Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.7 LAccepted-AOC AHROLA NAWAGI JUNAWAI GUNNAUR DISTT SAMBHAL | GUNNAUR | SAMBHAL | ₹32.7 L | L1 | Accepted-AOC PRADEEP KUMAR CONTRACTOR |
| 2 | L2₹32.9 LRejected-Finance | ₹32.9 L | L2 | Rejected-Finance 2 |
Tender Value
₹33.4 L
EMD Value
₹3.3 L
Closing Date
27 Jan 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer, CD-2, PWD, Budaun.
Repair of Bridge on Soat River In Budaun Bijnour Road to Bhatri Goverdhanpur Wazirganj Road (ODR) Km 10 in financial Year 2025-26
2026_CEBLY_1107611_1
71(2)/Nivida(E.T)/2026 Date 12.01.2026
Open Tender
Civil Works - Bridges
60 days
CD-2 PWD Budaun
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹3.3 L
Yes
Budaun
26 Feb 2026
20 Jan 2026
27 Jan 2026
20 Jan 2026
27 Jan 2026
20 Jan 2026
21 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Executive Engineer, CD-2, PWD, Budaun.
Name of Work: Repair of Bridge on Soat River In Budaun Bijnour Road to Bhatri Goverdhanpur Wazirganj Road (ODR) Km 10 in financial Year 2025-26.
Contract No: - 71(2)/ Nivida(E-T.)/ 2025 Date :12.01.2026
Sl. No. Item Description (Excluding G.S.T.) Item Code / Make Quantity Units Estimated Rate UNIT Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Dismantling of Reinforced cement concrete including stacking of material as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet) (Ch. No. 17 Sr. No. 694) cum Excess(+) Full Conversion INR
2 Construction of granular sub-base by providing coarse graded Material , spreading in uniform layers with motor grador on prepared surface mixing by mix in place method with fornt and loader at OMC and compacting with vibratory roller to achieve the desired density, for proper completion of the work as per MORT&H specifications clause 4.01 (401B) cum Excess(+) Full Conversion INR INR Ninety Four Thousand Five Hundred Only
3 R.C.C. work in M-30 in approach Slab with cement, approved coarse sand & 2cm. Guage well gradge grift including necessary shurting, placing and fixing of reinforcement including in binding with wire but excluding cost of reinforcement and also including supply of all metarials labour T& P etc required for proper completion of the work as per direction of Enigneer in charge. cum Excess(+) Full Conversion INR INR One Lakh Seventy Four Thousand Three Hundred Only
4 Supplying, Fitting and Placing HYSD bar Rainforced cement inSuperstructure complete as per Drawing and Technical Specification. Tonne Excess(+) Full Conversion INR INR One Lakh Forty Two Thousand Only
5 Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Carted Earth upto 1 Km) cum Excess(+) Full Conversion INR INR Three Lakh Thirty Thousand Only
6 Providing and laying filter material undermeath pitching in slopes complete as per drawing and technical specification. cum Excess(+) Full Conversion INR INR Four Lakh Sixty Four Thousand Only
7 Providing and laying pitching on slopes laid over prepared filter media including boulder pron laid dry in front of toe of embankment complete as per drawing and technical specification cum Excess(+) Full Conversion INR INR Fifteen Lakh Seventy Five Thousand Only
8 Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 Rm Excess(+) Full Conversion INR INR Ninety Three Thousand Only
9 Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. Sqm Excess(+) Full Conversion INR INR One Lakh Thirteen Thousand Three Hundred Only
10 Earth work in Excavation for structure as per drawing and technical specification Clause 305.1 including seting out, construction of shoring and bracing, removal of stumps and other deleterious materail and dispoal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. cum Excess(+) Full Conversion INR INR Four Thousand Two Hundred & Ninety Only
11 Providing concrete for plain/reinforced concrete (1:3:6) in open foundations complete as per drawings and technical specification Clause 802,803,1202,1203. cum Excess(+) Full Conversion INR INR Seventy Two Thousand Four Hundred & Fifty Only
12 Brick masonary work in cement mortar (1:3 cement coarse sand) in foundation complete excluding pointing and plastring as per drawing and technical specifications Clause 600,1202,1203. cum Excess(+) Full Conversion INR INR One Lakh Fifty Three Thousand Six Hundred Only
13 Plastring with cement mortar (1:3) 15 mm thick on brickwork in substructure as per technical specification clauses 613.4,1204 Sqm Excess(+) Full Conversion INR INR Twenty Two Thousand Four Hundred & Twenty Only
14 PCC Grade M 30 using batching plant & manual placing. cum Excess(+) Full Conversion INR INR Twenty Three Thousand Two Hundred & Forty Only
Total in Figures INR Thirty Two Lakh Eighty Seven Thousand Three Hundred Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.61 MB
BOQ_2044202.xls
BOQ • 0.28 MB
T1_2.pdf
Tender Documents • 2.05 MB
Download all tender documents and submit your bid