| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC KAMBAINALLUR | KAMBAINALLUR | DHARMAPURI | TAMIL NADU | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.8 L+₹43,810.69 (4.67%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹9.5 L
EMD Value
₹9,500
Closing Date
22 Apr 2025, 3:00 pmClosed
Block Development Officer(VP), Kadathur
Block Development Officer(VP), Kadathur
Improvement to Burial Ground waiting shed, Compound wall (20.50m), CC Pavement at Gopichettipalayam H/O Gopichettipalayam
2025_RDTN_542900_1
Roc.No.4077/2024/E2 P08-AGAMT-II-2025-26
Open Tender
Civil Works
Item Rate
90 days
Block Development Office, Kadathur
Can be seen in the Tender Documents
2 documents required · 2 mandatory
₹0
₹9,500
30 May 2025
10 Apr 2025
22 Apr 2025
10 Apr 2025
22 Apr 2025
10 Apr 2025
Amount
Improvement to Burial Ground waiting shed, compound wall (20.50m), CC Pavement at Gopichettipalayam H/O Gopichettipalayam
I. Waiting Shed
1. Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth
2. Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
3. Cement mortar 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
4. Brick work in CM 1:5 mix using New Country Bricks including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
5. CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 5 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete
6. CENTERING ABOVE GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 6 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
7. Supply and erecting of Steel including all charges
8. Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance 8 of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
9. Plastering in CM 1:3 mix using 10mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
10. Plastering in CM 1:5 mix using 12mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
11. Weathering Course with Brick jelly lime concrete 20mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
12. Pressed tiles with Brick jelly lime concrete 20mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
13. Granolethic floor finish in CM 1:2:4 mix using 10-12m thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
14. Painting Two Coat of New Plastered wall surface with ready mixed plastic emulsion including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
15. Provision for Bitumen Pad
II. Construction of Compound wall
1. Earthwork Excavation in Hard Soil-Earthwork excavating and depositing with in initial lead of 10m and lift of 2m
2. Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
3. Brick work in CM 1:5 mix using New Country Bricks including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
4. CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 4 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
5. CENTERING ABOVE GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
6. Supplying and fabrication of steel including cost and conveyance of steel to site and all labour 6 charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
7. Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
8. Plastering in CM 1:5 mix using 12mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
9. Painting Two Coat of New Plastered wall surface with ready mixed plastic emulsion including 9 cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
III. Providing CC Pavement
1. Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m
2. Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
3. CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel 3 angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
4. Cement concrete 1:3:6 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
5. Cement concrete 1:2:4 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
6. Provision For Bitumen Pad
Provision for Name Board
Provision for QC Charges 0.5 %
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P.SELVARAJ (BID ID -1310076)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .