Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Closing Date
25 Nov 2026, 10:30 am7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
CONSIGNEE
Not Applicable
60 days
Expenditure
General
96
5 conditions · 1 needing a document upload
Supply should be as per tender specification
Ambiguous offers like Unbranded products, as per tender, any good make,etc and specifications not confirming with bid parameters, etc will be summarily rejected. Bidders to clearly provide the make and model of the offer,failing which offer may not be considered.
Bidders are required to upload all relevant documents in support of their offer at the time of submission of bid. No new document(s) shall be accepted after opening of tender. All required documents in support of eligibility, technical compliance, past performance, financial capability, or any other tender condition must be submitted along with the bid.Only clarifications, if sought by purchaser,shall be limited to the documents already submitted and shall not involve submission of any fresh document having a bearing on eligibility or evaluation. In case of non-submission of required documents with the bid, the offer is liable to be rejected.
Any ambiguity or clarification regarding specification/drawing shall be sought before closing of tender. No post-tender or post-placement of order clarification will be entertained and supply shall be strictly as per purchase order, failing which action including cancellation at firm risk and cost may be taken.
Railway reserves the right to procure bulk quantity on proven sources with satisfactory past performance forsame or similar Wheel Iron Skids , Specification for wheel Skid for use of Indian Railway BG Stock.The tenderer must have supplied the same/similar items to this Railway or any other zonal railways production units. Documentary evidence (such as R/ Notes, RITES Inspection Certificate etc.,) must be furnished along with the offer evidencing the execution of such purchase orders. The tenderer with satisfactory past performance as mentioned above for supply of the same/similar items during the last three years prior to and excluding tender opening date may be considered (as responsive to S.Rly requirements)for placement of bulk and regular order.
34 conditions
Have you furnished the statement of deviations.[preferably nil]
Have you submitted authenticated copy of the document authorizing the signatory to submit offer and commit on behalf of tenderers.
Have you kept your offer valid for 60 days.
Have you attached any performance statements with your offer? For proof of supply to other railways / production units copy of Purchase Order, Inspection certificate and receipt note / certificate must be uploaded. Non submission of such vital documents may be taken as their not having any such past performance.
Have you checked our website before submitting offer, whether any corrigendum to the tender has been issued or not.
IN CASE OF ROAD DELIVERY THE DATE OF DELIVERY AT DESTINATION CONSIGNEE'S END) SHALL ONLY BE TREATED AS DELIVERY DATE IRRESPECTIVE OF 'FOR / F O T 'CONDITION MENTIONED ELSEWHERE IN THE CONTRACT/TENDER
THE BIDDER CONFIRMS THAT RATE AND OTHER FINANCIAL TERMS QUOTED IN RELEVANT COLUMNS OF FINANCIAL BID WILL ONLY BE RULING TERMS FOR ACCEPTANCE,AND SUCH TERMS QUOTED ANYWHERE ELSE SHOULD BE IGNORED.
[a] All the bidders/tenderers should ensure that they are GST compliant and their quoted tax structure/rates are as per the GST Law. Firms must indicate its GST registration number along with their offer. [b] In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGSTAct,The Railway shall deduct the applicable GST from his/their bills under Reverse Charge Mechanism (RCM) and deposit the same to the concerned tax authority. [c] The firm should indicate the tariff code (HSN Code) for claiming GST for the tendered item.[d] The offer shall be evaluated based on the GST rate as quoted by each bidder and same will be used for determining the inter-se ranking.While submitting offer, it shall be the responsibility of the bidder to ensure that they quote correct GST rate and HSN number. [e] It shall be the responsibility of the bidders to quote correct HSN number and corresponding GST rate.The Purchaser shall not be responsible for any misclassification of HSN number or incorrect GST rate, if quoted by the bidder. [f] wherever, the successful bidder invoices the goods at GST rate or HSN number which is different from that incorporated in the Purchase order,payment shall be made as per GST rate which is lower of the GST rate incorporated in the Purchase order or billed. [g] Vendor is informed that she/he would be required to adjust her/his basic price to the extent required by higher tax bill as per invoice to match the Al linclusive Price as mentioned in the Purchase order.
Latest Public Procurement policy for MSEs amendment order 2018 and revision thereof is applicable.
Please enter the percentage of local content in the material being offered.please enter 0 for fully imported items,and 100 for fully indigenous items.The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1 location across Tamil Nadu · 50 Numbers total
Wheel Iron Skids
96265942~SR
96265942
Limited - Indigenous
Goods
Tirunelveli, Tamil Nadu
₹0
Exempted
10 Nov 2026
10 Nov 2026
1 item · 50 Numbers total
Wheel Iron Skids. Specifcation for wheel Skid for use of Indian Railway BG Stock as per RDSO drawing no TFC/SPEC/374/SKID dated 26.09.2013 or latest. The manufacturer shall supply the certificate of test and examination carried out by Govt. owned lab or NABL approved lab [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/AC LOCO/TRIP SHED/TEN, SR | Tamil Nadu | 50.00 Numbers |
| Total | 50 Numbers | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5439065.pdf
ATTACHMENT
5960724.pdf
ATTACHMENT
5814033.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .