Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-Finance | L1 | Accepted-Finance Financial Qualified | |
| 2 | L2₹11.1 L+₹18,586.69 (1.70%)Accepted-Finance AMBEDKAR PURAM 6 140 AWAS VIKAS SECTOT 6 KANPUR NAGAR | L2 | Accepted-Finance Financial Qualified | |
| 3 | L3₹12.3 L+₹1.4 L (12.4%)Accepted-Finance | L3 | Accepted-Finance Financial Qualified |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
19 Mar 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Lower Ganga Canal
Reconstruction of V.R.B. on GAMHARI DY. At KM 0.197
2021_UPIDC_568552_2
E-Tender/06/LGC/2020-21
Open Tender
Civil Works
Item Rate
120 days
Fatehpur
Reconstruction of V.R.B. on GAMHARI DY. At KM 0.197
2 documents required · 2 mandatory
₹590
Executice Engineer Lower Ganga Canal Fatehpur
₹1.3 L
Yes
20 Mar 2021
12 Mar 2021
19 Mar 2021
12 Mar 2021
19 Mar 2021
12 Mar 2021
120 days
Amount
(A) Dismantling brick work in lime or cement morter including stacking of material as directed by engineer In charge within distance of 60 m.
Brick work
C.C. work
Execavation of foundation including in all type of soil including lift up to 1.5m. And lead up to 30m. Including, filling watering ramming of excaveted of earth in to the space and side of the foundation of trenches as directed by engineer in charge up to distance of 30 m.
Laying C.C 1:3:6 in foundation with 20 to 40 mm size stone ballast inculiding 3m. Lift and lead up to 60m.with cost of all material labour and T&P etc.
M-150 class brick work in 1:4 cement and coarse sand Mortar including cost of all material labour T&P etc.
Centering & shuttering for RCC work including cost of material labour and T&P etc
Cutting, bending, binding & placing of reinforcement including cost of steel, labour & T&P etc complete
R.C.C. work 1:1.5:3 with 10-20 mm size stone grit incl. all cost of labour, material & T&P etc but execluding cost of rainforcement centring and shuttring
C.C. 1:1:2 in wearing coat with 10-20 mm size stone grit including cost of all material and labour T&P etc. as per direction of ingineer In charge
Struck cement pointing on brick masonary with lift up to 3m. And lead up to 60 m. including cast of all material labour T&P etc as per direction of engineerIn charge
Finishing wall with water proof cement paint of approved make & quality on new work with two coats including complete material labour T&P etc. required for proper completion of work.
Earth work in Road Diversion/By pass & Ramp's with it's manual compection, drassing including all lead and lift as per direction of engineer In charge
(A) Making Road Diversion & Ramp
Earth work in Ramp's and canal section with it's manual compection, drassing including all lead and lift as per diecetion of engineer in charge
Brick soling on edge including filing joint's with earth and praprition of subgrade as per direction of engineer In charge with cost of all material labour & T&P
Hiring 5HP diesal pump including opertor and pol.
S/F Tar felt sheet between slab & Bed Block as per direction of engineer In charge including cost of all material labour & T&P
Supply and fixing Angle Iron 50x50x5 on joint as per direction of engineer In charge including cost of all material labour & T&P
M/S VINOD KUMAR
M/S RAKESH SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .