Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC ASANSOL BARDHAMAN 713301 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713301 | L1 | Accepted-AOC Successful L1 bidder | |
| 2 | L2₹9.2 L+₹32,269.92 (3.64%)Rejected-Finance PASCHIM BARDHAMAN BARDHAMAN 713359 WEST BENGAL INDIA | PASCHIM BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | L2 | Rejected-Finance As not L1 bidder | |
| 3 | L3₹9.6 L+₹70,484.64 (7.94%)Rejected-Finance CHITTARANJAN ROAD NEAMATPUR PO SITARAMPUR | CHITTARANJAN | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | L3 | Rejected-Finance As not L1 bidder |
Tender Value
₹10.5 L
EMD Value
₹13,100
Closing Date
8 Jul 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
A.E.(EandM), Salanpur Area
Office of the GM, Salanpur Area, Lalganj, Asansol.
Supply and Installation of pipeline work for mine water utilization, including pipes and fitting at Mohanur Colliery under Salanpur Area.
2024_ECL_311373_1
SLN/GM/EandM/E-Tender/24-25/06 Dt.-25/06/2024
Open Tender
Miscellaneous Works
Item Rate
21 days
Salanpur Area
Please refer Tender documents.
10 documents required · 10 mandatory
₹13,100
19 Aug 2024
28 Jun 2024
9 Jul 2024
28 Jun 2024
8 Jul 2024
28 Jun 2024
28 Jun 2024 - 2 Jul 2024
Amount
Supply of MS 4" dia Pipe
Supply of 6" dia M.S. Flange
Supply of 4" dia M.S. Flange
Supply of 6" MS band
Supply of 4" MS band
Supply of MS Washer 5/8
M.S. 5/8 x 2" Nut-Bolt
M.S. 5/8 x 1 1/2" Nut-Bolt
RI Cloth
Supply of Welding Rod
Supply of Cutter blade
Hire charges for welding machine
Hire charges for cutter machine
Old and damaged 6" dia Pipe collection from Mohanpur OCP different site of mines - 1200 mtr.
M.S. 6" dia full band 20 nos. cutting and 40 nos. half band making 80 nos. flange welding.
M.S. Tea making 6 Nos. for smoothly laying 6" dia delivery into the pond.
Reducing socket making 4" x 6" - 4 nos. and 4" T - 2 nos.
M.S. 6" dia Flange welding for new pipe and old pipe for making welding short flange quantity 400 nos inner and outside welding
M.S. 4" dia flange welding new pipe and making short piece 84 pic.
Carrying and laying and joining 1200 mtr. 6" dia pipe and MS 6" dia band and short pice amdia gorai para and sharma village pond and for filling mine row water.
Carrying and laying and joining 350 mtr. 4" dia MS pipeline discharging point to Bauri para pond for filing mine row water.
Carrying and laying 450 mtr MS 6" dia pipeline Pahargora village ponds for filling mine row water.
Add: Provident fund on Labour cost
Total impact of GST for the purpose of CTC
NEW SANTI CONSTRUCTION
MAJI ENTERPRISE
techsummary_322679.pdf
PDF • 1.72 MB
finsummary_322679.pdf
PDF • 1.72 MB
WorkOrder.pdf
PDF • 0.66 MB
finance_322679.pdf
PDF • 0.25 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .