| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.4 LAccepted-AOC 1 RAMGANJ CHOTTA IMAMBADA RANIBAZAR GONDA UTTAR PRADESH 271002 UDYAM UP 31 0005563 | GONDA | UTTAR PRADESH | 271002 | ₹43.4 L | L1 | Accepted-AOC AOC |
| 2 | L2₹44.2 LRejected-Finance | ₹44.2 L | L2 | Rejected-Finance NOT ADMITTED |
| 3 | L3₹44.9 LRejected-Finance | ₹44.9 L | L3 | Rejected-Finance NOT ADMITTED |
| 4 | L3₹48.0 LRejected-Finance UTTAR PRADESH UP | AGRA | UTTAR PRADESH | 283110 | ₹48.0 L | L3 | Rejected-Finance NOT ADMITTED |
| 5 | L4₹48.7 LRejected-Finance | ₹48.7 L | L4 | Rejected-Finance NOT ADMITTED |
Tender Value
₹80.3 L
EMD Value
₹6.0 L
Closing Date
25 Mar 2026, 12:00 pmClosed
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
Construction of Kurni Se Gopalpatti Anusuchit Basti Link Road in Distt. Jaunpur
2026_CEUVZ_1128049_3
1105/SETender/jnp-gzp circle/25 Date-28-02-2026
Open Tender
Civil Works
120 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.0 L
Yes
25 May 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Embankment with Material Obtained from R.O.W. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Including All material T&P, Labour cess etc But Excluding cost of GST | |||||
| 2Providing, laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base (CTSB) Including All material T&P, Labour cess etc But Excluding cost of GST | |||||
| 3Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on preared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achive the desired denisty, complete as per Technical Specification clause 401. Including All material T&P, Labour cess etc But Excluding cost of GST | |||||
| 4Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base (CTB) .Including All material T&P, Labour cess etc But Excluding cost of GST | |||||
| 5Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. Including All material T&P, Labour cess etc But Excluding cost of GST and Bitumen | |||||
| 6Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Including All material T&P, Labour cess etc But Excluding cost of GST and Emulsion | |||||
| 7Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Including All material T&P, Labour cess etc But Excluding cost of GST and Emulsion | |||||
| 8Construction of subgrade & earthen shoulder with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including All material T&P, Labour cess etc But Excluding cost of GST | |||||
| 9PART A Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 | |||||
| 9.1 | 1st year- maintainance cost 0% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | - | Km | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.59 MB
Tendernotice_2.pdf
PDF • 1.30 MB
BOQ_2104022.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid