Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.5 LAccepted-AOC | L1 | Accepted-AOC DUE To L1 | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
14 Oct 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE IWC MIRZAPUR
SE IWC MIRZAPUR IRRIGATION COLONY FATHA MIRZAPUR
Reconstruction of fall at km 3.00,km3.250,km 3.400,Repairing of fall km2.4,km2.7,km3.7, km4.0 and Reconstruction head regulator of sirsiya mr.
2022_UPIDC_731628_5
NIT05/SE/2022-23
Open Tender
Civil Works
Item Rate
90 days
SONEBHADRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.1 L
19 Nov 2022
7 Oct 2022
14 Oct 2022
7 Oct 2022
14 Oct 2022
7 Oct 2022
Amount
Dismantling Brick work or stone work in lime or cement mortar including stacking of materials as directed by engg. in-charge within a distance of 60 mt.
E/W Excavation of Foundation in ordinary soil/sandy loam, clay or sand, soil mixed with boulder/ set slush in canal section including lift upto 1.5 m. & lead upto 30 m with disposal of excavation earth as directed by Engg-in-charge.
Preparation of subgrade for lining work excuding cost of earth work including cost of all material, labour, T&P, Taxes etc. required for proper completion of work.
Sand filling work in foundation bellow C.C.base including cost of all material labour ,T&P etc.required.
P/L 100 mm thick Kattal in filter in bed and slope with cost of material, labour, T&P, Taxes etc. required for proper completion of work.
P/L 100 mm thick Kattal in filter in bed and slope with cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying C.C. (1:3:6) in foundation with cement, course sand and hard stonee ballast including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying R.R. stonee masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying C.R. stone masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.(lining work)
Cement sand (1:2) pointing on stonee masonery including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying CC (1:2:4) for slab and wearing coat work with cement, course sand FM not less than 2.0 and hard stonee grit 4.75 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Providing shuttering and centering work for different parts of structure including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying RCC (1:1.5:3) for slab and wearing coat work with cement, course sand FM not less than 2.0 and hard stonee grit 4.75 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Carriage, cutting, bending, binding & placing of steel reinforcement and binding wire including all cost of material, labour, T&P, Taxes etc. but excluding cost of binding wire, required for proper completion of work.
Laying and fixing of joint filler board 18 mm thick including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
fabrication erection of MS Gate
E/w for canal section and in back filling of walls with a total lead upto 1.0 km. by truck or tractor trolley including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .