| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ICEBERGS L2 | SPECDEL ENGINEERING PRIVATE LIMITED L1 | DD CLIMATE CONTROLS L3 |
|---|---|---|---|---|---|---|
| 0.00HVAC WORKS | ||||||
| 1.00Plate Heat Exchanger Servicing | ||||||
| 1.01Comprehensive servicing of the Plate Heat Exchanger (PHE) assembly includes complete isolation, draining, and dismantling of the plate pack using hydraulic tools; thorough mechanical and chemical cleaning of all plates; visual inspection and condition reporting; complete re-gasketing with OEM-specified glue/clip-type gaskets; re-assembly, alignment, and final torque tightening as per OEM manual; hydrostatic pressure testing at 1.5 times design pressure; functional servicing and calibration of all associated valves, inspection of the SS-302 support frame, piping connections, and expansion tank; followed by commissioning, performance validation against design approach temperature, and submission of a complete service dossier including test certificates. The costing shall include all labour, tools, chemicals, a complete set of gaskets, and consumables. | ||||||
| 1.02PHE Servicing @ VVF Block | ||||||
| 1.03 | PHE (Primary/Process Side: 310 M³/hr @ 7°C Inlet / 12°C Outlet,
Secondary/Utility Side: 240 M³/hr @ 4°C Inlet / 11.5°C Outlet) | 1 | Lot | 20,440 ₹20,440 Lowest | 31,240 ₹31,240 | 35,000 ₹35,000 |
| 1.04PHE Servicing @ QC Block | ||||||
| 1.05 | PHE (Primary/Process Side: 280 M³/hr @ 7°C Inlet / 12°C Outlet,
Secondary/Utility Side: 190 M³/hr @ 4°C Inlet / 11.5°C Outlet) | 1 | Lot | 20,440 ₹20,440 Lowest | 24,530 ₹24,530 | 35,000 ₹35,000 |
| 1.06PHE Servicing @ AR Block | ||||||
| 1.07 | PHE (Primary/Process Side: 155 M³/hr @ 7°C Inlet / 12°C Outlet,
Secondary/Utility Side: 105 M³/hr @ 4°C Inlet / 11.5°C Outlet) | 1 | Lot | 20,440 ₹20,440 Lowest | 28,620 ₹28,620 | 35,000 ₹35,000 |
| 1.08Chilled Water Manifold Valve Package Servicing | ||||||
Tender Value
₹1.8 Cr
EMD Value
₹4.6 L
Closing Date
12 Mar 2026, 3:00 pmClosed
Deputy General Manager Proc.
HLL BIOTECH LIMITED, Integrated vaccine complex, Survey no 192 195, Meleripakkam village, Chengalpattu PIN 603003
Comprehensive Maintenance, Testing, Validation and Supply Services for HVAC systems, cold rooms, door interlocks, filters and allied works at IVC facility at HLL biotech limited, Chengalpattu
2026_HBL_268296_1
HBL/HVAC1/IVC/CPT/25-26
Open Tender
Electrical Works
Item Rate
60 days
Chengalapattu
17 documents required · 17 mandatory
₹2,950
Yes
HLL Biotech Limited
₹4.6 L
Yes
ONLINE
30 Mar 2026
21 Feb 2026
13 Mar 2026
21 Feb 2026
12 Mar 2026
23 Feb 2026
25 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | HVAC WORKS | - | - | - | - |
| 1 | Plate Heat Exchanger Servicing | - | - | - | - |
| - | Comprehensive servicing of the Plate Heat Exchanger (PHE) assembly includes complete isolation, draining, and dismantling of the plate pack using hydraulic tools; thorough mechanical and chemical cleaning of all plates; visual inspection and condition reporting; complete re-gasketing with OEM-specified glue/clip-type gaskets; re-assembly, alignment, and final torque tightening as per OEM manual; hydrostatic pressure testing at 1.5 times design pressure; functional servicing and calibration of all associated valves, inspection of the SS-302 support frame, piping connections, and expansion tank; followed by commissioning, performance validation against design approach temperature, and submission of a complete service dossier including test certificates. The costing shall include all labour, tools, chemicals, a complete set of gaskets, and consumables. | - | - | - | - |
| - | PHE Servicing @ VVF Block | - | - | - | - |
| - | PHE (Primary/Process Side: 310 M³/hr @ 7°C Inlet / 12°C Outlet,
Secondary/Utility Side: 240 M³/hr @ 4°C Inlet / 11.5°C Outlet) | 1 | Lot | - | - |
| - | PHE Servicing @ QC Block | - | - | - | - |
| - | PHE (Primary/Process Side: 280 M³/hr @ 7°C Inlet / 12°C Outlet,
Secondary/Utility Side: 190 M³/hr @ 4°C Inlet / 11.5°C Outlet) | 1 | Lot | - | - |
| - | PHE Servicing @ AR Block | - | - | - | - |
| - | PHE (Primary/Process Side: 155 M³/hr @ 7°C Inlet / 12°C Outlet,
Secondary/Utility Side: 105 M³/hr @ 4°C Inlet / 11.5°C Outlet) | 1 | Lot | - | - |
| - | Chilled Water Manifold Valve Package Servicing | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.66 MB
TEDOHVAC.pdf
Tender Documents • 0.65 MB
BOQ_312233.xls
BOQ • 0.40 MB
DATEEXTN2HVAC.pdf
PDF • 0.11 MB
DATEEXTNHVAC.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].