Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.6 LAccepted-AOC 268 237 MASTER KANHAIYA LAL ROAD AISHBAGH AISHBAGH LUCKNOW UTTAR PRADESH 226004 UDYAM UP 50 0018557 | LUCKNOW | UTTAR PRADESH | 226004 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹24.0 L+₹35,297.96 (1.50%)Rejected-Finance VPO SULTANPUR TEHSIL AND DISTT KULLU HP 175101 | KULLU | KULLU | HIMACHAL PRADESH | 175101 | L2 | Rejected-Finance High rate |
Tender Value
Refer Docs
EMD Value
₹45,213
Closing Date
19 Mar 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist
9th Floor, Kendriya Bhawan, Sector-H, Aliganj, Lucknow
As per tender documents
2021_ASI_620834_1
5-3/715/20-21-LKO-III-C
Open Tender
Civil Works
Works
120 days
Lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹45,213
Yes
Lucknow
30 Mar 2021
5 Mar 2021
22 Mar 2021
5 Mar 2021
19 Mar 2021
5 Mar 2021
5 Mar 2021 - 8 Mar 2021
8 Mar 2021
120 days
Amount
Execution of work
Erection of scaffolding with the help of M.S. Iron pipe ,clamp, base plate, joint pin & nut bolts etc. and removing after execution of work including supply of required materials/labours etc.
Dismantling of brick work in lime/cement mortar including stacking and disposal of refuse as directed by Engineer-in-charge
Plain lakhauri brick masonry in walls as per original pattern in the mortar of ratio 1:1:1 (1 Lime:1 Surkhi:1Coarse sand) mixed bailgiri, dry gum and molassis (gur/sheera) etc. including supply of all materials, labours, T&P required for proper completion of work.
Moulded lakhauri brick masonry work as per original pattern in arches, miniature domes etc. with mortar of ratio 1:1:1(1 Lime:1Surkhi:1 Coarse Sand) mixed with bailgiri, gum, molassis (gur/sheera) etc. including supply of all materials, labours, T&P etc. required for proper completion of work .
Providing and fixing of salwood beam size (5.30MX0.30MX0.20M) at proper place including supply of all materials, labours, T&P etc. required for proper completion of work .
Providing and fixing of stone bracket, size 1.4MX0.60MX0.04M for chajja, matching with existing including supply of all materials, labours, T&P etc. required for proper completion of work.
Providing and fixing of stone chajja size 1.65M wide with lime mortar as per existing including supply of all materials, labours, T&P etc. required for proper completion of work.
Providing and fixing of M.S. Girder, size 200mmx100mmx5300mm for support to slab, parapet wall etc. including supply of all materials, labours, T&P etc. required for proper completion of work.
Restoration of broken cornice by using of special size, bricks/lakhauri bricks in the mortar of ratio 1:1:1 (1 Lime:1 Surkhi:1Coarse sand) mixed bailgiri, dry gum and molassis (gur/sheera) etc. including supply of all materials, labours, T&P required for proper completion of work.
Grouting and filling of cracks with lime mortar of ratio 1:1:1 (1 Lime:1 Surkhi:1Coarse sand) mixed bailgiri, dry gum and molassis (gur/sheera) etc. including supply of all materials, labours, T&P required for proper completion of work.
Moulded lime plaster of thickness 25 mm to 40 mm in the mortar of ratio 1:1:1 (1Lime:1 Coarse sand:1 Surkhi) mixed with bailgiri, gum, molassis(gur/sheera) etc. matching as per original including supply of all materials, labours, T&P etc. required for proper completion of work .
Richly carved lime plaster of thickness 40 mm to 60 mm with ornamental floral stucco design work in the mortar of ratio 1:1:1 (1Lime:1 Coarse sand:1 Surkhi) mixed with bailgiri, gum, molassis(gur/sheera) etc. matching as per original including supply of all materials, labours, T&P etc. required for proper completion of work .
Reinforced brick work with mortar of ratio 1:3 (1 Cement: 3 Coarse Sand) and 0.8% mild steel used including supply of all materials, labours for proper completion of work.
Removal/disposal of refuse (dismantled unserviceable materials) malba, garbage etc. from site/monument to out of municipal area as directed by Engineer-in-charge.
DREAM CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .