| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹2.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.6 CrRejected-AOC | ₹2.6 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Malaiarasan.V L2 | Gopi S L1 |
|---|---|---|---|---|---|
| 1.01Upgradation the road from Sennalure to Padipallam road 0/0-2/800 | |||||
| 1.02Clearing the scrub jungles including all labour charges for all labour charges etc complete. | |||||
| 1.03 | in Km. 0/0 - 1/0 | 2,400 | Sqm | 15 ₹36,000 | 5.2 ₹12,480 |
| 1.04 | in Km. 1/0 - 2/00 | 2,400 | Sqm | 15 ₹36,000 | 5.2 ₹12,480 |
| 1.05 | in Km. 2/0 - 2/750 | 1,800 | Sqm | 15 ₹27,000 | 5.2 ₹9,360 |
| 1.06Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br | |||||
| 1.07 | in Km. 0/0 - 1/0 | 711.93 | Sqm | 300 ₹2.1 L | 140 ₹99,670.20 |
| 1.08 | in Km. 1/0 - 2/00 | 708.4 | Sqm | 300 ₹2.1 L | 140 ₹99,176 |
| 1.09 | in Km. 2/0 - 2/750 | 536.83 | Sqm | 300 ₹1.6 L | 140 ₹75,156.20 |
| 1.10Collection and Supply of Carted Earth from 1Km Lead including all charges | |||||
Tender Value
₹2.8 Cr
EMD Value
₹2.8 L
Closing Date
20 Feb 2026, 3:00 pmClosed
The Additional Collector
DRDA, VILUPPURAM
TNVPM/NABARD/26-27/28
2026_RDTN_656513_28
TNVPM/NABARD/26-27
Open Tender
Civil Works
180 days
Viluppuram District
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.8 L
Yes
16 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
Upgradation the road from Sennalure to Padipallam road 0/0-2/800
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br
Collection and Supply of Carted Earth from 1Km Lead including all charges
Construction of Supplying of girrty gravel from approved quarry including cost and conveyence of all materials to site including all labour as per specification and compation with power roller etc., complete for (Shoulders)
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision of 15 nos of rumble strips covered with premix bituminous carpet, 15 - 20 mm high at centre, 250 mm wide placed at 1 m center-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Provision for Metal Crash Barrier all charges Type "A" Double Guard CH : 1/265
Provision for KM stone
Provision for HM stone
Provision for Road Marker /road stud with Lens Reflector
Provision for Awarness Board
Provision for sign board charges
Construction of 1.50m span RCC slab Culvert @ CH 204
Dismantling Existing Cement Concrete Material
Dismantling Existing Brick or Masonry Work
Dismantling Existing Surface Clearing Away from Site
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Supply and Filling Msand including all charges
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below sill level
Above sill level
Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete.
Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Provision for Bitumen pads
Provision for fixing Tar Paper for bearing
Provision for the wheep holes
Supply and Filling Gravel including cost and Conveyence of all charges
Construction of 1.50m span RCC slab Culvert @ CH 628
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Supply and Filling Msand including all charges
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below sill level
Above sill level
Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete.
Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Provision for Bitumen pads
Provision for fixing Tar Paper for bearing
Provision for the wheep holes
Supply and Filling Gravel including cost and Conveyence of all charges
Construction of 1.50m span RCC slab Culvert @ CH 1739
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Supply and Filling Msand including all charges
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below sill level
Above sill level
Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete.
Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Provision for Bitumen pads
Provision for fixing Tar Paper for bearing
Provision for the wheep holes
Supply and Filling Gravel including cost and Conveyence of all charges
Construction of 2.00m span RCC slab Culvert @ CH 1618
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Supply and Filling Msand including all charges
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below sill level
Above sill level
Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete.
Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Provision for Bitumen pads
Provision for fixing Tar Paper for bearing
Provision for the wheep holes
Supply and Filling Gravel including cost and Conveyence of all charges
Construction of 2.00m span RCC slab Culvert @ CH 1800
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Supply and Filling Msand including all charges
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below sill level
Above sill level
Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete.
Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Provision for Bitumen pads
Provision for fixing Tar Paper for bearing
Provision for the wheep holes
Supply and Filling Gravel including cost and Conveyence of all charges
Construction of 3.00m span RCC slab Culvert @ ch 2055
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Supply and Filling Msand including all charges
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below sill level
Above sill level
Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete.
Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Provision for Bitumen pads
Provision for fixing Tar Paper for bearing
Provision for the wheep holes
Supply and Filling Gravel including cost and Conveyence of all charges
Construction of 5.00m span RCC slab Culvert @ CH 1460
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below sill level
Above sill level
Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete.
Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete Clause 1002,1010 and 1202.
Provision for Bitumen pads
Provision for the wheep holes
Supply and Filling Gravel including cost and Conveyence of all charges
Construction of Retainingwall CH 1193-1268
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Supply and Filling Msand including all charges
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below sill level
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Provision for the wheep holes
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
28.pdf
Tender Documents • 1.02 MB
BOQ_788419.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid