats (white in shade) | 641.7 | SQM | 78 | ₹50,052.6 |
| 4 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : (iv) Two coats (with any shade except white) | 641.7 | SQM | 81 | ₹51,977.7 |
| 5 | Taking out stone slab of kerb & channel of road side drain and stacking as directed.b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 150 | MTR | 8.17 | ₹1,225.5 |
| 6 | Taking out stone slab of kerb & channel of road side drain and stacking as directed.a) vertical kerb stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 150 | MTR | 8.17 | ₹1,225.5 |
| 7 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2).b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ]) | 150 | MTR | 18.3 | ₹2,745 |
| 8 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2).a) Vertical Kerb ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ]) | 150 | MTR | 21.43 | ₹3,214.5 |
| 9 | Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 300mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | 50 | EA | 265.54 | ₹13,277 |
| 111 | Estimated amount | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
F5506.pdf
Tender Documents • 0.85 MB
BOQ_2557512.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .