Tender Value
₹13.6 L
EMD Value
₹27,226
Closing Date
8 Oct 2026, 6:00 pm
EE/PHED/DD-II/KPG/GTA
OFFICE OF THE EXECUTIVE ENGINEER,ABOVE NOVELTY CINEMA HALL, KALIMPONG.
Recovery and Reconstruction of PWS Scheme for Uneak Khola to Dabling, Block-II, Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).
2026_GTA_5075150_1
EE/PHED/DD-II/eNIT -26/KPG/GTA/2026-27
Open Tender
CIVIL WORKS
Percentage
90 days
Kalimpong
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹27,226
Yes
24 Sept 2026
24 Sept 2026
12 Oct 2026
24 Sept 2026
8 Oct 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, removing, spreading or stacking of spoils within a lead of 75 m. as directed and including trimming the sides of the trenches,
leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . Distribution Tank | 24.84 | cum | 119.27 | ₹2,962.67 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 8.28 | cum | 77.54 | ₹642.03 |
| 3 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth. N.B Distribution Tank | 50.88 | sqm | 64 | ₹3,256.32 |
| 4 | Supply of stone boulder (N.B. variety) of approved quarries above 150 mm to 200 mm dia size. | 6.42 | cum | 1,272 | ₹8,166.24 |
| 5 | Cement concrete (1:3:6) with 40 mm down graded stone metal excluding shuttering with N.B variety stone metal. Distribution Tank | 1.09 | cum | 5,971.2 | ₹6,508.61 |
| 6 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 320 Kg of cement with super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture] M25 ii) N.B. variety Distribution Tank | 8.86 | cum | 8,187.2 | ₹72,538.59 |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. (i) Tor steel/Mild steel. SAIL/TATA/RINL Distribution Tank | 1.35 | MT | 79,822.8 | ₹1,07,760.78 |
| 8 | Hire and labour charge for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams,columns, lintels curved or staight including fitting fixing and striking out after complection of works. (upto roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. . | 173.85 | sqm | 400.8 | ₹69,679.08 |
| 9 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement. 25 mm.thick plaster. Distribution Tank | 6.25 | sqm | 348 | ₹2,175 |
| 10 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor).[Excluding cost of chipping over concrete surface]. (iii) with 1:4 cement mortar. 20 mm.thick plaster. Distribution Tank | 61.82 | sqm | 247.2 | ₹15,281.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_5164170.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .