All Bids
RequiredCopy of Registration Certificate with contractor signature
RequiredCopy of Latest IT Returns and Pan Card.
RequiredCopy of GST Registration.
RequiredCopy of Annual turnover Certificate of last five financial years issued by CA.
RequiredThe agency has to upload works on hand, if any discrepancies found in statement, the contractor will be imposed ban / suspension to participating in further tenders.
RequiredThe agency should upload mobile no. and e-mail ID and current address for ready correspondence.
RequiredPayments will be done as per seniority of the bill submitted and will be subject to the existence of adequate funds within the relevant head of account. Agency shall not request for priority payment in any case. Any such requests by the agencies will not be entertained by GHMC.
RequiredAgencies shall not depend on payment of part bills to ensure completion of work on timely basis. Hence the agency shall not stop or slow down the work citing delays in payment of part bills.
RequiredFor all works costing Rs.20.00 Lakhs and below, there shall be only one bill i.e., first and final bill. No running account bills shall be paid to the agencies by GHMC in any circumstance.
RequiredViolation of any of the above special conditions will make the agency liable for being recommended for demolition to a lower class / suspension of business / removal from approved list as per GOs in vogue.
RequiredThe agency declaration genuineness of certificate must be uploaded on Non-Judicial Rs.100.00 stamp paper.
RequiredBidder enclose ISO 9001-2015, ISO 14001-2015, ISO 45001-2018 Certificate
Requiredsports related average Turnover of Rs.10.00 Cr and above for last 3 years related to
RequiredPositive networth & profit for last 3 years
RequiredNon-Blacklisting affidavit
RequiredBidders offer is liable to be rejected if they dont upload any of the certificates / documents sought in the bid document, ATC and corrigendum if any.
RequiredData sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data sheet with the products specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection.
RequiredUpon mandatory site visit bidder should submit their site survey facility layout plan / proposal and attach the same in the ATC.
RequiredBidder enclosed the Vigilance pledge certificate.
RequiredOEM authorization for the same.
RequiredAfter allotment of work, the work must be complete within 15 days of time.