Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | ₹4.2 L | L1 | Admitted-Finance |
| 2 | L2₹6.2 L+₹2.1 L (49.5%)Admitted-Finance | ₹6.2 L+₹2.1 L (49.5%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical SANAT NAGAR SRINAGAR PIN 190005 J K | SRINAGAR | JAMMU AND KASHMIR | 190005 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | North Sun Enterprises L2 | Competent Engineering Works L1 |
|---|---|---|---|---|---|
| 1.00 | Loading of the 1.6 MVA Transformer with the help of heavy-duty crane and platform and then shifting the transformer to the workshop for repairing. The job includes unloading of the transformer at the Workshop. | 1 | Job | 19,500 ₹19,500 | 16,000 ₹16,000 Lowest |
| 2.00 | Labour Charges Opening of transformer unloading from platform, De tanking of complete core coil assembly the job includes complete assembling of the transformer after carrying out the necessary repairs. | 1 | Job | 50,000 ₹50,000 | 11,000 ₹11,000 Lowest |
| 3.00 | Providing and fitting of Complete HT Busing including metal parts, washers, Bushing clamps, washers & arching horns. | 3 | Job | 6,500 ₹19,500 | 2,300 ₹6,900 Lowest |
| 4.00 | Complete servicing of OLTC by way of replacement of damaged roller contacts, spring, gear etc. | 1 | Job | 1,15,000 ₹1,15,000 | 30,000 ₹30,000 Lowest |
| 5.00 | Fixing of HT Coil of R Phase found in short condition, the job involves very high technical experts and precision opening & fixing back of damaged winding disc in the coil. | 1 | Job | 22,500 ₹22,500 | 16,000 ₹16,000 Lowest |
| 6.00 | Fresh Delta Connection required on HT Side, the job also includes brazing HT Metal Parts & Frame setup. | 1 | Job | 9,500 ₹9,500 | 5,000 ₹5,000 Lowest |
| 7.00 | Hot oil bath of complete Core Coil Assy. before shifting for Heat Treatment. The job includes heat treatment of complete core coil assembly after oil bath. | 1 | Job | 37,500 ₹37,500 | 30,000 ₹30,000 Lowest |
| 8.00 | Complete Desludging of transformer tank & Radiators. The job includes repairing of the radiator core assembly by way of welding to clog the damaged spots | 1 | Job | 12,200 ₹12,200 | 5,000 ₹5,000 Lowest |
| 9.00 | Providing and fitting of miscellaneous Items like SRBP Tubes, tapes, washers etc. | 1 | Ls | 7,200 ₹7,200 | 6,000 ₹6,000 Lowest |
| 10.00 | Filtration & Filling back of available transformer oil around 700 ltrs (After filtration BDV should be 40 KV) | 700 | ltrs | 24 ₹16,800 | 23 ₹16,100 Lowest |
Tender Value
₹4.7 L
EMD Value
₹9,400
Closing Date
4 Jul 2026, 1:00 pmClosed
Ex Engineer Jalshakti Mech. Div Sgr
Office of the Ex Engineer Jalshakti Mech. Div Sgr
Repairs to 1.6 MVA 33kv/440v Transformer of OLD VT Station of WSS Doodhganga
2026_PHE_313879_2
JSMDS/e-NIT-14 of 06/2026
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
Doodhganga
As Per NIT
2 documents required · 2 mandatory
₹0
₹9,400
4 Jul 2026
29 Jun 2026
4 Jul 2026
29 Jun 2026
4 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Loading of the 1.6 MVA Transformer with the help of heavy-duty crane and platform and then shifting the transformer to the workshop for repairing. The job includes unloading of the transformer at the Workshop. | - | Job | - | - |
| 2 | Labour Charges Opening of transformer unloading from platform, De tanking of complete core coil assembly the job includes complete assembling of the transformer after carrying out the necessary repairs. | - | Job | - | - |
| 3 | Providing and fitting of Complete HT Busing including metal parts, washers, Bushing clamps, washers & arching horns. | - | Job | - | - |
| 4 | Complete servicing of OLTC by way of replacement of damaged roller contacts, spring, gear etc. | - | Job | - | - |
| 5 | Fixing of HT Coil of R Phase found in short condition, the job involves very high technical experts and precision opening & fixing back of damaged winding disc in the coil. | - | Job | - | - |
| 6 | Fresh Delta Connection required on HT Side, the job also includes brazing HT Metal Parts & Frame setup. | - | Job | - | - |
| 7 | Hot oil bath of complete Core Coil Assy. before shifting for Heat Treatment. The job includes heat treatment of complete core coil assembly after oil bath. | - | Job | - | - |
| 8 | Complete Desludging of transformer tank & Radiators. The job includes repairing of the radiator core assembly by way of welding to clog the damaged spots | - | Job | - | - |
| 9 | Providing and fitting of miscellaneous Items like SRBP Tubes, tapes, washers etc. | - | Ls | - | - |
| 10 | Filtration & Filling back of available transformer oil around 700 ltrs (After filtration BDV should be 40 KV) | - | ltrs | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_1016084.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .