Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-Finance CHENNAI | CHENNAI | CHENNAI | TAMIL NADU | L1 | Accepted-Finance Qualified in the Technical Evaluation | |
| 2 | L2₹20.6 L+₹83,621.35 (4.24%)Accepted-Finance | L2 | Accepted-Finance Qualified in the Technical Evaluation |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
21 Apr 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Block Development officer VP
Panchayat union office Chithamur
Consturction 6 Work in Porur Panchayat chithamur Union
2023_RDTN_302413_1
2310/2021/A9 dt2202.2023
Open Tender
Civil Works
Item Rate
180 days
Chithamur
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹20,000
Yes
16 Jun 2023
15 Apr 2023
21 Apr 2023
15 Apr 2023
21 Apr 2023
15 Apr 2023
Amount
Part-I: Construction of Rcc Slab Culvert in Porur Colony School Street @ Porur Panchayat chithamur Union in Chengalpattu District for the year 2022-23 Having Package NO: 20/ 2022-23. Estimate Amount : Rs.2.50 Lakhs
Earth work Excvation in all cluase of soil with lintel lead lift as per SS20B including all materilas to site etc
C.C. 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc., complete
Cement Concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and coveyance.
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Cement Concrete 1:2:4 Mix using 20mm ISS HBG metal including cost and coveyance.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Part-II: Construction of Rcc Slab Culvert in Porur Colony murugan koil Street @ Porur Panchayat chithamur Union in Chengalpattu District for the year 2022-23 Having Package NO: 20/ 2022-23. Estimate Amount : Rs.2.50 Lakhs
Earth work Excvation in all cluase of soil with lintel lead lift as per SS20B including all materilas to site etc
C.C. 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc., complete
Cement Concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and coveyance.
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Cement Concrete 1:2:4 Mix using 20mm ISS HBG metal including cost and coveyance.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Part-III: Construction of Rcc Slab Culvert in Porur Colony Ambethkar Street @ Porur Panchayat chithamur Union in Chengalpattu District for the year 2022-23 Having Package NO: 20/ 2022-23. Estimate Amount : Rs.2.50 Lakhs
Earth work Excvation in all cluase of soil with lintel lead lift as per SS20B including all materilas to site etc
C.C. 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc., complete
Cement Concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and coveyance.
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Cement Concrete 1:2:4 Mix using 20mm ISS HBG metal including cost and coveyance.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Part-IV: Construction of Rcc Slab Culvert in Porur Colony M.V.Nagar @ Porur Panchayat chithamur Union in Chengalpattu District for the year 2022-23 Having Package NO: 20/ 2022-23. Estimate Amount : Rs.2.50 Lakhs
Earth work Excvation in all cluase of soil with lintel lead lift as per SS20B including all materilas to site etc
C.C. 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc., complete
Cement Concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and coveyance.
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Cement Concrete 1:2:4 Mix using 20mm ISS HBG metal including cost and coveyance.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Part-V: Providing WBM Road to Porur Colony M.V.Nagar @ Porur Panchayat chithamur Union in Chengalpattu District for the year 2022-23 Having Package NO: 20/ 2022-23. Estimate Amount : Rs.5.00 Lakhs
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Part-Vi: Construction of Draining in Porur Colony Nadu street @ Porur Panchayat chithamur Union in Chengalpattu District for the year 2022-23 Having Package NO: 20/ 2022-23. Estimate Amount : Rs.5.00 Lakhs
Earth work Excvation in all cluase of soil with lintel lead lift as per SS20B including all materilas to site etc
C.C. 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc., complete
Supply and erecting centering for all concrete items of works including cost and conveyance all materials to site all charges etc.complete
Cement Concrete 1:2:4 Mix using 20mm ISS HBG metal including cost and coveyance.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
N.ANJALIDEVI
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .