Tender Value
₹4.8 Cr
EMD Value
₹9.5 L
Closing Date
1 Nov 2019, 5:00 pmClosed
J K Mohanty,Executive Engineer,PRD,PPT
J K Mohanty,Executive Engineer,PRD,PPT
Construction of 4-Lane road from L and T Junction at Fishery Harbour Road to Gate No.1
2019_MoS_510076_1
CE/PRD/ACCTS-03/19/401
Open Tender
Civil Works
Works
10 days
Paradip
Refer Tender Document and e-TCN
3 documents required · 3 mandatory
₹5,000
Yes
As per Tender Document and e-TCN
₹9.5 L
Yes
13 Jan 2020
10 Oct 2019
4 Nov 2019
10 Oct 2019
1 Nov 2019
10 Oct 2019
Amount
Cleaning of shrub jungles including cutting, uprooting of small bushes, removal of unsuitable materials like wood pieces, concrete blocks etc. from the ROW and disposing the same at the designated place with lead of 500mtr and initial lift with supply of all labours, T&P, machineries, operators, helpers, POL, lubricants, all taxes, port entry fees etc. all complete excluding GST as directed by the Engineer-in-Charge.
Preparation of base for embankment in water logged areas by removing of loose slushy soil upto 1m. depth as required and disposing the slushy soil upto a distance of 500m with supply of all labours, T&P, machineries, operators, helpers, POL, lubricants, all taxes, port entry fees etc. all complete excluding GST as directed by the Engineer-in-charge.
Supplying of bamboo jafree up to 1.50m height form the required ground level with supply of bamboo for bracing and bullah 100mm to 125mm dia for a length of 3.00mtr. etc. all complete with cost of all material, labour for fixing, transportation, staging, T&P, taxes, port entry fees etc. all complete excluding GST as directed by Engineer-in-Charge.
Earthwork excavation in foundations/ road embankment in all kind of soils inclusive of all lead, lift, descent, dressing to dimensions and disposal of surplus earth at a designated location by loading at one end and unloading at other end with supply of all labours, T&P, machineries, operators, helpers, POL, lubricants, all taxes, port entry fees etc. all complete excluding GST as directed by the Engineer-in-Charge.
Shoring and shuttering for foundation work for preventing the collapse in horizontal / vertical / angled way with supply of all materials, labour, T&P, transportation, staging, taxes, port entry fees etc. all complete excluding GST as directed by Engineer in charge.
Dewatering at work site by providing required capacity of dewatering pump sets attached with suction and delivery pipes with cost of fuel, operator, watch and ward, transportation charges, including all cost of running and hire charges of pump sets, all taxes, port entry fees etc. all complete excluding GST as directed by Engineer in charge .
Back filling in foundation trenches by using the excavated material by the side of drain & culvert as per requirement within initial lead and lift, leveling, dressing, watering, compacting by any approved means with cost of all labour, T&P, transportation, hire and running charges of all equipment / machineries, POL, all taxes, port entry fees etc all complete excluding GST as directed by Engineer-in-Charge.
Filling of Road embankment to the required level with sea sand within a lead of 8km (avg.) by private trucks. The rate shall include excavation from within Port area including loading & unloading, placing, spreading, watering, compacting in layers not exceeding 300mm thick by Vibratory Road roller of minimum 8 to 10 Ton static weight for both dry and wet rolling, trimming and dressing to shape as per drawing including setting out work and survey, with all lead, lift, all testing charges, engagements and machineries, operation charges, POL, lubricants, port entry fees etc all complete excluding GST as directed by the Engineer-in-Charge. N.B.: 10% voids will be deducted from the measured quantity.
Supplying of sweet earth, loading at one end and unloading at road site, spreading the same in shoulder and side slope of the road, dressing, leveling in proper slope as per drawing, breaking the clods to minimum 5cm to 7cm size, removing the roots plants, rolling, compacting by any approved means with supply of all materials, labours, T&P, taxes, tollage, royalties, port entry fees, all testing charges, hire and running charges of machineries, operation charges, etc all complete excluding GST as directed by Engineer-in-Charge. N.B.: 20% voids will be deducted from the measured quantity.
Collecting, Conveying, Supplying and transportation of Quarry Dust of approved quality, conveying the same by private Trucks including loading, unloading, spreading quarry dust over the surface in layers including watering, ramming, consolidating, compacting by smooth wheeled Vibratory Road Roller of minimum 8 to 10 Ton static weight to the satisfaction of Engineer with supply of all labour, T&P, royalties, taxes, hire and running charges of all equipment, port entry fees, operators expenses, cost of water, fuel, etc all complete excluding GST as directed by the Engineer in charge.
Collecting, Conveying, Supplying and Spreading, IRC Grade-I metal of approved quality over the prepared sub-base in suitable layers, filling the interstices with required quarry dust as per MoRTH specification, maintaining required slope and level, compacting by smooth wheeled Vibratory Road Roller of minimum 8 to 10 Ton static weight for both Dry and Wet rolling to the satisfaction of Engineer including supply of all materials, labour, T&P, transportation, charges, engagement, hire and running charges of all equipments, machineries, operation cost, water sprinkling, royalties, taxes, port entry fees, all testing charges etc. all complete excluding GST as directed by the Engineer-in-Charge. N.B.: The spreading layers should be maintained as per MORTH specification.
Collecting, Conveying, Supplying and Spreading, IRC Grade-II metal of approved quality and filling the interstices with required quarry dust as per MoRTH specification, laying over the compacted Gr-I surface to required slope, compacting by Vibratory Road Roller including supply of all materials, labour, T&P, transportation charges, engagement, hire and running charges of all equipments, machineries, operation cost, water sprinkling, royalties, taxes, Port entry fees, all testing charges etc. all complete excluding GST and as directed by the Engineer-in-Charge. N.B.: The spreading layers should be maintained as per MORTH specification.
PCC (1:4:8) ( 1 cement: 4 coarse sand: 8 graded stone metal of 40mm nominal size crusher broken of approved quality) in foundation etc. including mixing, hoisting and laying the concrete in layers in position, consolidating, curing with supply of all materials, labour, T&P, taxes, tollage, water charges, transportation, royalties, port entry fees etc. all complete, excluding GST as directed by Engineer-in-charge.
RCC (M-20) of approved quality for RCC culvert and drain work including mixing, hoisting and laying the concrete in position, finished smooth to the exposed surface, consolidating with vibrator where found necessary, curing, etc. all complete excluding cost of centering and shuttering and steel with supply of all materials, labour, T&P, taxes, tollage, royalties, all testing charges, transportation, water charges, port entry fees etc. complete, excluding GST in all respect as directed by Engineer-in-charge.
Supplying, cutting, straightening, bending, binding and placing in position the reinforcement bars of Fe500 confirming to I.S. specifications of SAIL/TISCON/RINL or of any approved make with supply of binding wire of 18 to 20mm. gauge with supply of all labour, materials, T&P, taxes, tollage, port entry fees, all testing charges, etc. all complete excluding GST as directed by Engineer-in-charge. NB: (i) No wastage shall be paid. (ii) Steel coefficient shall be considered as per IS 1786 for payment purpose with bar bending schedule.
Supplying, transporting, collecting and laying of approved quality inter locking precast Cement Concrete factory made / plant made Paver Blocks of M-50 grade, 100mm thick of required shape, size, design, conveying the same by private trucks with all leads including loading at one end and unloading at other end, on the proposed road over 50mm (Avg.) thick compacted bed of sand, compacting and proper embedding / laying of inter locking paver blocks over the sand bedding layer by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand including cost of paver blocks, all materials, labour, taxes, T&P, port entry fees, operator, hire and running charges of equipment / machineries, curing, cost of sand bedding, water, fuel, lubricant, all testing charges etc. all complete excluding GST as directed by Engineer-In-Charge. N.B.:(i) No damaged paver blocks shall be paid. (ii) Payment shall be released after achievement of designed strength in the Laboratory as per relevant IS Code.
Providing rigid, smooth, leak proof good quality centering & shuttering with formworks made out of new ply / Steel shutters, providing openings on walls as per requirement, maintaining proper alignment etc. in both horizontal and vertical plane, chipping & coaltaring after each use of shuttering materials, dismantling the same after stripping off period including supply of all materials, labour, T&P, tollage, all transportation charges, staging, scaffolding, royalties, all taxes, port entry fees etc all complete excluding GST as directed by the Engineer in charge.
For Foundation and Plinth
For RCC
For RCC(Wall)
For RCC (Slab)
Bidyadhar Swain
M/s.BASUDEV CONSTRUCTION
NKS CONSTRUCTION AND ENGINEERS PVT LTD
Ms Gangadhar Jena
M/S BHAIRAB CHARAN SWAIN
stage.html
html • 0.04 MB
techsummary_534109.pdf
BOQ Comparative Chart
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .