| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-AOC | ₹16.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.6 L+₹93,181 (5.58%)Rejected-AOC | ₹17.6 L+₹93,181 (5.58%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | A N KANNAN L2 | M VIJEYARAMAN L1 |
|---|---|---|---|---|---|
| 1.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only MDU-CORP-BUILDING DATA-P-3- | 216.5 | M2 | 1,065.4 ₹2,30,659.1 | 1,008.9 ₹2,18,426.85 Lowest |
| 2.01 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete MDU-CORP-BUILDING DATA-P-3- | 51 | M3 | 8,953.3 ₹4,56,618.3 | 8,478.5 ₹4,32,403.5 Lowest |
| 3.01 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. MDU-CORP-BUILDING DATA-P-6- | 8,925 | Kg | 85.6 ₹7,63,980 | 81.1 ₹7,23,817.5 Lowest |
| 4.01 | Hire Charges for Telescopic Crane etc., Complete | 4 | Hrs | 10,841.6 ₹43,366.4 | 10,266.7 ₹41,066.8 Lowest |
| 5.01 | Add GST 18% | 1 | GST | 2,69,127.8 ₹2,69,127.8 | 2,54,855.9 ₹2,54,855.9 Lowest |
Tender Value
₹19.7 L
EMD Value
₹19,653
Closing Date
5 Aug 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Providing Deck Slab Arrangement at Panagal Salai Channel In Ward No 30
2026_MAWS_686135_1
E4/ EST NO 1 /26-27
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹19,653
31 Aug 2026
20 Jul 2026
5 Aug 2026
20 Jul 2026
5 Aug 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only MDU-CORP-BUILDING DATA-P-3- | 216.5 | M2 | - | - |
| 2.01 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete MDU-CORP-BUILDING DATA-P-3- | 51 | M3 | - | - |
| 3.01 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. MDU-CORP-BUILDING DATA-P-6- | 8,925 | Kg | - | - |
| 4.01 | Hire Charges for Telescopic Crane etc., Complete | 4 | Hrs | - | - |
| 5.01 | Add GST 18% | 1 | GST | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_824787.xls
BOQ • 0.23 MB
udoc.pdf
Tender Documents • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .