| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹3.3 L (3.04%)Admitted-Finance PLOT NO 102 H NO 21 1382 102 GROUND FLOOOR SAMATHA NAGAR COLONY OLD SAFILGUDA ROAD NO 3 HYDERABAD RANGAREDDI TELANGANA 500056 | HYDERABAD | TELANGANA | 500056 | ₹1.1 Cr+₹3.3 L (3.04%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹18.4 L (16.9%)Admitted-Finance | ₹1.3 Cr+₹18.4 L (16.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S B.SHRAVAN KUMAR L1 | Dwarka Pershad Radhey Ramanlal L3 | Squad 7 Projects and Services Pvt Ltd L2 |
|---|---|---|---|---|---|---|
| 1.00Schedule 'A' Part - I (BUILDINGS AND STRUCTURES) This Schedule (contains under mentioned Sl. item No. 1.01) is not prepriced by MES and the prepriced rate indicated in Col - 5 as `0.00 indicates this fact only.The tenderer is required to quote their rates in Column 6. | ||||||
| 1.01 | Construction of Examination hall with RCC framed structure with permanent specifications, ATT, WPT by APP etc complete all as shown on drawings and as per specification. | 1 | EACH BLOCK | 75,00,000 ₹75,00,000 Lowest | 80,52,000 ₹80,52,000 | 75,43,088 ₹75,43,088 |
| 2.00 | Lump sum price worked out by the Contractor for “EXCAVATION, EARTH WORK AND SITE CLEARANCE” as listed in Schedule ‘A’ Part - II representing _______ % ______________ percent Above / Below the lump sum price of ₹ 3,20,515.92 inserted by the MES in Schedule ‘A’ Part - II | 1 | JOB | 3,20,600 ₹3,20,600 | 2,72,438.53 ₹2,72,438.53 Lowest | 3,20,515.92 ₹3,20,515.92 |
| 3.00 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION ” as listed in Schedule ‘A’ Part - III representing __________ % ____________ percent Above / Below the lump sum price of ₹ 3,05,357.97 inserted by the MES in Schedule ‘A’ Part - III | 1 | JOB | 3,05,400 ₹3,05,400 | 3,51,161.67 ₹3,51,161.67 | 3,05,357.97 ₹3,05,357.97 Lowest |
| 4.00 | Lump sum price worked out by the Contractor for “ INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - IV representing __________ % ___________ percent Above / Below the lump sum price of ₹ 14471.27 inserted by the MES in Schedule ‘A’ Part - IV | 1 | JOB | 15,000 ₹15,000 | 18,378.51 ₹18,378.51 | 14,471.27 ₹14,471.27 Lowest |
| 5.00 | Lump sum price worked out by the Contractor for “ ROAD/PAVEMENT/HARD STANDING ” as listed in Schedule ‘A’ Part - V representing __________ % ___________ percent Above / Below the lump sum price of ₹ 741116.29 inserted by the MES in Schedule ‘A’ Part - V | 1 | JOB | 75,000 ₹75,000 Lowest | 8,74,517.22 ₹8,74,517.22 | 7,41,116.29 ₹7,41,116.29 |
| 6.00 | Lump sum price worked out by the Contractor for “ SEWAGE DISPOSAL ” as listed in Schedule ‘A’ Part - VI representing ___________ % _________________ percent Above / Below the lump sum price of
₹ 866929.96 inserted by the MES in Schedule ‘A’ Part - VI | 1 | JOB | 8,67,000 ₹8,67,000 | 11,70,355.45 ₹11,70,355.45 | 8,66,929.96 ₹8,66,929.96 Lowest |
| 7.00 | Lump sum price worked out by the Contractor for “ AREA DRAINAGE” as listed in Schedule ‘A’ Part - VII representing ______ % _________________ percent Above / Below the lump sum price of ₹ 559820.01 inserted by the MES in Schedule ‘A’ Part - VII | 1 | JOB | 5,60,000 ₹5,60,000 | 7,61,355.21 ₹7,61,355.21 | 5,59,820 ₹5,59,820 Lowest |
| 8.00 | Lump sum price worked out by the Contractor for "RCC RETAINING WALL” as listed in Schedule ‘A’ Part - VIII representing _______ % __________________ percent Above / Below the lump sum price of ₹ 100887.80 inserted by the MES in Schedule ‘A’ Part - VIII | 1 | JOB | 1,01,000 ₹1,01,000 | 1,19,047.6 ₹1,19,047.6 | 1,00,887.8 ₹1,00,887.8 Lowest |
| 9.00 | Lump sum price worked out by the Contractor for "RAIN WATER HARVESTING” as listed in Schedule ‘A’ Part - IX representing _______ % __________________ percent Above / Below the lump sum price of
₹ 11050.85 inserted by the MES in Schedule ‘A’ Part - IX | 1 | JOB | 11,100 ₹11,100 | 14,366.1 ₹14,366.1 | 11,050.85 ₹11,050.85 Lowest |
Tender Value
₹1.2 Cr
EMD Value
₹2 L
Closing Date
27 Jul 2026, 6:00 pmClosed
CWE (Army) Secunderabad
Commander Works Engineers Mudfort, MES Office Complex Secunderabad-500 003
CONSTRUCTION OF EXAMINATION HALL FOR TRAINEES AT NO 2 TRAINING BATTALION OF AOC CENTRE UNDER GE(SOUTH) SECUNDERABAD.
2026_MES_771062_1
82144
Open Tender
Civil Works
Lump-sum
Secunderabad
as per NIT
7 documents required · 7 mandatory
₹1,000
GE(SOUTH) SECUNDERABAD
₹2 L
Yes
8 Aug 2026
10 Jun 2026
3 Aug 2026
10 Jun 2026
27 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule 'A' Part - I (BUILDINGS AND STRUCTURES) This Schedule (contains under mentioned Sl. item No. 1.01) is not prepriced by MES and the prepriced rate indicated in Col - 5 as `0.00 indicates this fact only.The tenderer is required to quote their rates in Column 6. | |||||
| 1.01 | Construction of Examination hall with RCC framed structure with permanent specifications, ATT, WPT by APP etc complete all as shown on drawings and as per specification. | 1 | EACH BLOCK | - | - |
| - | Lump sum price worked out by the Contractor for “EXCAVATION, EARTH WORK AND SITE CLEARANCE” as listed in Schedule ‘A’ Part - II representing _______ % ______________ percent Above / Below the lump sum price of ₹ 3,20,515.92 inserted by the MES in Schedule ‘A’ Part - II | 1 | JOB | 3,20,515.92 | ₹3,20,515.92 |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION ” as listed in Schedule ‘A’ Part - III representing __________ % ____________ percent Above / Below the lump sum price of ₹ 3,05,357.97 inserted by the MES in Schedule ‘A’ Part - III | 1 | JOB | 3,05,357.97 | ₹3,05,357.97 |
| 4 | Lump sum price worked out by the Contractor for “ INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - IV representing __________ % ___________ percent Above / Below the lump sum price of ₹ 14471.27 inserted by the MES in Schedule ‘A’ Part - IV | 1 | JOB | 14,471.27 | ₹14,471.27 |
| 5 | Lump sum price worked out by the Contractor for “ ROAD/PAVEMENT/HARD STANDING ” as listed in Schedule ‘A’ Part - V representing __________ % ___________ percent Above / Below the lump sum price of ₹ 741116.29 inserted by the MES in Schedule ‘A’ Part - V | 1 | JOB | 7,41,116.29 | ₹7,41,116.29 |
| 6 | Lump sum price worked out by the Contractor for “ SEWAGE DISPOSAL ” as listed in Schedule ‘A’ Part - VI representing ___________ % _________________ percent Above / Below the lump sum price of
₹ 866929.96 inserted by the MES in Schedule ‘A’ Part - VI | 1 | JOB | 8,66,929.96 | ₹8,66,929.96 |
| - | Lump sum price worked out by the Contractor for “ AREA DRAINAGE” as listed in Schedule ‘A’ Part - VII representing ______ % _________________ percent Above / Below the lump sum price of ₹ 559820.01 inserted by the MES in Schedule ‘A’ Part - VII | 1 | JOB | 5,59,820.01 | ₹5,59,820.01 |
| 8 | Lump sum price worked out by the Contractor for "RCC RETAINING WALL” as listed in Schedule ‘A’ Part - VIII representing _______ % __________________ percent Above / Below the lump sum price of ₹ 100887.80 inserted by the MES in Schedule ‘A’ Part - VIII | 1 | JOB | 1,00,887.8 | ₹1,00,887.8 |
| 9 | Lump sum price worked out by the Contractor for "RAIN WATER HARVESTING” as listed in Schedule ‘A’ Part - IX representing _______ % __________________ percent Above / Below the lump sum price of
₹ 11050.85 inserted by the MES in Schedule ‘A’ Part - IX | 1 | JOB | 11,050.85 | ₹11,050.85 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_863466.xls
BOQ • 0.27 MB
Tender82144merged.pdf
Tender Documents • 2.13 MB
Drawings.pdf
Additional Documents • 13.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .