Tender Value
₹1.2 Cr
EMD Value
₹2 L
Closing Date
15 Jul 2026, 6:00 pm
Similar tender results from the same govt authority in the past 3 years.
CWE (Army) Secunderabad
Commander Works Engineers Mudfort, MES Office Complex Secunderabad-500 003
CONSTRUCTION OF EXAMINATION HALL FOR TRAINEES AT NO 2 TRAINING BATTALION OF AOC CENTRE UNDER GE(SOUTH) SECUNDERABAD.
2026_MES_771062_1
82144
Open Tender
Civil Works
Secunderabad
as per NIT
7 documents required · 7 mandatory
₹1,000
GE(SOUTH) SECUNDERABAD
₹2 L
Yes
10 Jun 2026
10 Jun 2026
22 Jul 2026
10 Jun 2026
15 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule 'A' Part - I (BUILDINGS AND STRUCTURES) This Schedule (contains under mentioned Sl. item No. 1.01) is not prepriced by MES and the prepriced rate indicated in Col - 5 as `0.00 indicates this fact only.The tenderer is required to quote their rates in Column 6. | |||||
| 1.01 | Construction of Examination hall with RCC framed structure with permanent specifications, ATT, WPT by APP etc complete all as shown on drawings and as per specification. | 1 | EACH BLOCK | - | - |
Lump sum price worked out by the Contractor for “EXCAVATION, EARTH WORK AND SITE CLEARANCE” as listed in Schedule ‘A’ Part - II representing _______ % ______________ percent Above / Below the lump sum price of ₹ 3,20,515.92 inserted by the MES in Schedule ‘A’ Part - II | 1 | JOB | 3,20,515.92 | ₹3,20,515.92 | |
Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION ” as listed in Schedule ‘A’ Part - III representing __________ % ____________ percent Above / Below the lump sum price of ₹ 3,05,357.97 inserted by the MES in Schedule ‘A’ Part - III | 1 | JOB | 3,05,357.97 | ₹3,05,357.97 | |
| 4 | Lump sum price worked out by the Contractor for “ INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - IV representing __________ % ___________ percent Above / Below the lump sum price of ₹ 14471.27 inserted by the MES in Schedule ‘A’ Part - IV | 1 | JOB | 14,471.27 | ₹14,471.27 |
| 5 | Lump sum price worked out by the Contractor for “ ROAD/PAVEMENT/HARD STANDING ” as listed in Schedule ‘A’ Part - V representing __________ % ___________ percent Above / Below the lump sum price of ₹ 741116.29 inserted by the MES in Schedule ‘A’ Part - V | 1 | JOB | 7,41,116.29 | ₹7,41,116.29 |
| 6 | Lump sum price worked out by the Contractor for “ SEWAGE DISPOSAL ” as listed in Schedule ‘A’ Part - VI representing ___________ % _________________ percent Above / Below the lump sum price of
₹ 866929.96 inserted by the MES in Schedule ‘A’ Part - VI | 1 | JOB | 8,66,929.96 | ₹8,66,929.96 |
Lump sum price worked out by the Contractor for “ AREA DRAINAGE” as listed in Schedule ‘A’ Part - VII representing ______ % _________________ percent Above / Below the lump sum price of ₹ 559820.01 inserted by the MES in Schedule ‘A’ Part - VII | 1 | JOB | 5,59,820.01 | ₹5,59,820.01 | |
| 8 | Lump sum price worked out by the Contractor for "RCC RETAINING WALL” as listed in Schedule ‘A’ Part - VIII representing _______ % __________________ percent Above / Below the lump sum price of ₹ 100887.80 inserted by the MES in Schedule ‘A’ Part - VIII | 1 | JOB | 1,00,887.8 | ₹1,00,887.8 |
| 9 | Lump sum price worked out by the Contractor for "RAIN WATER HARVESTING” as listed in Schedule ‘A’ Part - IX representing _______ % __________________ percent Above / Below the lump sum price of
₹ 11050.85 inserted by the MES in Schedule ‘A’ Part - IX | 1 | JOB | 11,050.85 | ₹11,050.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_863466.xls
BOQ • 0.27 MB
Tender82144merged.pdf
Tender Documents • 2.13 MB
Drawings.pdf
Additional Documents • 13.48 MB
Download all tender documents and submit your bid