| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.3 LAdmitted-Fee/PreQual/Technical/Finance | -36.11% | ₹28.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹28.4 L+₹10,645.36 (0.38%)Admitted-Fee/PreQual/Technical/Finance | -35.87% | ₹28.4 L+₹10,645.36 (0.38%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹29.4 L+₹1.0 L (3.66%)Admitted-Fee/PreQual/Technical/Finance | -33.77% | ₹29.4 L+₹1.0 L (3.66%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹32.0 L+₹3.7 L (13.1%)Admitted-Fee/PreQual/Technical/Finance | -27.77% | ₹32.0 L+₹3.7 L (13.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹32.1 L+₹3.7 L (13.2%)Admitted-Fee/PreQual/Technical/Finance | -27.70% | ₹32.1 L+₹3.7 L (13.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹44.4 L
EMD Value
₹88,720
Closing Date
20 Aug 2026, 6:00 pmClosed
Executive Engineer
RnB Division Kralpora
Permanent Restoration of Sonthipora Batpora Road and Dar Mohalla Rawathpora Road
2026_PWDJK_320832_2
E tendering NIT No 32/RnB/Kralpora of 2026-27
Open Tender
Civil Works
Percentage
90 days
Kralpora
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Executive Engineer RnB Division Kralpora
₹88,720
25 Aug 2026
13 Aug 2026
21 Aug 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
13 Aug 2026 - 18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, Stacking, Laying, spreading and compacting 75 mm thick graded stone aggregate of size range 63-45 mm size including screening of size range 13.20 mm, supply and stacking of binding material that is Khak Bajree including laying Water Bound Macadam, with specified stone aggregate / stone screening / binding material, including sorting and consolidation with power road roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fill up the interstices, watering and compacting to the required density, including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. (Finished work to be measured complete) as per IRC 19-2005 Specifications. (Graded Crushed Stone aggregate) | 123.19 | Cum | 3,100 | ₹3,81,889 |
| 2Edge Wall | |||||
| 3 | Earth work in excavation for all kinds of soil by manual / mechanical means in trenches for foundation, drains, pipes, cables, etc upto required depth not exceeding 1.5 m in width as well as 10 sqm on plan including dressing of sides and ramming of bottoms, disposal of excavated earth up to a lead as directed by site engineer incharge, disposed soil to be levelled and neatly dressed complete | 10.13 | Cum | 256.85 | ₹2,601.89 |
| 4 | Supply and filling of dry stone soling in foundation trenches tightly handpacked with hand ramming, watering and compacting to required density including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 3.38 | Cum | 1,000 | ₹3,380 |
| 5 | Providing and laying in position cement concrete 1:4:8 grade (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) including curing but excluding the cost of centring and shuttering all work upto plinth level including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 1.69 | Cum | 5,202.9 | ₹8,792.9 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 75 | Sqm | 628.95 | ₹47,171.25 |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 14.06 | Cum | 8,422.45 | ₹1,18,419.65 |
| 8Breast Wall | |||||
| 9 | Earth work in excavation for all kinds of soil by manual / mechanical means in trenches for foundation, drains, pipes, cables, etc upto required depth not exceeding 1.5 m in width as well as 10 sqm on plan including dressing of sides and ramming of bottoms, disposal of excavated earth up to a lead as directed by site engineer incharge, disposed soil to be levelled and neatly dressed complete | 43.2 | Cum | 256.85 | ₹11,095.92 |
| 10 | Supply and filling of dry stone soling in foundation trenches tightly handpacked with hand ramming, watering and compacting to required density including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 7.2 | Cum | 1,000 | ₹7,200 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1068049.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .