| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹71.7 LAccepted-AOC 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | 1 | Accepted-AOC Being lowest bidder | |
| 2 | 2₹75.8 L+₹4.1 L (5.76%)Rejected-Finance | 2 | Rejected-Finance Not being lowest bidder | |
| 3 | 3₹94.7 L+₹23.0 L (32.0%)Rejected-Finance NO 3 WD BUILDING JP AGARWALLA ROAD BHARALUMUKH KAMRUP ASSAM 781009 UDYAM AS 03 0009483 | KAMRUP METRO | ASSAM | 781009 | 3 | Rejected-Finance Not being lowest bidder | |
| 4 | 4₹1.0 Cr+₹32.2 L (44.9%)Rejected-Finance | 4 | Rejected-Finance Not being lowest bidder |
Tender Value
₹72 L
EMD Value
₹1.3 L
Closing Date
12 Sept 2022, 6:00 pmClosed
CE AF SHILLONG ZONE
HQ CHIEF ENGINEER AF SHILLONG ZONE MILITARY ENGINEER SERVICES ELEPHANT FALLS CAMP PO NONGLYER SHILLONG 793009
PROVN OF RING MAIN SYSTEM OF ELECTRICITY AND UPGRADATION OF DG SET FOR PUMP HOUSE PHASE I AT AF STN LAITKOR PEAK UNDER GE I AF SHILLONG
2022_MES_542346_1
88980/SHL/E8
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
GE I AF SHILLONG
As per NIT
7 documents required · 7 mandatory
₹1,000
Yes
GE I AF SHILLONG
₹1.3 L
Yes
7 Oct 2022
1 Aug 2022
14 Sept 2022
1 Aug 2022
12 Sept 2022
29 Aug 2022
Amount
Excavation in trenches not. exc 1.5 m wide and not exceeding 1.5 m in depth for foundation etc drain, manhole, laying of cable / pipe not exceeding 10 Sqm on plan and not exceeding 1.5mtr in depth and getting out in soft/loose soil complete all as specified and as directed.
Returning, filling in trenches including spreading leveling, watering and well ramming in layers not exceeding 25 cm thick in soft/loose soil complete all as specified and as directed.
Removing excavated soil to a distance not exceeding 50 m and depositing where directed at a level, not exceeding 1.5 metre above the starting point complete all as specified and as directed.
Supply and spreading dry coarse sand in trenches for protection of underground electric cable, spread in uniform 23 cm thickness and punned down gently to 18 cm complete all as specified and as directed. Note: Punned thickness shall be measured and paid.
Supply and laying un-reinforced precast concrete cable cover, class HV, type 1 , flat, size 300mm x 180mm x 40mm complete all as specified and directed.
Supply, laying and testing HT XLPE cable insulated screened, PVC bedded, galvanized steel strip/wire armoured, electric power cables (Heavy duty) with aluminium conductor 11000 volts, Earthed grade of size 120 sqmm 3.0 core, complete all as specified and as directed. Note: Earth work, Cable protection, sand cushioning shall be measured and paid seperately under respective items.
Material and labour for cable end termination jointing kit indoor type for 11KV (Earthed) grade cable of size 120 sqmm 3 core , cold shrinkable type joint complete with jointing material and accessories all as specified and directed.
Material and labour for cable end termination jointing kit outdoor type for 11KV (Earthed) grade cable of size 120 sqmm 3 core , cold shrinkable type joint complete with jointing material and accessories all as specified and directed.
M & L for 80mm bore galvanised steel tubing, light grade, for cable protection, ISI marked with all fittings and fixed complete to walls and ceilings or laid in trenches / floors, complete all as specified and directed
Supply and fixing HT cable route indicator made out of standard cast iron body firmly mounted on angle iron of size 40mm x 40mm x 5mm & 750mm long along HT cable trench including embedding of route indicator in PCC 1:2:4 type B-1 block of size 15cmx15cmX30cm, complete all as specified and as directed.
M&L for horizontal boring for 100mm bore GI pipe under road, pavement, hard standing at 0.9m to 1.5 m depth from top of road level and insert 100mm medium GI with all necessary fittings and without any damage of road/pavement/hard standing surface complete all as specified and directed. Note :- Necessary earth work shall be carried out and the cost for the same shall be included in the rate quoted for this item.
S&F Expanded metal, cut to length, bent to shape required and tying with and including annealed mild steel wire not less than 0.9mm dia or fixing with galvanised steel staples supplied and fixed complete to wood or steel members (Exceeding 4 Kg/sqm), complete all as specified and directed.
M&L prepration of new steel surfaces of any description not otherwise described over 10 cm width or girth and applying two coats of synthetic enamelled paint over one coat of red oxide Zinc chrome primer complete all as specified and directed.
M&L mild steel Hand rails, half round or other steel section or core for wooden hand rail straight portion, drilled and counter sunk for balusters running bars, for doors, balusters, noising to steps including embedding in concrete and screwing bolts, posts and struts in fencing including cutting tops to shape as directed, drilling holes, notching for wire etc. flat iron fillets (for securing wire mesh etc including all necessary drilled, bolting or rivetting etc and similar work conforming to Fe 410-O of Fe 310-O), complete all as specified and directed.
M & L for earthing complete with Copper earth plate 600 mm X 600 mm X 3.15 mm thick buried vertically in ground to depth not less than 2.25 metres deep below ground level, with top edge of earth plate not less than 1.5 m below ground level, connected to copper earth strip of size 20mmx3mm by means of bolts, nuts, check nuts and washers of galvanized iron or steel besides welding at all joints as shown in drawing and including excavation and earth work, GI pipe light grade 40mm bore for protection of earth wire and connected to continous earth lead on pole/test point, supplying and laying charcoal dust common salt PCC 1:2:4 type B1, chamber and MS angle iron frame 40x40x3mm and RCC cover 40mm thick (1:2:4) type B1 using 20mm graded stone aggregate reinforced with 6mm dia round bars @ 75mm C/C both ways with MS handle 12mm dia, PGI/CI funnel and wire mesh, 20mm dia GI pipe medium grade for watering all as shown in electrical plate No 5 on srl page No 497 of SSR Part I (2009) drawing and connection to earth test point including testing and including dismantling and taking out old earthing complete all as specified and directed. Note :- (i) The cost of earth lead /strip and GI pipe for protection of earth lead/strip upto 7.5m is included in the quoted rate. (ii) The cost of excavation, earth work is included in the quoted rate.
Supply, installation, testing and commissioning of ( 2 LBS + 3 VCB) 5 way RMU, non extendible, motorised outdoor type of rating 630 Amps copper busbar, RMU (Ring main unit) 5-way comprising of 2 No 630 Amps, Motorised Load Break Switches (Comprising two No. Incomers) & 3 Nos. Vacuum Circuit Breaker as Outgoing, with a fault clearing capacity of 21 KA for 3 sec, rated voltage 12 KV, operational voltage- 11 KV, frequency - 50Hz, totally enclosed ring main unit with IP 67 protection for SF6 tank and IP 55 protection for outdoor enclosure with self powered microprocessor based numerical relay with over current and earth fault protection. Entire RMU should be tested for internal arc test of 21 - KA for 1 sec as per IEC 62271-200 standards, Resin cast ring core protection CT on cables 150-75/1 Amp, 5P 10, 2.5 VA- 3 No's. & Resin casting core metering CT 150-75/1 Amp, Cl 1.0, 2.5 VA - 3 No's. on cables, one number fauIt passage indicator per unit, padlock provisions & complete with all accessories. The unit shall include the following with all necessary standard fitting as required at site:- (i) 02 No. 630 Amp motorised Load Break Switches triple pole, single break 3 position as incomer (On, Off and earth having STC capacity 21 KA for 3 seconds with copper bus bar and copper earth bar fitted with fixed type voltage indicator device as per IEC 61958-1 , fully rated with earth switch, spring assisted mechanism, Red/Green Push Button for On/Off Operation, Arc proof hinged type cable cover interlocked with Earth Switch, Air insulated cable boxes and boots suitable for bottom entry front terminal of 3 core cable 120/185/240 Sqmm. (ii) 03 Nos. 630 Amp Motorised Vacuum Circuit Breaker, triple pole, single break 3 position (On, Off and earth having STC capacity 21 KA for 3 seconds with copper bus bar and copper earth bar fitted with fixed type voltage indicator device as per IEC 61958-1, fully rated with earth switch, spring assisted mechanism, Red/Green Push Button for On/Off Operation, Arc proof hinged type cable cover interlocked with Earth Switch, Air insulated cable boxes and boots suitable for bottom entry front termination of 3 core cable 120/185/240 Sqmm.
Contd/- Item No 16.00 (iii) 3O/C + 1E/F self powered relay with Low and High set for Over current and Earth Fault. Relay should have LCD ( 16 x 2). Relay should have facility to trip the breaker from remote commands without shunt trip coil, Last 5 Fault Record With Time stamp, battery pack replaceable from front. (iv) Transformer VCB should be provided with protection scheme for transformer faults like OTI, WTI & Buchholz's relay alaram & trip, along with annunciation and lock-out function (v) Bus Connected PT Unit -1 No. for Metering consisting of following:- Type M: Air Insulated metering module 12KV, 630A, 20KA for 3sec. - 3 Voltage Transformers of the ratio 11KV/√3 / 110V/√3, 25 VA, Class 1.0 with HT fuses on primary side and MCB on secondary side. - 1 Digital MFM to measure Amps, Volts, Frequency, PF, KWH, KVAR. - 1 CFL Illumination. - 1 Space Heater with thermostat. - 1 RYB phase indications. - 1 set Bushings for external busbar connection along :with Busbar cover & Sleeved busbars for coupling. - 2X12 V Battery with battery charger with suitable burden for motor operation. Input 230 V AC & Output 24 V DC. Battery (vi) Programmable Logic Controller for Auto changeover scheme between two incomers shall comprise of following features :- (a) PLC Scheme (Incorporating Basic Auto & Manual feature for by-passing changeover scheme) for Auto Changeover - 1 Set (b) Two Sets of Remote Control Kits for Motorised Isolator Operation (c) One No. PLC Having Communication Ports for future integration with SCADA on MODBUS. (d) One Factory Programmable Logic - Of - Operation permanently stored in PLC as per manufacturers instructions for autochangeover of feeders all as directed by GE, MES and programmable at site
Contd/- Item No 16.00 (e) Two Sets of Signal Converters for PLC Operation. (f) Safety Interlocks Shall be provided as per relevant IEC/IS Standards and Manufacturers directions. (g) The Auto changeover of feeders shall be in minimum time not exceeding 10 to 15 seconds. (h) LED based Capacitive voltage indication fixed type VPIS 9-15 kV (i) Necessay interclocking arrangement for safety and operations U) LBS shall be of ratings 12 KV, 630 A, 20 KA for 3 Sec. (k) One No. Operating Handle for Manual Operation. (I) One No. Manometer. (m) Safety Interlocks Shall be provided as per relevant IEC/IS Standards and Manufacturers directions. (n) Make of Vaccum Interrupter and RMU should be same. (o) Above switchgear shall confirm to all relevant IEC/IS Standards. (p) Manual operation of Load Break switch should be possible without dismantling the motor from RMU. The motor should be fitted in such a way that it should not be outside front covers of RMU (q) Coupling of RMU and Metering module should be with the help of Bolted type arrangement, so that the coupling at site shall be easy. Plug-in type bushing shall not be acceptable. (r) The Cable termination of RMU should be front accessible only. And minimum 3 module should accommodate in one tank to avoid multiple coupling at site. (s) PCC 1:2:4. type B1 using 20 mm graded aggregate for foundation of RMU as per recommendations of manufacturers of directed by EIC. (t) Note - Any other parts/items not specified above but have been considered essential for smooth and safe functioning of the RMU system shall be included in the items and are covered against the quoted rate.
Supply, installation, testing and commissioning of ( 2 LBS + 2 VCB) 4 way RMU, non extendible, motorised outdoor type of rating 630 Amps copper busbar, RMU (Ring main Unit / analysis unit) 4-way comprising of 2 No 630 Amps, Motorised Load Break Switches Comprising two) No. Incomers) & 2 Nos. Vacuum Circuit Breaker as Outgoing, with a fault clearing capacity of 21 KA for 3 sec.rated voltage-12 KV, operational voltage- 11 KV frequency - 50Hz, totally enclosed ring main unit with IP 67 protection for SF6 tank and IP 55 protection for outdoor enclosure with self powered microprocessor based numerical relay with over current and earth fault protection. Entire RMU should be tested for internal arc test of 21 KA for 1 sec as per IEC 62271-200 standarads., Resin cast ring core protection CT on cables 150-75/1 Amp, 5P10, 2.5 VA- 3 Nos. & Resin cast ring core metering CT 150-75/1 Amp, Cl 1.0, 2.5 VA - 3 No's. on cabl s, one number fault passage indicator per unit, padlock provisions & complete with all accessories. The unit shall include the following with all necessary standard fitting as required at site:- (i) 02 No. 630 Amp motorised Load Break Switches triple pole, single break 3 position as incomer (On, Off and earth having STC capacity 21 KA for 3 seconds with copper bus bar and copper earth bar fitted with fixed type voltage indicator device as per IEC 61958-1, fully rated with earth switch, spring assisted mechanism, Red/Green Push Button for On/Off Operation, Arc proof hinged type cable cover interlocked with Earth Switch, Air insulated cable boxes and boots suitable for bottom entry front tervation of 3 core cable 120/185/240 Sqmm (ii) 2 Nos. 630 Amp Motorised Vacuum Circuit Breaker, triple pole, single break 3 position (On, Off and earth having STC capacity 21 KA for 3 seconds with copper bus bar and copper earth bar fitted with fixed type voltage indicator device as per IEC 61958-1, fully rated with earth switch , spring assisted mechanism, Red/Green Push Button for On/Off Operation, Arc proof hinged type cable cover interlocked with Earth Switch, Air insulated cable boxes and boots suitable for bottom entry front termination of 3 core cable 120/185/240 Sqmm.
Contd/- Item No 19.00 (iii) 3O/C + 1 E/F self powered relay with Low and High set for Over current and Earth Fault. Relay should have LCD ( 16 x 2). Relay should have facility to trip the breaker from remote commands without shunt trip coil , Last 5 Fault Record with Time stamp, battery pack replaceable from front. - (1v) Transformer VCB should be provided with protection scheme for transformer faults like OTI , WTI & Buchholz's relay alaram & trip, along with annunciation and lock-out function (v) Bus Connected PT Unit -1 No. for Metering consisting of following:- Type M: Air Insulated metering module 12 KV, 630A, 20KA for 3sec. - 3 Voltage Transformers of the ratio / 11 KV/√3/110/√3, 25KV Class 1.0 with HT fuses on primary side and MCB on secondary side. - 1 Digital MFM to measure Amps, Volts, Frequency, PF, KWH, KVAR. - 1 CFL Illumination. - 1 Space Heater with thermostat. - 1 RYS phase indications. - 1 set Bushings for external busbar connection along with Busbar cover & Sleeved busbars for coupling. - 2X 12 V Battery with battery charger with suitable burden for motor operation. Input 230 V AC & Output 24 V DC. Battery (vi) Programmable Logic Controller for Auto changeover scheme between two incomers shall comprise of following features :- (a) PLC Scheme (Incorporating Basic Auto & Manual feature for by-passing changeover scheme) for Auto Changeover - 1 Set (b) Two Sets of Remote Control Kits for Motorised Isolator Operation (c) One No. PLC Having Communication Ports for future integration with SCADA on MODBUS. (d) One Factory Programmable Logic - Of - Operation permanentaly stored in PLC as per manufacturers instructions for autochangeover of feeders all as directed by GE, MES and programmable at site
Contd/- Item No 19.00 (e) Two Sets of Signal Convertors for PLC Operation. (f) Safety Interlocks Shall be provided as per relevant IEC/IS Standards and Manufacturers directions. (g) The Autochangeover of feeders shall be in minimum time not exceeding 10 to 15 seconds. (h) LED based Capacitive voltage indication fixed type VPIS 9-15 kV (i) Necessay interclocking arrangement for safety and operations (j) LBS shall be of ratings 12 KV, 630 A, 20 KA for 3 Sec. (k) One No. Operationg Handle for Manual Operation. (I) One No. Manometer. (m) Safety Interlocks Shall be provided as per relevant IEC/IS Standards and Manufacturers directions. (n) Make of Vaccum Interrupter and RMU should be same. (o) Above switchgear shall confirm to all relevant IEC/IS Standards. (p) Manual operation of Load Break switch should be possible without dismantling the motor from RMU. The motor should be fitted in such a way that it should not be outside front covers of RMU. (q) Coupling of RMU and Metering module should be with the help of Bolted type arrangement, so that the coupling at site shall be easy. Plug-in type bushing shall not be acceptable. (r) The Cable termination of RMU should be front accessible only. And minimum 3 module should accommodate in one tank to avoid multiple coupling at site. (s) PCC 1 :2:4. type 81 using 20 mm graded aggregate for foundation of RMU as per recommendations of manufacturers of directed by EIC. (t) Note :- Any other parts/items not specified above but have been considered essential for smooth and safe functioning of the RMU system shall be included in the items and are covered against the quoted rate.
Supply, installation, testing and commissioning of ( 1 LBS + 2 VCB) 3 way RMU, non extendible, motorised outdoor type of rating 630 Amps copper busbar, RMU (Ring main unit) 3-way comprising of 1 No 630 Amps, Motorised Load break Switches Comprising) one No. Incomers) & 2 Nos. Vacuum Circuit Breaker as Outgoing, with a fault clearing capacity of 21 KA for 3 sec.rated voltage 12 KV, operational voltage- 11 KV, frequency - 50Hz, totally enclosed ring main unit with IP 67 protection for SF6 tank and IP 55 protection for outdoor enclosure with self powered microprocessor based numerical relay with over current and earth fault protection . Entire RMU should be tested for internal arc test of 21 KA for 1 sec as per IEC 62271-200 standards, Resin cast ring core protection CT on cables 150-75/ 1 Amp, 5P10, 2.5 VA- 3 No's. & Resin cast ring core metering CT 150-75/1 Amp, Cl 1 0, 2.5 VA - 3 No's. on cables, one number fault passage indicator per unit, padlock provisions & complete with all accessories. The unit shall include the following with all necessary standard fitting as required at site:- (i) 01 No. 630 Amp motorised Load Break Switches triple pole, single break 3 position as incomer (On, Off and earth having STC capacity 21 KA for 3 seconds with copper bus bar and copper earth bar fitted with fixed type voltage indicator device as per IEC 61958-1, fully rated with earth switch, spring assisted mechanism, Red/Green Push Button for On/Off Operation, Arc proof hinged type cable cover interlocked with Earth Switch, Air insulated cable boxes and boots suitable for bottom entry front termination of 3 core cable 120/185/240 Sqmm (ii) 2 Nos. 630 Amp Motorised Vacuum Circuit Breaker, triple pole, single break 3 position (On , Off and earth having STC capacity 21 KA for 3 seconds with copper bus bar and copper earth bar fitted with fixed type voltage indicator device as per IEC 61958-1, fully rated with earth switch, spring assisted mechanism, Red/Green Push Button for On/Off Operation, Arc proof hinged type cable cover interlocked with Earth Switch, Air insulated cable boxes and boots suitable for bottom entry front termination of 3 core cable 120/185/240 Sqmm.
Contd/- Item No 22.00 (iii) 3O/C + 1 E/F self powered relay with Low and High set for Over current and Earth Fault. Relay should have LCD ( 16 x 2) . Relay should have facility to trip the breaker from remote commands without shunt trip coil , Last 5 Fault Record with Time stamp, battery pack replaceable from front. (iv) Transformer VCB should be provided with protection scheme for transformer faults like OTI , WTI & Buchholz's relay alaram & trip, along with annunciation and lock-out function (v) Bus Connected PT Unit -1 No. for Metering consisting of following:- Type M: Air Insulated metering module 12KV, 630A, 20KA for 3sec. - 3 Voltage Transformers of the ratio 11KV/√3 / 110V/√3, 25 VA, Class 1.0 with HT fuses on primary side and MCB on secondary side. - 1 Digital MFM to measure Amps, Volts, Frequency, PF, KWH, KVAR. - 1 CFL Illumination. - 1 Space Heater with thermostat. - 1 RYB phase indications. - 1 set Bushings for external busbar connection along with Busbar cover & Sleeved busbars for coupling. - 2X12 V Battery with battery charger with suitable burden for motor operation. Input 230 V AC & Output 24 V DC. Battery (vi) Programmable Logic Controller for Auto changeover scheme between two incomers shall comprise of following features :- . (a) PLC Scheme (Incorporating Basic Auto & Manual feature for by-passing changeover scheme) for Auto Changeover - 1 Set (b) Two Sets of Remote Control Kits for Motorised Isolator Operation (c) One No. PLC Having Communication Ports for future integration with SCADA on MODBUS. (d) One Factory Programmable Logic - Of - Operation permanentaly stored in PLC as per manufacturers instructions for autochangeover of feeders all as directed by GE, MES and programmable at site
Contd/- Item No 22.00 (e) Two Sets of Signal Converters for PLC Operation. (f) Safety Interlocks Shall be provided as per relevant IEC/IS Standards and Manufacturers directions. (g) The Autochangeover of feeders shall be in minimum time not exceeding 10 to 15 seconds. (h) LED based Capacitive voltage indication fixed type VPIS 9-15 kV (i) Necessay interclocking arrangement for safety and operations (j)) LBS shall be of ratings 12 KV, 630 A, 20 KA for 3 Sec. (k) One No. Operationg Handle for Manual Operation. (I) One No. Manometer. (m) Safety Interlocks Shall be provided as per relevant IEC/IS Standards and Manufacturers directions. (n) Make of Vaccum Interrupter and RMU should be same. (o) Above switchgear shall confirm to all relevant IEC/IS Standards. (p) Manual operation of Load Break switch should be possible without dismantling the motor from RMU. The motor should be fitted in such a way that it should not be outside front covers of RMU. (q) Coupling of RMU and Metering module should be with the help of Bolted type arrangement, so that the coupling at site shall be easy. Plug-in type bushing shall not be acceptable. (r) The Cable termination of RMU should be front accessible only. And minimum 3 module should accommodate in one tank to avoid multiple coupling at site. (s) PCC 1 :24. type B 1 using 20 mm graded aggregate for foundation of RMU as per recommendations of manufacturers of directed by EIC. (t) Note :- Any other parts/items not specified above but have been considered essential for smooth and safe functioning of the RMU system shall be included in the items and are covered against the quoted rate.
Supply, installation, testing and commissioning of ( 1 LBS + 4 VCB) 5 way RMU, non extendible, motorised outdoor type of rating 630 Amps copper busbar, RMU (Ring main unit) 5-way comprising of 1 No 630 Amps, Motorised Load Break Switches (Comprising one No. Incomers) & 4 Nos. Vacuum Circuit Breaker as Outgoing, with a fault clearing capacity of 21 KA for 3 sec.rated voltage 12 KV, operational ,voltage- 11 KV, frequency - 50Hz, totally enclosed ring main unit with IP 67 protection for SF6 tank and IP 55 protection for outdoor enclosure with self powered microprocessor based numerical relay with over current and earth fault protection. Entire RMU should be tested for internal arc test of 21 KA for 1 sec as per IEC 62271-200 standarads., Resin cast ring core protection CT on cables 150-75/1 Amp, 5P10, 2.5 VA- 3 No's. & Resin cast ring core metering CT 150-75/1 Amp, Cl 1.0, 2.5 VA - 3 No's. on cables, one number fault passage indicator per unit, padlock provisions & complete with all accessories. The unit shall include the following with all necessary standard fitting as required at site:- (i) 01 No. 630 Amp motorised Load Break Switches triple pole, single break 3 position as incomer (On, Off and earth having STC capacity 21 KA for 3 seconds with copper bus bar and copper earth bar fitted with fixed type voltage indicator device as per IEC 61958-1, fully rated with earth switch, spring assisted mechanism, Red/Green Push Button for On/Off Operation, Arc proof hinged .type cable cover interlocked with Earth Switch, Air insulated cable boxes and boots suitable for bottom entry front termintion of 3 core cable 120/185/240 Sqmm. (ii) 04 Nos. 630 Amp Motorised Vacuum Circuit Breaker, triple pole, single break 3 position (On, Off and earth having STC capacity 21 KA for 3 seconds with copper bus bar and copper earth bar fitted with fixed type voltage indicator device as per IEC 61958-1, fully rated with earth switch, spring assisted machanism, Red/Green Push Button for On/Off Operation, Arc proof hinged type cable cover interlocked with Earth Switch, Air insulated cable boxes and boots suitable for bottom entry front termination of 3 core cable 120/185/240 Sqmm.
Contd/- Item No 25.00 (iii) 3O/C + 1 E/F self powered relay with Low and High set for Over current and Earth Fault. Relay should have LCD ( 16 x 2). Relay should have facility to trip the breaker from remote commands without shunt trip coil , Last 5 Fault Record with Time stamp, battery pack replaceable from front. (iv) Transformer VCB should be provided with protection scheme for transformer faults like OTI , WTI & Buchholz's relay alaram & trip , along with annunciation and lock-out function (v) Bus Connected PT Unit -1 No. for Metering consisting of following :- Type M: Air Insulated metering module 12 KV 630A, 20KA for 3sec. - 3 Voltage Transformers of the ratio 11KV/√3, 110V/√3, 25 VA, Class 1.0 with HT fuses on primary side and MCB on secondary side. - 1 Digital MFM to measure Amps, Volts, Frequency, PF, KWH, KVAR. - 1 CFL Illumination. - 1 Space Heater with thermostat. - 1 RYB phase indications. - 1 set Bushings for external busbar connection along with Busbar cover & Sleeved busbars for coupling. - 2X12 V Battery with battery charger with suitable burden for motor operation. Input 230 V AC & Output 24 V DC. Battery (vi) Programmable Logic Controller for Auto changeover scheme between two incomers shall comprise of following features :- (a) PLC Scheme (Incorporating Basic Auto & Manual feature for by-passing changeover scheme) for Auto Changeover - 1 Set (b) Two Sets of Remote Control Kits for Motorised Isolator Operation (c) One No. PLC Having Communication Ports for future integration with SCADA on MODBUS. (d) One Factory Programmable Logic - Of - Operation permanentaly stored in PLC as per manufacturers instructions for autochangeover of feeders all as directed by GE, MES and programmable at site
Contd/- Item No 25.00 (e) Two Sets of Signal Convertors for PLC Operation. (f) Safety Interlocks Shall be provided as per relevant IEC/IS Standards and Manufacturers directions. (g) The Autochangeover of feeders shall be in minimum time not exceeding 10 to 15 seconds. (h) LED based Capacitive voltage indication fixed type VPIS 9-15 kV (i) Necessay interclocking arrangement for safety and operations U) LBS shall be of ratings 12 KV, 630 A, 20 KA for 3 Sec. (k) One No. Operationg Handle for Manual Operation. (I) One No. Manometer. (m) Safety Interlocks Shall be provided as per relevant IEC/IS Standards and Manufacturers directions. (n) Make of Vaccum Interrupter and RMU should be same. (o) Above switchgear shall confirm to all relevant IEC/IS Standards. (p) Manual operation of Load Break switch should be possible without dismantling the motor from RMU. The motor should be fitted in such a way that it should not be outside front covers of RMU. (q) Coupling of RMU and Metering module should be with the help of Bolted type arrangement, so that the coupling at site shall be easy. Plug-in type bushing shall not be acceptable. (r) The Cable termination of RMU should be front accessible only. And minimum 3 module should accommodate in one tank to avoid multiple coupling at site. (s) PCC 1 :2:4. type B1 using 20 mm graded aggregate for foundation of RMU as per recommendations of manufacturers of directed by EIC. (t) Note :- Any other parts/items not specified above but have been considered essential for smooth and safe functioning of the RMU system shall be included in the items and are covered against the quoted rate.
N.V.ENGINEERING
PURBANCHAL BUILDERS
satyabhama and co
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .