| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹6.1 L+₹8,100 (1.34%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.1 L
EMD Value
₹6,500
Closing Date
5 Aug 2024, 5:00 pmClosed
Superintending Engineer
edc Sonabhadra
Electrical work
2024_PVVNV_938969_1
29/edc(so)/2024-25
Open Tender
Electrical Works
Item Rate
90 days
sonbhadra
Pleased Ref Tender Doc.
2 documents required · 2 mandatory
₹1,180
SE EDC SONEBHADRA Bank A/c No.089105000853
₹6,500
4 Sept 2024
17 Jul 2024
6 Aug 2024
17 Jul 2024
5 Aug 2024
17 Jul 2024
Amount
CENTRALIZED MATERIALS,Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 50 Km.)
PCC Pole 11 Mtr Long
MS Channal 125x65x1300 Sq MM (T-off)
11 KV Pin Insulator With Pin
11 KV Disc Insulator with Fitting
ACSR Weasal conductor
LT AB Cable 3x50+1x35+1x16 SQ MM
11 KV V-type Cross Arm
11 KV V-type Steel Arm
SMC Box (LT Distribution Box )
MS Top Channel With Nut/Bolt
MS Dropper Channel
Stay Complete
MS Angle T/F Base
Earthing Complete
Cross bracing MS Angle (50x50x6) with Clamp
10 KVA T/F
25 KVA T/F
DE-CENTRALIZED MATERIALS, Provided Contractor
Barbed Wire
X-Arm Holding Clamp with Nut&Bolt
F-Bracket
Danger Board with Nut&Bolt
Stone Pad (300x300x75) MM
Nut & Bolt With Washear
Clamp for T/F
All Type Clamp
Clamp for LT
Top, T-Off Cross Bracing Angle Clamp With Nut & Bolt
Work of following materials as Per RESSPO/PuVVNL norms at the work site.
Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Stay Complete, Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing Complete
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of WEASEL Conductor, binding with insulators & jumpering.
Errection of LT AB Cable 3x50+1x35+1x16 SQ MM
INSTALATION OF SMC Box (LT Distribution Box )
INSTALATION OF 10 KVA TRANSFORMER ON SUBSTATION BASE
INSTALATION OF 25 KVA TRANSFORMER ON SUBSTATION BASE
Barbed Wire
X-Arm Holding Clamp with Nut&Bolt
F-Bracket
Danger Board with Nut&Bolt
Stone Pad (300x300x75) MM
Nut & Bolt With Washear
Clamp for T/F
All Type Clamp
Clamp for LT
Top, T-Off Cross Bracing Angle Clamp With Nut & Bolt
TRIDEV INFRACON
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .