Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC HOUSE NO 535 SECTOR 18 HUDA KAITHAL 136027 | KAITHAL | KAITHAL | HARYANA | 136027 | ₹2.1 Cr | L1 | Accepted-AOC Agreement Done |
| Sl No | Description | Qty | Unit | M/s Swami Ji Construction Co. L1 |
|---|---|---|---|---|
| 1.00NS Items | ||||
| 1.01 | S/o and C/o stone boulders of requisite size from approved quarry to site of work as per PWD specification No. 3.31 read with 23.8 and 23.9 loading, unloading and stacking as per recommended committee rates for the year 2025-26 for Distt. Ambala, Panchkula, Kurukshetra and Kaithal. | 7,824.38 | cum | 2,050 ₹1.6 Cr |
Tender Value
₹1.9 Cr
EMD Value
₹3.7 L
Closing Date
24 Mar 2026, 11:00 amClosed
GURVINDER SINGH
Kaithal W.S Divn. Kaithal
Estimate for stone stening of Ghaggar River at lengthof 960 ft. in U/S of village Rattakhera Lukman
2026_HRY_509041_1
20262D90D155 69F1 4E23 89D5 71D9F98F11F9113IRR
Open Tender
Civil Works
90 days
BHATIAN CHANCHAK DUSERPUR HANSU MAJRA HEMU MAJ
Estimate for stone stening of Ghaggar River at lengthof 960 ft. in U/S of village Rattakhera Lukman
3 documents required · 3 mandatory
₹15,000
₹3.7 L
Yes
11 May 2026
17 Mar 2026
24 Mar 2026
17 Mar 2026
24 Mar 2026
17 Mar 2026
NS Items
S/o and C/o stone boulders of requisite size from approved quarry to site of work as per PWD specification No. 3.31 read with 23.8 and 23.9 loading, unloading and stacking as per recommended committee rates for the year 2025-26 for Distt. Ambala, Panchkula, Kurukshetra and Kaithal.
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
HSR Items
[16.29]Weaving wire-netting for wire crates, including binding sides, and partition to make crate of 15 cm x 15 cm, or 25 cm x 7.5 cm mesh by mechanical/ mannual means. [Through Rate]
[16.32]Filing stones or spalls into crates, and hand-packing by mechanical/ mannual means. [Through Rate]
[2.B0046] B0046. Hard drawn steel wire [Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_587817.xls
BOQ • 0.29 MB
AD0153860.pdf
Additional Documents • 0.26 MB
OT0153860.pdf
Other Document • 0.50 MB
Download all tender documents and submit your bid