Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC Awarded | |
| 2 | L2₹2.5 L+₹47,033.14 (23.5%)Rejected-Finance | L2 | Rejected-Finance Rejected |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
1 Oct 2020, 3:00 pmClosed
EE PHED-2 Sirsa
Sirsa
Drilling, installation and development of One No. Cavity Tubewell of 150mm dia upto a depth of 122 meters B.G.L., Taking out old materials from existing tubewell and re-loweing in new tubewell at village Sakkar Khera and all other works contingent
2020_HRY_144200_2
SE No.9816 dated 14.09.2020
Open Limited
Civil Works
Works
30 days
Sakar Khera
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EE PHED-2 Sirsa
₹3,000
Yes
23 Oct 2020
25 Sept 2020
1 Oct 2020
25 Sept 2020
1 Oct 2020
25 Sept 2020
Amount
N.S. Item
Drilling of bore 150mm dia bore by mechanical means in all kinds of soils including cost of all stablilzing material, transportation of rig and contingent equipment to the site of works including cost of casing pipe while boring and extracting the same against earth frictions etc. complete to the satisfaction of the Engineer-in-Charge.
Supplying & lowering of 150mm o/d PVC rigid housing pipe as per ISI marked 10 kg pressure of standard length with required number of socket with inside thread to match the pipe threads in to borehole in vertical position including cost of all scaffolding, derricks, Jim, poles, tools and plants, ropes, gays M.S. Clamp embedded in foundation etc. complete in all respects to the satisfaction of the Engineer-in-Charge of the work including cost of all cutting, threading of pipe, where required and all socket.
Supplying & lowering of 150mm o/d PVC rigid housing Filter pipe with plastic Jali around Filter pipe Tripple Layer as per ISI marked 12 kg pressure of standard length with required number of socket with inside thread to match the pipe threads in to borehole in vertical position including cost of all scaffolding, derricks, Jim, poles, tools and plants, ropes, gays M.S. Clamp embedded in foundation etc. complete in all respects to the satisfaction of the Engineer-in-Charge of the work including cost of all cutting, threading of pipe, where required and all socket.
Supplying & Lowering of 63mm i/d PVC pipe 10 Kg. pressure ISI make complete in all respects to the Satisfaction of Engineer-In-Charge of work.
Providing and Fixing of Iron Piece (Cutter) for fitting at PVC Rigid pipe
Providing and Fixing of 6" i/d MS Rest piece complete in all respects
Providing and Fixing of 2.5' long x 6" inner dia (i.e. Safty of PVC Rigid pipe)
Development of Tubewell by Submersible Pumping Set 1991 (Part-I) as amended upto date and specification attached and as directed by the Engineer-in-Charge of the work including the cost of all consumeable stores, fuel, oil, Generator Set Pumps and Machinery etc. as required of this work.
Job work for Taking out old pumping machinery from abandoned tubewell & relowering in tubewell complete in all respects
Bidder Name
Amount
The Bharokhan Vikas Coop L/C Socs. Ltd.
JASDWANT SINGH
The Bharokhan Vikas Coop L/C Socs. Ltd.
The Bharokhan Vikas Coop L/C Socs. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .